CROWN BAY MARINA
Hurricane Irma Repair Estimate by Ketih Pomeroy, PFPE & Fran Woods, Meridian L.P.
See Crown Bay Marina Hurricane Damage Evaluation 10 Jan, 2018 by Paul Ferreras, PE
MV Culebra II
9,282
45' Sailboat
55,549
Seatow 40'
347
Carabena
375,959
LS1 1
123,585
Run Aweigh
1,642
Morningstar/ Evening Star
239,947
MV Skyfall 2.0
136,644
Cruz Bay 1
2,242
Sub-total
945,197
Contingency
20%
189,039
Direct cost
1,134,236
Construction Managers Fee
33,082
Construction Supervision
60,000
Total
1,227,318
EFTA00811381
COST ANALYSIS SHEET
Project
CROWN BAY MARINA RECONSTRUCTION
c", sion no
LABOR
MATERIAL
EQUIPMENT
SUB
TOTAL COST
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
TRADES
UNIT PRICE
TOTAL
L511 landing Craft
B Dock 3-5
120'
Finger Pier ea
72'
Demolition
1
LS
15000
15,000
Dolphin Pilings 3-4
6
ea
0
0
0
30000
5000
30.000
Replace Steel Piles
0
ea
6,000
0
Rebuild Finger Pier
1
section
0
11500
11500
0
5000
5,000
16,500
Pile Cap
1
ea
5000
5,000
5.000
Repair Bulk Head
56
II
250
14000
150
8400
100
5600
500
28,000
Side Walk Repair
336
sq.ft.
10
3,360
SUBTOTAL
14000
19900
5600
97.860
OVERHEAD
10%
9.786
FEE
10%
9.786
BOND COST
n/a
GROSS RECEIPTS TAX
5%
6.153
OTHER
TOTAL COST
123,585
1/74/2018
EFTA00811382
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.