Case File
efta-efta00808416DOJ Data Set 9OtherJOB ESTIMATE
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00808416
Pages
5
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
JOB ESTIMATE
REEFCO SERVICES
3439 Kronprindsens Gade, Ste 5
St. Thomas USVI 00802
Date: 217118
Job Number: Little Saint James
Phone:
Fax:
Email:
St. Thomas USVI
Att.
We are pleased to submit the following cost estimate:
Job Description:
Replacment of 18.000 BTU High Efficiency 19 Seer NC Unit in Captain's Office
Fujitsu 18RLB. Unit was badly damaged in hurricane. Install new surge protector on unit.
MATERIALS
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL
1 18.000 Btu High Efficiency 18RLB Fujitsu NC unit
Cost $1888
2.517.33
2.517.33
1 Surge protector
Cost $160
200.00
200.00
MISC
Plumbing-Hose. Clamps. Piping, etc.
150.00
150.00
MISC
Electrical-Wire, connectors. etc.
75.00
75.00
Freight
95.00
Materials total:
3,037.33
Labor of Installation
HOURS
DESCRIPTION
CHARGES
TOTAL
8.00 Installation of new Condenser and Evaporator
101.00
808.00
8.00 Helper
50.00
400.00
Only actual hours worked will be billed at completion of job
Gross Receipt Tax
Inc.
Labor It Tax total:
TERMS: 50% down,50% upon completion of job
Total estimate:
1,208.00
4,245.33
Prices Reflect a 25% markup
Reefco, Services Representative
To use exsistina line set and electrical
Sign
David Van Drieson
Title: President
Customer Representative
Sign
Date
/
/
EFTA00808416
JOB ESTIMATE
REEFCO SERVICES
3439 Kronprindsens Gade, Ste 5
St. Thomas USVI 00802
Date: 217118
Job Number: Little Saint James
Phone:
Fax:
Email:
St. Thomas USVI
Att.
We are pleased to submit the following cost estimate:
Job Description:
Replacment of 18.000 BTU High Efficiency 19 Seer NC Unit in Captain's Office
Fujitsu 18RLB. Unit was badly damaged in hurricane. Install new surge protector on unit.
MATERIALS
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL
1 18.000 Btu High Efficiency 18RLB Fujitsu A/C unit
Cost $1888
2.517.33
2.517.33
1 Surge protector
Cost $160
200.00
200.00
MISC
Plumbing-Hose, Clamps. Piping, etc.
150.00
150.00
MISC
Electrical-Wire, connectors. etc.
75.00
75.00
Freight
95.00
Materials total:
3,037.33
Labor of Installation
HOURS
DESCRIPTION
CHARGES
TOTAL
8.00 Installation of new Condenser and Evaporator
101.00
808.00
8.00 Helper
50.00
400.00
Only actual hours worked will be billed at completion of job
Gross Receipt Tax
Inc.
Labor 14 Tax total:
TERMS: 50% down,50% upon completion of job
Total estimate:
1,208.00
4.245.33
Prices Reflect a 25% markup
Reefco, Services Representative
To use exsistina line set and electrical
Sign
David Van Drieson
Title: President
Customer Representative
Sign
Date
/
/
EFTA00808417
JOB ESTIMATE
REEFCO SERVICES
3439 Kronprindsens Gade, Ste 5
St. Thomas USVI 00802
Date: 217118
Job Number: Little Saint James
Phone:
Fax:
Email:
St. Thomas USVI
Att.
We are pleased to submit the following cost estimate:
Job Description:
Replacment of 18.000 BTU High Efficiency 19 Seer NC Unit in Captain's Office
Fujitsu 18RLB. Unit was badly damaged in hurricane. Install new surge protector on unit.
MATERIALS
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL
1 18.000 Btu High Efficiency 18RLB Fujitsu NC unit
Cost $1888
2.517.33
2.517.33
1 Surge protector
Cost $160
200.00
200.00
MISC
Plumbing-Hose. Clamps. Piping, etc.
