From: Richard Kahn
To: Bob Petersen
Cc: ann rodriquez
Subject: Re: TSG - LSJ Design Approach
Date: Fri, 05 Feb 2016 15:00:56 +0000
Thank you for excellent recap.
Please coordinate your timing for Tuesday am with Anna
Look forward to hearing about your findings next week..
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
10022
to
fax
cell
On Feb 5, 2016, at 9:29 AM, Bob Petersen
> wrote:
Richard,
Thanks for the call yesterday. Am recapping the approach we used at LSJ that worked out well for your consideration on
your future project:
2007 - TSG designed and installed a 25,000 gpd "temporary" RO plant in a 20 ft container and delivered it to the island.
At this time, a larger intake pipe, intake screen and pumping station was designed and built for the final build out plant.
The intake pipe and screen were installed under the main dock by affixing it to the dock pilings. Valving was installed at
the container to allow the seawater pipes to be extended to the main maintenance facility that was under consideration
at that time. The 25K plant was equipped with air conditioning and served as a feed water supply for the concrete plant
and irrigation.
2011— TSG designs and installs a 90,000 gpd plant in the Main maintenance facility. This is now the primary water
supply for the island. The 25,000 gpd plant was retired and removed from the island.
This approach gets a water supply on the island sooner and , being containerized, is able to be moved if design
considerations require and can be collocated with a containerized diesel genset. Another suggestion is to use a
temporary bladder tank for water storage. On Mosquito Island in the BVI, we used the phased approach above and
installed a temporary bladder tank that held 15,000 gallons . The tank is about 30 X 25 ft and can be placed on a liner on
flat ground.
Of course, a second concept is to design and install the full size plant but this requires the complete infrastructure of the
island to be designed and frozen so the location and size of the plant is fixed.
I will have more input after our site visit on Tuesday.
Best Regards,
Bob Petersen — TSG Water Resources USVI
EFTA00835018
EFTA00835019
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01765224
0p
DOJ Data Set 11OtherUnknown
EFTA02328489
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02125460
0p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
4p
DOJ Data Set 11OtherUnknown
EFTA02489202
1p
DOJ Data Set 10OtherUnknown
EFTA02086739
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.