Skip to main content
Skip to content
Case File
efta-efta01017357DOJ Data Set 9Other

DS9 Document EFTA01017357

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01017357
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: J <[email protected]> Cc: Kyle reavis LSJ GSJ Subject: LSJ Dock Shelter Island Date: Wed, 07 Nov 2018 18:27:55 +0000 Attachments: LSJ_Dockisland.pdf; LSJ_Dock_Shelter Island_Cost.pdf; Faux_wood.jpg; Fuax_White_Wood_finish.jpg Afternoon Attached for your review , drawing of proposed Dock Island color chart for door fronts and Faux wood finishes cost: $26,777.00 lead time: 5 weeks As per the Tiki House, the cabinet bases are 316L Stainless Steel with powder coated Door and Draw Fronts Doors are louvered and backs have cut outs for ventilation. One side for PFD's and Dive gear, the other for Towels, Lotions etc As discussed we will provide countertop, Cabinet could be finished to match white stain , with Gloss Red Wood countertops as previously installed by Brian do you wish to proceed with this option regards Brice Gordon The Saint James Group USVI EFTA01017357

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.