From: Richard Kahn
To: "Jeffrey E." <[email protected]>
Subject: Fwd: El Brillo Way Sea Wall Bids
Date: Tue, 23 Feb 2016 23:22:04 +0000
Attachments: CCI23022016_2(2).pdf; seawall_repairs_EI_Brillo_palm_beach.doc; Epstein_seawall.pdf
attached are both bids:
original from Dan 29,800 and new bid from Brian 64,915
below Brian explains the differences between both bids
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fa)
ce
Begin forwarded message:
From: Brian Arrandale <[email protected]>
Subject: El Brillo Way Sea Wall Bids
Date: February 23, 2016 at 4:47:07 PM EST
To: Richard Kahn <
Rich,
I looked at both bids closely. I did a quick sketch to help (I hope) visualize whats going on with the sea wall
and what both Contractors are proposing.
The First part of both bids are relatively the same. Remove old sheet piling, pound new sheet piling into the
lake floor a few inches out from the old concrete and pour new concrete. This is meant to help hold back the
base of existing sea wall.
This step will help hold and buy some time, and I would say that both contractors would be in the $30,000.00
range to complete this job.
Step 2 . This is where Pilings Plus would drill 29 manta rays approximately every 5 foot along the sea wall on
an angle down to further reinforce the sea wall. I've enclosed a youtube video link, so you can understand what
a manta ray is and does.
Step 3. Drill 18 weep holes approximately every 8 foot along the sea wall with well points to allow water to
drain out but not the soil.
As the tide rises the water from the lake actually flows behind the sea wall and the water in the ground
will rise with the tides. When the tide goes out the water is trapped behind the sea wall causing hydrostatic
pressure trying to get out. The weep holes allow it to go out reducing hydrostatic pressure.
EFTA00833508
Conclusion: Labontes bid or just installing the new sheet piling and concrete is a one step approach for repair.
Pilings Plus has a multi or 3 step approach for repair that addresses 3 separate issues, and of
course is more costly but likely a more permanent repair.
I hope this helps
Thanks,
Brian
https://youtu.be/Rtq-YFgUQ60
From: David Newmark
Date: February 23, 2016 at 9:57:35 AM EST
To: "[email protected]" <[email protected]>
Subject: El Brillo sea wall re air
Reply-To: David Newmark
Attached is our proposal to repair the seawall at El Brilb. Much of this work have to be done under the existing dock.
If you have any questions, do not hesitate to call.
Eric Newmark, David Newmark
Pilings Plus, Inc.
4856 Bocaire Blvd
EFTA00833509
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01765224
0p
DOJ Data Set 11OtherUnknown
EFTA02328489
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02125460
0p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
4p
DOJ Data Set 11OtherUnknown
EFTA02489202
1p
DOJ Data Set 10OtherUnknown
EFTA02086739