Case File
efta-efta00809743DOJ Data Set 9OtherDS9 Document EFTA00809743
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00809743
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
C
ase s 1
CUSIVInet
Tel:
Email:
Amu
Quotation
Job Name:
Location:
Quote Date:
ECS Quote/Contract Na:
/ Contract
GYM EXPORT II
t-a s,
Onto.
ma re of sat
The Saint James Group
USVI
St Croix, USVI
4-Jan.18
18-11146
Brice GORDON
Unit
EGS
Unit
Unit
Unit
Screen Design Prea
Unit
Glass
Unit
Extended
No.
Guant.
Series Na
Width
Height
Config
Request
Pos/Neg
Finish
Type
Price
Price
1
3
UAI130
72
96
XO
NO
.801-135
BRIM KYNAR
9,16" Clear/Clear (.090" PVB 11141S)
$4,060.52
$12.181.56
2
5
R-L/415501
351/4
61
0
WA
.1001-100
BRIM KYNAR
9116" CleanClear (.090" SOP HS41S)
$1211.23
$6,056.15
3
2
UAI130
96
96
XO or OX
NO
.80/-130
BRNZ KYNAR
9,16" CleanClear (.090" PVB HMIS)
$4,608.36
$9,216.72
Price
1
2
3
4
5
6
Z
g
Price
10
:TOTAL UNITS
Series "Bronze
Film Protection
or lamb
steel Assembly
Anodize (Class
(70% Kynar)
wrapped
Medley. Fl
handles with
to be applied by EGS
covers for exposed fasteners
screws. stainless
1) finish Sill Tracks.
AAMA 2-605 finish
& cart board.
calculations
interior tumb turn.
as per installation instructions
steel wheels. stainless steel lock assembly
10 Water stop angle or water bar
11 Replacement glass
12 Silicone to seal frame cornea
12 Screen ADD : $260.00 per screen
$390.00 per screen
order a Deposit Check: IFS WEEKS
Tote Material Price:
Includes•
EGS "Modem
Blue Max
Button coven
Stainless
21.5R1 Clear
PPG Donner
To be bubble
Delivery to
Excludes:
$27,050.43
Total Quotation(
°Ales Tax;
Export
Sur- Tax:
Delivery Fees:
Contract Price:
127,454.43
g0% Deormit Reaulowl•
$13.72722
Balance due on Delivery:
$13.72722
when ordered with SOD or
when ordered at a later date.
the thirty (30)day period. The installation as provided
Manual. EGS International LW takes no
This proposal is subject to EGS international
to
the
by others
resposibility to
LLC Standard
Dated:
glass tint panel
shall be in
verify that
Terms
1
2
3
a
5
6
7
8
9
Please
Retention
Shoe drawings. engineering
Installation fasteners. grout or shims
Perimeter sealant material
Blue Max film protection
Bituminous paint application
Special warranty(EGS standard warranties apply)
Field testing
Receptor
Indicate Sill Riser Mgt.:
3 34"
Sill Riser Ht.(.80 PSF Max)
a 15:16" Sill Riser Ht.(+130 PSF Max)
Current Delivery Time from receipt of confirmed
Prices
accordance
design
& Condtions
By:
Ali above
subject to change if not
with EGS International
pressure requirements
as enclosed. We
Accepted By:
The Saint lames Group
accepted
of the
solicit
within thirty
LLC Product
products listed
days. Please
Approvals (Miami
above meet
of
Dated:
call
Dade
the requirements
this proposal
EGS to confirm quotation alter
& Florida 2017) and EGS installation
of the customers application.
in which event we promise
By:
your early acceptance
give
work our most careful attention.
EGS International LLC
Customer supplied design pressure requirements in request for quotation.
_I
X
No design pressure were supplied to EGS International LLC ( EGS ) in request (or quotation. EGS
cautions customer to check project design pressure requirements prior to pricing to your customer.
since additional reinforcement or different glass interlayer requirements might need to he incurred
which will result in additional cost increase.
frame sins are final sizes by customer accenting contract_ customer has reviewed all information and accepts all frame sizes,
conlieuations and panel slides as shown above. Any changes after acceptance of contract will incur additional charges and will delay shipment of product.
•3133 SW 25 Street • Pembroke Park , Fl 33009 •
EFTA00809743
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.