Case File
efta-efta01009566DOJ Data Set 9OtherDS9 Document EFTA01009566
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01009566
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
To: J <[email protected]>
Cc: Kyle reavis
, Rich Kahn
LSJ GSJ
Subject: LSJ Cabana Shower Tile
Date: Thu, 03 Jan 2019 15:44:07 +0000
Attachments: 581221 LSJ CABANA ADD-ON.pdf
Good afternoon
the attached quote is for 500 sqft. of Shower Wall Tile for Cabana's 1.4
Cost: ($8497.50)
Lead time: 5 to 7 days to tropical.
This should be enough to cover fixing areas after floor tile etc is replaced.
If you wish to totally replace wall tile, the order will need to be increased to original order qty of 900 sqfl( $15,229.00 was original order
cost)
How do you wish to proceed?
regards
The Saint James Group
USVI
Ph:
EFTA01009566
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.