Skip to main content
Skip to content
Case File
efta-efta00878552DOJ Data Set 9Other

From: emad hanna

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00878552
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: emad hanna To: "Gary Kerney" Cc: Jeffrey Epstein <jeevacation®gmail.com> Subject: Re: Date: Mon, 16 May 2011 21:26:38 +0000 Gary, Other items that I have not seen you respond to are (unless you responded to JE and did not include me on the e mail) Ion Schedule Dock House More People Tile Layer Nursery Floor Mowing Fire Fuel Desalination Mechanical done by 4/17 Thank you Emad Hamm Project Controller HBRK Associates 301 East 66th St Suite 10F New York, NY 10065 Cell LSJ Office St. Thomas NY Office Fax On May 16, 2011, at 2:38 PM, Gary Kemey wrote: schedule for the 4th Main pool the building slab will be poured and block going up the pool equipment will be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes after the building is stoned) still on target for 10/3 Flag pole pool EFTA00878552 the building will be framed in and plastering underway the pool equipment will be in and water in the pool (assumes we get tile selection) the deck will be concrete(tile happens after shelter and plaster) walls will be underway still on target for 9/15 EFTA00878553

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.