Case File
efta-efta00905971DOJ Data Set 9OtherDS9 Document EFTA00905971
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00905971
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
To: [email protected]
Subject: Gil update
Date: Wed, 02 Mar 2011 16:22:12 +0000
Jeffrey,
Gulfstream is planning to work APU and boost pump on second shift today at 3pm, Quality Control is researching and hopes to
approve the T-Stat install that I brought with on plane, the paper work that came with the Tstat is 1970 build date, three
other Tstat's are listed in parts data base system, but are not ready to ship since they are waiting bench testing,. There is also
a pressure test of pneumatic system for Tstat, Gulfstream is checking to see if this break out box is on hand in Long Beach,.
-Boost pump issue's will be addressed by Avionics tonight,. suspect corrosion on canon plug in wheel well, and filter down
stream of pump,. are area's we are looking, in addition to Circuit Breaker integrality, 50amp,.
If you approve of below floor inspection in Long Beach, Gulfstream can start Thursday,.
I will keep you posted,
thanks,
EFTA00905971
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.