Skip to main content
Skip to content
Case File
efta-efta00808933DOJ Data Set 9Other

A AO Associated Aircraft Group, Inc.

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00808933
Pages
6
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
A AO Associated Aircraft Group, Inc. 32 Griffith Way, Hudson Valley Regional Airport Wappingers Falls. New York 12590 Pho Fax: Date: 3/812019, 1:45 PM Customer Estimate Work Order Quote: Q[SSN REDACTED] CUSTOMER INFORMATION Hyperion Alr,LLC 6100 Red Hook Quarters B3 Saint Thomas. USVI 00802 Reg. No: N722JE 2008 Sikorsky S•76C++ SERIAL: 760750 AUTHORIZE Yes p No Item: 1 - Airworthy Airframe Discrepancy & Corrective Action Comply with 3. 6, and 12 month airframe calendar inspection requirements I/AAN S•78C Airworthiness Limitations 8 Inspection Requirements manual. M.M. Ref: SA4047460.24 Revision: 26 Chapter: 05.20.00 Revision Date: July 31. 2017 Notes: Flat rate applies to shop labor. Any parts related to these inspections that may be required will be added to the invoice. Hours Flat Subtotal 30.800.00 Labor: $30,800.00 Parts: $0.00 Shipping: $0.00 hem Subtotal: $30.800.00 AUTHORIZE 5 Yes No Discrepancy & Corrective Action Comply with 36 month hour airframe inspection requirements I/NW Sikorsky S•76C Airworthiness Limitations 8 Inspection Requirements manual. Item: 2 - Airworthy Airframe M.M. Ref: SA4047-76C-2.1 Revision: 26 Chapter: 05.20.00 Revision Date: July 31, 2017 Notes: Flat rate applies to shop labor. Any parts related to these inspections that may be required will be added to the invoice. Hours Flat Subtotal 28.000.00 Labor: $28,000.00 Parts: $0.00 Shipping: $0.00 Rem Subtotal: $28,000.00 1 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808933 Associated Aircraft Group, Inc.- Phone: Fax: • 3:820191:45:37 PM W O Quote: O[SSN REDACTED] 32 Griffith Way, Hudson Valley Regional Airport, Wappingers Falls. New York 12590 AUTIORI2E 5 Yes No Discrepancy & Corrective Action Hours Subtotal Comply with 25. 50. 100. and 30thour airframe inspection requirements UAIW S.76C Airworthiness Flat 8,400.00 Limitations & Inspection Requirements manual. Item: 3 - Airworthy Airframe M.M. Ref: SA4047-76C-2.1 Revision: 26 Chapter: 05.20-00 Revision Date: July 31. 2017 Remove the 300 hour, since its 275 hours away Please adjust price to exclude the 300hour portion Notes: Flat rate applies to shop labor. Any pans related to these inspections that may be required will be added to the invoice. OW Unit Part Number I EA KAI 00 Description Oil Sample Kit Unit Price 66.55 Subtotal 66.55 Labor: $8,400.00 Parts: $66.55 Shipping: $0.00 hem Subtotal: $8,466.55 AUTICRIZC p Yes [3! No Item: 4 - Airworthy Airframe Discrepancy & Corrective Action Comply with 500 hour airframe inspection requirements I/AIW Sikorsky S-76C Airworthiness Limitations & Inspection Requirements manual. M.M. Ref: SA4047-76C-2.1 Revision: 26 Chapter: 05.20-00 Revision Date: July 31. 2017 Notes: Flat rate applies to shop labor. Any parts related to these inspections that may be required will be added to the invoice. Hours Subtotal Flat 1.120.00 Qty Unit Part Number 8 EACH MS28778-8 Description ORING Unit Price 1.94 Subtotal 15.52 Labor: $1,120.00 Parts: $15.52 Shipping: $0.00 hem Subtotal: $1,135.52 AUTHORIZE 5 Yes No Item: 5 - Airworthy Airframe Discrepancy & Corrective Action Comply with 600 hour airframe inspection requirements I/AIW Sikorsky S-76C Airworthiness Limitations & Inspection Requirements manual. M.M. Ref: SA4047-76C-2.1 Revision: 26 Chapter: 05.20-00 Revision Date: July 31. 2017 Notes: Flat rate applies to shop labor. Any pans related to these inspections that may be required will be added to the invoice. Labor: $11.200.00 Parts: $0.00 Hours Subtotal 80.00 11.200.00 Shipping: $0.00 Item Subtotal: $11.200.00 2 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808934 Associated Aircraft Group, Inc.