Skip to main content
Skip to content
Case File
efta-efta01004113DOJ Data Set 9Other

From: "Jeffrey E." <[email protected]>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01004113
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Jeffrey E." <[email protected]> To: Richard Kahn • Subject: Re: Zorro Water Development Date: Thu, 02 Aug 2018 20:08:49 +0000 ok On Thu, Aug 2, 2018 at 4:08 PM, Richard Kahn • > wrote: Brice has been working with Casey Cook in order to achieve 68 acre feet by November 1, 2019 under Permit E7871 Note as of date Zorro has achieved 50% of this amount The proposed plan to meet the conditions of the Permit is to apply water to existing grass lands within the 20 acres for grazing of the livestock Brice has not put together a comprehensive budget but estimated total costs would be approximately $125,000 Please advise on the two proposals Brice would like to proceed with: I) Water Reel Irrigation System - $17,565 Brice proposed buying one unit now to run with existing pumps and pipe as a test.. Then during the next few months Brice would work with Casey to design and install new piping system to support 2 units for the 2019 irrigation season http://kifco.corn/OurProducts/Water-Reels/B-SeriesWater-Reels/tabid/102/language/en-US/Default.aspx 2) Replacement of the VFD for well pump in Well B - $13,589 In 2015 the well pump for Well B was upgraded to 50 gpm 3 phase motor and in so a single phase 7.5hp 3 phase VFD was installed Brice says that the existing VFD is very susceptible to voltage fluctuations and currently needs to be reset daily.. Brice expressed that this situation has made it very difficult to achieve a constant water supply for domestic and irrigation purposes.. Brice proposes having RMC Electric install a new VFD with 25hp vs current 7.5hp drive which he believes will allow it to handle the power fluctuations from the power company Please advise Thank you EFTA01004113 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor NeiiMM2 tel fax cell please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01004114

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

URLhttp://kifco.corn/OurProducts/Water-Reels/B-SeriesWater-Reels/tabid/102/language/en-US/Default.aspx

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.