Case File
efta-efta00986869DOJ Data Set 9OtherFrom: Lvjet <la>
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00986869
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet <la>
To: [email protected]
Subject: GIV update
Date: Wed, 26 Mar 2014 23:51:17 +0000
Jeffrey,.
-Gulfstream approved the install of Outflow valve louver,. will complete during 24 month inspection if you like? since we have
time, I will obtain price and check into Chrome plating, (not sure if you can chrome, aluminum ?)
***we aborted the baggage door seal install, required removing the door and re-rigging, night shift didn't feel confident they
would complete the job, plus I didn't feel they were capable either. working the main entrance door seal check valve and
checking Pressure, according to Gulfstream Tech ops, new door seal needs to stretch with usage,. departures in cold climates
like we have been experiencing effect the elasticity of the rubber. not sure if I agree, since it was perfect on our first flight?
-we did make improvement on down wash lights, new bulbs and three new ballasts being installed. plus installed new ballast
on fwd L/H up wash light,. so far so good. I also removed the LED temporary upwash and installed new bulbs,.
-change several reading table lights that were inop also.
thank you,
Larry
EFTA00986869
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.