Skip to main content
Skip to content
Case File
efta-efta00833542DOJ Data Set 9Other

From: Richard Kahn

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00833542
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Subject: FW: Quick water supply to GSJ Date: Tue, 23 Feb 2016 01:02:24 +0000 Attachments: IMG_2674.JPG From: Bob Petersen Date: Monday, February 22, 2016 at 1:41 PM To: Richard Kahn Cc: ann rodriquez Subject: RE: Quick water supply to GSJ Richard, Michael Malo Probably the quickest way to get water over to GSJ from Si while future plans are being considered is to procure a water tanker truck and barge it over from LSJ. Tankers can be obtained in several sizes from a couple thousand gallons to 5,000 gallons. Many of the water haulers on St Thomas use 5,000 gallon tankers. The truck could drive to the existing storage cistern on LSJ and fill up, barge it over on the LSJ barge and then pump it from the truck on the barge on the beach at GSJ to the present storage cistern. As we discussed, running a sub aqueous pipeline from LSJ to GSJ is not out of the question but presents several unique problems in environmental permitting, design and installation. The attached photo shows a possible route that is about 6700 feet. This would require a design by a marine engineer and a quote from a professional underwater pipe installation contractor and environmental permitting costs addressed. TSG is not equipped to assist in this endeavor. You would also need a special purpose pumping system to move the water this distance from cistern to cistern. Regarding the small Marine Bluewater RO plants, this is also an option but TSG does not install or service other manufacturer's equipment. TSG is a design-build-operate company that is based on recurring revenue from of the equipment that we design and install. We will be happy to quote a smaller plant than 25Kgals/day. The smallest plant we provide is 10,000 gals/day. We trust you understand our position. Thanks for the chance to provide input today. Call anytime. Best Regards, Bob Petersen From: Richard Kahn (mailto: Sent: Monday, February 22, 2016 12:36 PM To: Bob Petersen Cc: ann rodriquez Subject: Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 EFTA00833542 EFTA00833543

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.