Skip to main content
Skip to content
Case File
efta-efta00836418DOJ Data Set 9Other

From: Richard Kahn

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00836418
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Subject: Palm Beach Renovations Date: Sat, 16 Jan 2016 01:03:01 +0000 Attachments: Epstein_seawall.pdf Inline-Images: IMG_1435.JPG; IMG_1436.JPG; IMG_1437.JPG I spoke with the Brian Arrandale, the new GC you found on El Brillo Way We reviewed the following: I) Sea Wall / Dock - original quote (see attached) from Dan Labonte did not have vendor name so I was unable to contact directly A) would you like Brian to quote same scope of which is to just repair existing structure (see attached) B) quote demolition of existing dock, remove existing floating seawall footer sheets, construct new seawall in front of existing seawall with 8' (or another size) wide dock, install new 122 x 122 concrete piles, install new travertine on new boat dock and install boat lift 2) Windows - Brian is reaching out to window vendor to obtain photos to show you as they will be slightly different that existing wood windows due to heavier framework to support hurricane impact ratings -> Note lead time 16 weeks for windows 3) Spa Room A) quote from Palmer Marble and Tile Inc to provide materials and labor for Spa room floor with 182 x 182 white carrerra marble tiles 9,414.00 Brian crew will remove carpet, the baseboard molding on the floor as marble needs to go under it so it can expand and retract (based on time - estimated -> 3,000.00 Subtotal 12,414.00 GC FEE 15% 1,862.55 Total Cost 14,276.55 -> I have attached photos of existing bathroom white carrerra tiles - note floors are honed down with sealer and are a slightly lighter color then the walls -> Karyna advised Brian that she would like to use darker wall color on Spa room floor - Please confirm this is ok 4) Bedroom Floor Joints -> Plan is to pull up carpet and preserve so it can be reused, then cut out plywood that is sinking and view from 3 sides (2 bedrooms and hallway), bring floor up and support -> Estimated cost for time and materials 6,000 - 10,000 EFTA00836418 Brian can begin Spa Room and Bedroom on Wednesday January 20th Please advise if ok to proceed In addition please advise scope of work for sea wall / dock and if darker carerra marble for floor is ok Thank you Rich On 1/15116, 2:23 PM, "Janusz Banasiak" >Hi Rich here they are > > > > > > > > > > >Sent from my iPhone ll > wrote: EFTA00836419

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.