Text extracted via OCR from the original document. May contain errors from the scanning process.
On Mon, Jun 9, 2014 at 1:56 PM, Richard Kahn
Richard Kahn
HBRK Associates Inc.
Begin fonvarded message:
Cc: Jeanne Brennan
Richard Kahn
>
>, Cecile deJongh wrote:
Good day,
Hope all is well. I wanted to get all info before relaying anything to you. As it stands we can put the tower
at any height we want. DW only recommends the best possible signal path and then gets it approved from
FCC. They however relayed to me that if I choose not to install where recommend, and I get issues with
signal integrity it voids my warranty. I gave them the new coordinates and the lowest we can go at either
location is 30ft. I will be charged to go back to FCC for a new license at this height. So I would like for us
to finalize the location so we can do this just once. Please be advised that this changes the layout on LSJ.
After going over the path study and doing another walk through with Jermaine. I have decided that the best
way to cover the dead spots is to turn five palms and the Kit House into a link and install 4 other bridges at
those locations. This gives us full coverage even at the lower height or changed tower location.
Extra cost adjustment would be about (4) AP-CPEs @ $3,996.00, (4) 802.11 a/n bridges @ $2,516.00, I will
however waive the extra labor cost which brings your total to $26,048.00
Also do we have a decision on weather or not we are servicing customers or just ourselves.
Regards,
Terrence Rabsatt
On Jun 6, 2014, at 10:49 AM, Darren Indyke c wrote:
EFTA00991141
By they, do you mean Dragon Wave? And did Dragon Wave say when the new studies would be
completed? If so, please let me know when. If not, can you get the date of completion from them, please.
Thanks.
DARREN K. INDYKE, PLLC xxxxzzzzxxxxzzzzxxxxzzzzxxxxxxxxx
The information contained in this communication is confidential, may
be attorney-client privileged, and is intended only for the use of the addressee. It is the property of
Darren K. Indyke, PLLC. Unauthorized use, disclosure or copying of this communication
or any pan thereof is strictly prohibited and may be unlawful. If you have received this
communication in error, please notify us immediately by return e-mail,
and destroy this communication and all copies thereof, including all attachments.
Copyright of Darren K. Indyke, PLLC - C 2014 Darren K.
Indyke, PLLC — All rights reserved.
On Jun 5, 2014, at 3:01 PM, Terrence Rabsatt •
> wrote:
Good afternoon sir,
Just letting you know that I have sent all the gps coordinates to DW and they will do the path study along
with giving the lowest height recommend for both locations.
Regards,
Terrence Rabsatt
EFTA00991142
please note
The information contained in this communication is confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this communication in error, please notify us immediately by
return e-mail or by e-mail to
[email protected], and destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00991143