150.00
150.00
MISC
Electrical-Wire, connectors. etc.
75.00
75.00
Freight
95.00
Materials total:
3,037.33
Labor of Installation
HOURS
DESCRIPTION
CHARGES
TOTAL
8.00 Installation of new Condenser and Evaporator
101.00
808.00
8.00 Helper
50.00
400.00
Only actual hours worked will be billed at completion of job
Gross Receipt Tax
Inc.
Labor 14 Tax total:
TERMS: 50% down,50% upon completion of job
Total estimate:
1,208.00
4.245.33
Prices Reflect a 25% markup
Reefco, Services Representative
To use exsistina line set and electrical
Sign
David Van Drieson
Title: President
Customer Representative
Sign
Date
/
/
EFTA00808418
JOB ESTIMATE
REEFCO SERVICES
3439 Kronprindsens Gade, Ste 5
St. Thomas USVI 00802
Date: 217118
Job Number: Little Saint James
Phone:
Fax:
Email:
St. Thomas USVI
Att.
We are pleased to submit the following cost estimate:
Job Description:
Replacment of 18.000 BTU High Efficiency 19 Seer NC Unit in Captain's Office
Fujitsu 18RLB. Unit was badly damaged in hurricane. Install new surge protector on unit.
MATERIALS
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL
1 18.000 Btu High Efficiency 18RLB Fujitsu NC unit
Cost $1888
2.517.33
2.517.33
1 Surge protector
Cost $160
200.00
200.00
MISC
Plumbing-Hose. Clamps. Piping, etc.
150.00
150.00
MISC
Electrical-Wire, connectors. etc.
75.00
75.00
Freight
95.00
Materials total:
3,037.33
Labor of Installation
HOURS
DESCRIPTION
CHARGES
TOTAL
8.00 Installation of new Condenser and Evaporator
101.00
808.00
8.00 Helper
50.00
400.00
Only actual hours worked will be billed at completion of job
Gross Receipt Tax
Inc.
Labor It Tax total:
TERMS: 50% down,50% upon completion of job
Total estimate:
1,208.00
4.245.33
Prices Reflect a 25% markup
Reefco, Services Representative
To use exsistina line set and electrical
Sign
David Van Drieson
Title: President
Customer Representative
Sign
Date
/
/
EFTA00808419
JOB ESTIMATE
REEFCO SERVICES
3439 Kronprindsens Gade, Ste 5
St. Thomas USVI 00802
Date: 217118
Job Number: Little Saint James
Phone:
Fax:
Email:
St. Thomas USVI
Att.
We are pleased to submit the following cost estimate:
Job Description:
Replacment of 18.000 BTU High Efficiency 19 Seer NC Unit in Captain's Office
Fujitsu 18RLB. Unit was badly damaged in hurricane. Install new surge protector on unit.
MATERIALS
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL
1 18.000 Btu High Efficiency 18RLB Fujitsu NC unit
Cost $1888
2.517.33
2.517.33
1 Surge protector
Cost $160
200.00
200.00
MISC
Plumbing-Hose, Clamps. Piping, etc.
150.00
150.00
MISC
Electrical-Wire, connectors. etc.
75.00
75.00
Freight
95.00
Materials total:
3,037.33
Labor of Installation
HOURS
DESCRIPTION
CHARGES
TOTAL
8.00 Installation of new Condenser and Evaporator
101.00
808.00
8.00 Helper
50.00
400.00
Only actual hours worked will be billed at completion of job
Gross Receipt Tax
Inc.
Labor 14 Tax total:
TERMS: 50% down,50% upon completion of job
Total estimate:
1,208.00
4.245.33
Prices Reflect a 25% markup
Reefco, Services Representative
To use exsistina line set and electrical
Sign
David Van Drieson
Title: President
Customer Representative
Sign
Date
/
/
EFTA00808420
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.