Case File
efta-efta00959499DOJ Data Set 9OtherFrom: Jeffrey Epstein <jeevacationggmail.com>
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00959499
Pages
2
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Jeffrey Epstein <jeevacationggmail.com>
To: Ivjet
Subject: Re: GIV ready for test flight
Date: Sat, 27 Apr 2013 02:11:08 +0000
100k in escrow not 50 , and ok for all
On Fri, Apr 26, 2013 at 6:38 PM, <
wrote:
Jeffrey,
I've been having email issues today, not sure if you received my earlier message:
Gulfstream just called, the GIV is ready for test flight tomorrow, engine runs where completed today, if you approve, I will
airline to Palm Bch and view the test flight to guarantee airworthy items have been repaired? I will use Two GIV pilots
from Wayne Hysinga's flight Department who where just laid off due to cut backs in there operation, they are friends of
mine with great GIV experience, I have requested Darren Rothell to observe if he is in town, not confirmed yet.
Our Gil will not be ready till Monday night for engine runs and test flight.
GIV repairs:
- 4 new actuators installed on flaps.
-air cycle machine PSI pressure was repaired by cleaning AB cabin air filter pressurization system.
-auto Throttle split and over temp during climb was repaired by I.G.V. "Inlet Guide Vane" rigging and adjustment, I'm told,
Throttles are perfect match at 1.48 EPR setting.
Do you approve of test flight tomorrow?, We need to give Dennis an answer if we "accept" the GIV per the contract
today, Dennis offered to escrow $50k in order to repair the items below after closing. If flight test is acceptable tomorrow
we can close early next week if you like.
There are 9 "NON" airworthy items require sending indicator panels out for repair. down time is 2 weeks, some interior
and some cockpit related displays, Dennis has agreed to place $50,000 in escrow to cover payment of these items and
open a work order with Gulfstream to remedy these items after closing.
1 - "Standby" fuel gauge totalizer is indicating 200 lbs lower in total mode there is a 150 lbs limit. . standby panel
indicator needs calibration.
2 - LED light burned out on Rate of Climb I FPM on pressurization controller. Panel needs new bulb.
3 - With both engines and APU running and both
converters on DC volts on the Right-Left-AUX or ESS selected intermittently indicated
47.8 VDC. trouble shot system, panel needs calibration, problem is intermittent.
4 - #1 RTU Radio has a vertical line across display on
screen - splits screen in half, Radio control heads needs screen repair.
5 - On RNAV approach VNAV worked and then became
unavailable on approach Repair Rnav receiver.
6 - Standby engine instrument gauge is
indicating all "8888"s on RT HP gauge LED panel needs repair.
7 - cabin management display at VIP and galley
screen hard to read, LED panel needs screen digits repaired.
8 - Satphone is inop Receiver needs repair..
Do you approve of the above?
thank you,
Larry
EFTA00959499
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00959500
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
jeevacationggmail.comEmail
[email protected]Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.