kIISMITE
IIARD\VOOD
FLOORING
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
Re: Little St. James
PROPOSAL
August 21, 2018
Install Description:
Bag off and protect adjacent areas as necessary. Remove and discard water damage flooring in the cabana 2
bathroom. Supply and deliver Hakwood's %- x
engineered, unfinished, prime grade European Oak in
random lengths (6'-8'). Adhere a 90 mil membrane, which reduces moisture vapor transmission, water
intrusion and sound reduction, to the concrete subfloor. Mechanically fasten a'/:' CDX plywood to the
membrane covered concrete subfloor. Adhere Oak plank to the plywood subfloor. Room to be covered is the
pool cabana office and cabana 2 bathroom.
Sand & Finish Description:
Bag off and protect adjacent areas as necessary. Sand Oak plank coarse, medium and fine as necessary. stain to
match approved sample and finish with commercial grade urethane. Rooms to be covered include the cabana
2 bedroom and bathroom and the pool cabana office. At owner's discretion, damaged boards are to be replaced
on a time and materials basis. We assume the wear layer is sufficient to sand.
Job Estimate:
S 38,070.00
Option for 2,500 SF of stock material:
S 34,690.00
Notations:
1.
We assume the subfloor provided for us to be smooth, flat to meet industrs tolerances of 'h" variance over a
10' span, clean and d n•. Any flattening of subfloor to he done on a lime and material% basis.
2. Finished floor height is proposed to be I Mi" from a fat/le s el substrate.
3. Customer understands and accepts that there may be a visible difference in color tone and sheen level between
newly refinished flooring and existing. flooring
4. Furniture, furnishings, appliances, etc. to be removed by others prior to start date.
5.
We assume the wear layer is sufficient to sand,
6. It is recommended that the baseboards, casings. and/or plinth blocks be installed after the flooring.
7. Although AlIF will use reasonable and prudent measures to limit wood dust, it. will be necessary for a final dust
clean-up after our scope of work.
8. Although AHF will be careful not to damage any of the adjacent painted surfaces, it is likely that there will be some
required touch-up painting after our scope of work.
9. Due to the availability of the floorismaterial, estimate is valid for 30 days. After 30 days, estimate is subject to
change.
W. Proposal does not include any permit fees or security deposits.
II. Failure to pay complete contract total voids all warranties i.e. (all warranties expressed or implied).
12. No weekendibolidav work is included in contract price. If weekend/holidav work is required, there will be a
schedule expedition charge to be added on an hourly basis
nature of Representative
1241-B OLD OKEECHOSEE ROAD • WEST PALM BEACH, FL 3,3401 •
EFTA00811327
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refinishedForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.