Skip to main content
Skip to content
Case File
efta-efta00821057DOJ Data Set 9Other

From: "Jeffrey E." <[email protected]>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00821057
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Jeffrey E." <[email protected]> To: Richard Kahn Subject: Re: Feedback from Mr. Epstein - August 3, 2016 Date: Wed, 17 Aug 2016 15:01:34 +0000 i have to know from amy and czm if they are going to approve otherwsie this is a waste excercise. and expense On Wed, Aug 17, 2016 at 8:39 AM, Richard Kahn are you ok with drawings - are there any revisions you would like made? is it ok to release 5,100 payment to bateman please advise thank you Richard Kahn wrote: Begin forwarded message: From: Daphne Wallace <I Subject: Fwd: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016 Date: August 15, 2016 at 6:04:29 PM EDT To: Jeffrey Epstein [email protected]> Cc: Rich Kahn < >, ann rodriquez Greetings Sir, Preliminary Dock drawings from Jeff Bateman for your review and comments. Respectfully, Daphne Forwarded message From: <1 Date: Aug 15, 2016 5:50 PM Subject: RE: Re: Re: Feedback from Mr. Epstein - \tigtist 3, 2016 To: "Daphne Wallace" Cc: "Ivan Sanchez V" Hi Daphne - Attached is a very preliminary set of plans based on our conversations and direction from Amy. The structural engineer hasn't reviewed, he will as the design gets closer to fruition. Sheet 4 is for the plan and profile of each dock, what is shown is not for this project - NOAA has not verified the water levels for July EFTA00821057 20 yet, so the contours will all change slightly. Once the water levels are verified, we will process the data to generate the profiles. Notes and details will also go on this sheet. Please pass these for review, and let us know your comments. Again, these are preliminary and not a final work product. Thanks and have a great evening !! Jeff Original Message Subject: RE: Re: Re: Feedback from Mr. E stein - August 3, 2016 From: "Daphne Wallace" Date: 8/15/16 7:43 am To: "Jeffrey Bateman" Cc: "ann rodriquez" "Rich Kahn" Greetings Mr. Bateman, Perfect. I will look out for your email. Kind regards, Daphne On Aug 15, 2016 7:17 AM, < wrote: good morning Daphne - we are finalizing the preliminary drawings and will have you something by the end of the day thanks !! Original Message Subject: Re: Re: Feedback from Mr. E stein - Au ust 3, 2016 From: "Daphne Wallace" Date: 8/12/16 4:22 pm To: "Jeffrey Bateman" Greetings Mr. Bateman, "ann rodriquez" Thank you so much. No matter the hour, please feel free to email them to me, and I will forward to Mr. Epstein. He is anxious to see them :) Daphne On Fri, Aug 12, 2016 at 3:21 PM, < > wrote: Hi Daphne - I am awaiting the draft sketches and will forward them as soon as I receive them. They are expected shortly. Thanks and have a great weekend !! Jeff ------- Original Message EFTA00821058 Subject: Re: Feedback from Mr. E stein - Au ust 3, 2016 From: "Daphne Wallace" Date: 8/12/16 3:59 pm To: "Jeffrey Bateman" Cc: "ann rodriquez" Greetings Mr. Bateman, Just checking in with you on the initial drawings for Mr. Epstein's review. Kind regards, Daphne On Wed, Aug 10, 2016 at 2:06 PM, Daphne Wallace Greetings Mr. Bateman, As promised, the lengths of the existing vessels are as follows: Little C (Pro Catamaran) - 36 feet PRD (Cape Horn) - 32 feet Nanna (Rib-tech) - 34 feet Sportis (Sportis) - 34 feet Big N (LMC-8 barge) - 74 feet Pursuit (Pursuit) - 23 feet 6 inches wrote: Pending for the fleet is a 42 foot Nautica boat. Hope this helps. Kind regards, Daphne On Tue, Aug 9, 2016 at 9:23 AM, < wrote: good morning daphne and ann !! hope all is well. i have a couple questions from my engineers that I'd like your feedback on. thanks and have a great day !!! For barge docks (100x15Ft) - Barge specifications. - Capacity (how many barges to be docked at the same time). - Docking purpose. - Facilities needed on dock. - Dock Facilities to propose. - Maritime signaling, buoys and other dock approach requirements. For pleasure dock (100x10Ft) - Boat expectations (biggest boat allowed to dock). - Capacity (how many boats allowed to dock at the same time, considering the biggest ones) - Facilities needed on dock. - Dock Facilities to propose. - Maritime signaling, buoys and other dock approach requirements. Original Message Subject: Feedback from Mr. Epstein - August 3, 2016 From: "Daphne Wallace" -4 Date: 8/3/16 5:26 pm To: "Jeffre Bateman" , "ann rodriquez" Greetings Mr. Bateman, EFTA00821059 Mr. Epstein says the barge docks will need to be 100 feet in length and 15 feet in width. The private dock can be 100 feet in length by 10 feet in width. Please do not hesitate to email or call if you need any additional information, and I will touch base with you on Friday, August 12. Kind regards, Daphne please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation®gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00821060

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.