- Phone: Fax: • 39,20191:45:37 PM W 0 Quote: 0775-03-2019 32 Griffith Way, Hudson Valley Regional Airport, Wappingers Falls. New York 12590 AUTHORIZE O Yes 5i No Discrepancy 8 Corrective Action Comply with 1250 hour airframe inspection requirements I/NW Sikorsky S-76C Airworthiness Limitations 8 Inspection Requirements manual. Item: 6 - Airworthy Airframe M.M. Ref: SA4047-76O4-1 Revision: 26 Chapter: 05.20.00 Revision Date: July 31, 2017 Notes: Labor to disassemble rotor head is included in 36 month airframe inspection. Hours estimated are to comply with 1250 hour inspection and replace bearings. Hours 2.00 Subtotal 280.00 Qty Unit Part Number 4 EA SB5206.202 Description OUTER RACE BEARING.KAHR Unit Price 959.77 Subtotal 3,839.08 Labor: $280.00 Parts: $3,839.08 Shipping: $0.00 Item Subtotal: $4,119.08 AUTHORIZE Yes O No Discrepancy 8 Corrective Action Comply with the following ICAs: Item: 7 - Airworthy Airframe •ICA No. IC00278. S.76 Door Lock Pin kit, 300 hour/t2 month inspection. •ICA No. IC00843. Honeywell MFRD. 300 hour/12 month inspection. •ICA No. IC00916. Silencer Wall Panel System, 300 hour/12 month inspection.. •ICA No. IC00925. Keystone Retractable Boarding Step. 300 hour/12 month inspection. •ICA No. IC01217, Deluxe VIP Interior system, 100 hour/12 month inspection. •ICA No. IC01357, Gamin GMX-200, 300 hour/12 month inspection. •ICA No. IC01421, Garmin GDL•69/GDL.69A Weather Data Receiver, 300 hour/12 month inspection. •ICA No. IC01696, LED External Lights, 50 hour/12 month inspection. •ICA No. IC01812, TrueNorth Simphone SATCOM, 300 hour/12 month inspection. •ICA No. IC01841, UNS-1Fw with LPV Monitor, 300 hour/1500 hour/12 month inspection. •ICA No. 11(7707, Eaton/Tedeco Zapper chip detector system. 500 hour/6 month inspection. •ICA No. IM93.32. 300 hour/t500 hour/12 month inspection and lubrication of Tail Rotor pedals. Hours Subtotal Flat 2.100.00 Labor: $2.100.00 Parts: $0.00 Shipping: $0.00 Item Subtotal: $2.100.00 AUTHORIZE CD Yes Ei No Item: 8 - Airworthy Airframe Discrepancy 8 Corrective Action Send Main Battery. PS-855A Emergency power supply battery, and Grimes emergency light power supply out to Aviall out for 12 month deep cycle/capacity checks. Their estimated costs are below. Outside Repair: AVIALL. INC.. Labor: 1,500.00, Parts: 0.00, Shipping: 0.00 Notes: Charge from Aviall indicated is just an estimate. Actual cost may vary. Labor: $1.500.00 Parts: $0.00 Hours 0.00 Shipping: $0.00 Item Subtotal: $1.500.00 Subtotal 0.00 3 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808935 Associated Aircraft Group, Inc.- Phone: Fax: • 3'8,20191:45:37 PM W 0 Quote: 0775-03-2019 32 Griffith Way, Hudson Valley Regional Airport, Wappingers Falls. New York 12590 AUTHORIZE O Yes al No Item: 9 - Airworthy Airframe Discrepancy & Corrective Action Contract Structural Testing Systems to perform the following inspections: •12 month Pilot Collective Stick NDT •36 month Main Rotor Spindle NDT Their estimated charge is below. Outside Repair: STRUCTURAL TESTING SYSTEMS. INC.. Labor: 1,000.00. Parts:0.00, Shipping:0.00 Notes: Charge from STS indicated is just an estimate. Actual cost may vary. Hours 0.00 Subtotal 0.00 Labor: $1.000.00 Parts: $0.00 Shipping: $0.00 Item Subtotal: $1,000.00 AUTHORIZE ER Yes 0 No Item: 10 - Airworthy Airframe Discrepancy & Corrective Action Contract Duncan Aviation to comply with the following avionics inspections: -12 month 14 CFR 91.207.d ELT Internal visual inspection and ops check. -12 month Avionics Inspection -24 month 14 CFR 91A11/413 Pitot•Static, Altimeter and ATC Transponder checks. Their estimated charge is below. Outside Repair: DUNCAN AVIATION. Labor: 3.000.00, Parts: 0.00, Shipping: 0.00 Notes: Charge from Duncan Aviation indicated is just an estimate. Actual cost may vary. Hours 0.00 Subtotal 0.00 Labor: $3,000.00 Parts: $0.00 Shipping: $0.00 Item Subtotal: $3.000.00 AUTHORIZE Yes O No Discrepancy & Corrective Action Remove and replace all four landing gear float bottles. Item: 11 - Airworthy Airframe Notes: Cost of float bottles indicated is just an estimate. Actual cost will be added to the invoice. Hours Subtotal 10.00 1,400.00 City Unit Part Number 4 EA 813269.1 Description Float bottle Unit Price 14,318.33 Subtotal 57.273.32 Labor: $1,400.00 Parts: $57,273.32 Shipping: $0.00 Item Subtotal: $58,673.32 4 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808936 Associated Aircraft Group, Inc.