Skip to main content
Skip to content
Case File
efta-efta01011131DOJ Data Set 9Other

From: Kyle reavis

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01011131
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Kyle reavis To: J <[email protected]> Cc: Richard a, , LSJ Michael Glidden Subject: Re: Cabana 3 and 4 Plumbing Issue Date: Wed, 19 Dec 2018 18:25:14 +0000 Update; Cabana 3 - tiles have been removed, the plumber is cutting the line now and will finish the plumbing in the morning, then tile will be put back (2 1/2 tiles). Grouted and sealed, then completed. Cabana 4 - wall has been opened up, the area we need to have Jon split has been identified and will be split in the morning. The wall will be patched back and painted tomorrow. Cabana 4 will be done. Pops Garden - All tiles installed, grouted tomorrow. Heli Pad- All tiles removed, installation tomorrow, grout Friday. Kyle On Wed, Dec 19, 2018 at 1:43 PM J <[email protected]> wrote: little i can say On Wed, Dec 19, 2018 at 11:43 AM Kyle reavis < > wrote: Good Morning, The plumbing for the showers in cabana 3 and 4 were run incorrectly by JPKs plumber Brian. He tied in both the hand held shower head and the main shower head into one line instead of two. This means that when you turn on the handle (there are 2) that water comes out of both shower heads. The only way to fix cabana 3 is to remove tiles and split the line the correct way. In cabana 4 they can access the pipes from the backside of the shower wall leaving the tiles in tack. They are going to start the split in 4 first today. I am going to check now to see if we have enough tile to do cabana 3. The plumbing in 1 and 2 were tested today also and have no issues, these two were plumbed by JPKs plumber Jon. We will have Jon do the fix in 3 and 4. Until they open the wall I cannot give an end date on this work. I suggest no payments made to JPK until the work is completed, I know that Jay had paid Brian for all of this work as completed. Jay will be notified by email of these issues immediately. Very Respectfully, Kyle Reavis please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of EFTA01011131 WE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01011132

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.