Skip to main content
Skip to content
Case File
efta-efta00986869DOJ Data Set 9Other

From: Lvjet <la>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00986869
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet <la> To: [email protected] Subject: GIV update Date: Wed, 26 Mar 2014 23:51:17 +0000 Jeffrey,. -Gulfstream approved the install of Outflow valve louver,. will complete during 24 month inspection if you like? since we have time, I will obtain price and check into Chrome plating, (not sure if you can chrome, aluminum ?) ***we aborted the baggage door seal install, required removing the door and re-rigging, night shift didn't feel confident they would complete the job, plus I didn't feel they were capable either. working the main entrance door seal check valve and checking Pressure, according to Gulfstream Tech ops, new door seal needs to stretch with usage,. departures in cold climates like we have been experiencing effect the elasticity of the rubber. not sure if I agree, since it was perfect on our first flight? -we did make improvement on down wash lights, new bulbs and three new ballasts being installed. plus installed new ballast on fwd L/H up wash light,. so far so good. I also removed the LED temporary upwash and installed new bulbs,. -change several reading table lights that were inop also. thank you, Larry EFTA00986869

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.