- Phone: Fax: • 38:20191:45:37 PM W O Quote: O[SSN REDACTED] 32 Griffith Way, Hudson Valley Regional Airport, Wappingers Falls. New York 12590 AUTHORIZE M Yes O No Discrepancy & Corrective Action Remove and rep ace all Tail Rotor control cables . Notes: Cost of Tail Rotor cables indicated is just an estimate. Actual cost will be added to the invoice. Qty Unit Pad Number Description Unit Price Subtotal 1 EACH 76400.03191.046 CABLE 406.64 406.64 1 EACH 76400.03191.050 CABLE 589.85 589.85 1 EACH 76400.03191.051 CABLE 344.11 344.11 1 EACH 76400-03191.059 CABLE 355.90 355.90 Item: 12 - Airworthy Airframe Hours Subtotal 16.00 2.240.00 Labor: $2,240.00 Parts: $1.696.50 Shipping: $0.00 Item Subtotal: $3,936.50 AUTHORIZE O Yes Eg No Item: 13 - Airworthy Airframe Discrepancy & Corrective Action Remove and rep ace all Tail Rotor Driveshaft bearing support assemblies Notes: Cost of pans indicated is just an estimate. Actual cost will be added to the invoice. Qty Unit Part Number Description Unit Price Subtotal 3 EA 76361-04007.042 BEARING SUPPORT 0.00 0.00 12 EACH NAS464P4A5 BOLT 4.94 59.28 12 EACH SS4411.083025NP WASHER 133.38 1,600.56 12 EACH S55086-04 NUT 17.04 204.48 Hours Subtotal 20.00 2,800.00 Labor: $2,800.00 pans: $1,864.32 Shipping: $0.00 Item Subtotal: $4,664.32 AUTHORIZE M Yes No Item: 14 - Airworthy Airframe Discrepancy & Corrective Action Bore scope No. and No. 2 Engines I/AAN Turbomeca 251 Maintenance Manual. Chapter 72. task 72-00-43.200.803-A01. Hours 4.00 Subtotal 560.00 Labor: $560.00 Parts: $0.00 Shipping: $0.00 Item Subtotal: $560.00 5 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808937 Associated Aircraft Group, Inc. - Phone: Fax: - 3/8/2019 1:45:37 PM 32 Griffith Way, Hudson Valley Regional Airport, Wappingers Falls, New York 12590 W/O Quote: 0775-03-2019 Additional Charges Pilot Services Tire Disposal EPA Charge Oil Analysis Shop Supplies Fuel Misc. Subtotal 0.00 0.00 0.00 0.00 1387.50 0.00 0.00 $1.587.50 It will take an estimated 635.00 hours to complete the necessary work. Important Information MISC. CHARGES NOTES: Estimated Arrival Date: April 26th. 2019 Estimated Start Date: April 29th, 2019 Estimated Working days: 23 Estimated Out Date: May 29th. 2019 Total Labor: Total Parts: Total Shipping: Additional Charges: Tax: Total Estimate Before Deposit: Deposit: $94.400.00 $64.755.29 $0.00 $1387.50 $0.00 $160.742.79 $0.00 Total Estimate: $160.742.79 Please note: Down times are just an estimate and are subject to change due to discrepancies found during inspection and/or additions made by customer. Working days are defined as Monday through Friday. unless otherwise discussed with MG. Weekends and Holidays are NOT defined as working days. All maintenance requests not originally quoted are not guaranteed to be performed during scheduled down time due to repair station capacity and part lead times. All additional requests must be coordinated with MG prior to arrival at our facility. Additional charges: Shop Hourly Labor Rate: $140.00 (Straight time) Shop Hourly Labor Rate: $210.00 (Overtime) Labor rates are subject to change. Parts prices are subject to change based on annual price increases A 50% deposit is required upon acceptance of quote. A cost of $2.50 per labor hour will be added to the invoice to cover cost of miscellaneous consumables. All customer upplied parts will incur a 2.5% mark-up for inspection and handling. Prior cuss lion is re• or any work performed on additional discrepancies related to the Work Order. • Larry Visoski Managerityperion Air LLC March 21 2019 Hyperion Air.LLC or Authorized Representative Date Note: this is a PreBuy inspection, responsibility of Labor to be Hyperion Air, LLC (Purchser) / all Parts expense will be Aetna/CVS (seller) responsibility. 6 of 6 Printed by EBis 3 (www.datcomedia.com) EFTA00808938

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainwww.datcomedia.com
Phone4047460
Tail #N722JE
Wire RefRef: SA4047
Wire RefRef: SA4047460

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.