Skip to main content
Skip to content
Case File
efta-efta00808912DOJ Data Set 9Other

8114/2018

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00808912
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
8114/2018 Gmail - pool quote M Gmail Kyle reeels pool quote Rick Rossi Tue. Aug 14. 2018 at 8.20 AM To: Kyle mann Rick Rossi Inc. 7779 Estate St. Peter St. Thomas. V.100802 Dth22/2018 Byte Rest. for Utile SL James Swimming poet renovalicen Brag pole pod) Remove tiles and prepare for new tiles (195 linear feel bekis add 10% to order Cost of tees and grout not included in quote.Not sure if you1I be using 1 fool of tie or less so cyder wit have lobe adjusted. Remove any hollow amass and faitng plaster as necessary. Clean pod and prepare for new Diamond Bnte pool plaster Super 84e Apply Bonding Kota Apply Diamond BOO pool plaster ( kid 84e ) Add wash and powermosh plaster to expose the finish. Apply KrystaCure lo poster as a wing agent which should eliminate the scaling Pool is ready to be Bled with water. Water supplied by LSJ Total for all materials and labor. 584000.00 This Odudes al labor and materials except tiles and grout. All transportation wit be provided by LSJ 50% deposit needed to order matenals and confirm work Balance due wthn 30 days or Merest of 1.5 added monthly. Thank you for your consideration. Rick Rossi Rick Rossi Inc. 7779 Estate Si. Peter St. Thomas. V.1.00802 08/14/2018 Kite Reavis, for Lithe St James Swimming pool rent/memo (Math pool) Remove tiles and prepare for new tiles (195 linear *el th/us add 10% to order Cost of tiles and grout not Ocluded in quote.Nth sure if you1I be using 1 Tool of tie or less so ceder roil have lobe adjusted. Remove any hollow area's and faitrig plaster as necessary. Clean pool and prepare for new Diamond Bnte pool plaster Super B4e Apply Bonding Kota Apply Diamond Bribe pool plaster ( kid 84e ) Add wash and power wash plaster to expose the finish. Apply Krystaare to plaster as a citing agent which should eliminate the stager; Pod is ready to be filled with water. Water supplied by LSJ Told for all materials and labor. 557500.00 This indudes al labor and materials except files and grout. M transportation w8 be provided by LSJ 50% deposit needed to order materials and confirm work Balance ekewithin 30 days or interest of 1.5 added monlety. Thank you for your consideration. Rick Rossi EFTA00808912

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.