Skip to main content
Skip to content
Case File
efta-efta01048190DOJ Data Set 9Other

From: brice gordon

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01048190
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: brice gordon To: Jeffrey Epstein <[email protected]> Subject: Fwd: LSJ Staff Cottage Date: Tue, 25 Apr 2017 15:04:36 +0000 Attachments: Little_Saintiames,_Manager's_Cottage_AC_Estimate._5_April_2017.xls; Little_Saintiames,Manager's_Living_Room_AC_Estimate._5_April_2017.xls; LSJ SC AC MB.JPG; LSJ_SC_LVR_AC.JPG Attached for your reference On Thursday, April 20, 2017, 9:42 AM, Mark Moskoff < > wrote: David, I apologize, but there was a mis-communication with the skylights. I don't order them frequently, and I forgot that I need to sign a confirmation in order for them to be manufactured. They never sent it, and I forgot to ask for it. The order is in now, and I asked them to put a rush on it. The windows won't be here until May 19th, so hopefully the shutters will be here about the same time. Mark Moskoff MSI Building Supplies AC Units In December 2016 when I did the cottage walk thru, i thought the units would be Ok, just needed a clean up.!! I i nt realize the units where running without filters. id a walk thru on her last visit, and noted the units where in very bad shape and requested proposals from Reefco to replace all three units. Doors and Skylights, David ordered Doors, Windows and Skylights when he did the initial order for lumber, MSI screwed up order, hence delivery delay. May 19th expected Delivery Outstanding items that need to be addressed. 3/6 Furniture Package was forwarded for review. 4/13 Proposal for AC Replacement forwarded to Rich for approval 4/18 E- mail to Danny, Anna and Rich from- To review El anel, Gutter Drain needs to be installed, so Deck can be completed and Exterior Paint can be completed had a verbal conversation with Danny regarding this as well. Danny needs to purchase and install Electrical Panel. TJ and Anna received paint work list frorawhich outlined all his work, which include Cottage Exterior. Go Forward: Danny needs to do Electrical Panel work, and gutter drain. ASAP TJ needs to Start Priming interior tomorrow, paint Thursday Friday kitchen area so David can install base cabinets Monday & Tuesday. Once Base Cabinets are install then Counter person will come and measure. EFTA01048190 Given the Delivery Delay for Doors, Windows and Skylights, David is estimating 3 week before completion. I would anticipate end of May. Forwarded message From: brice gordon Date: Thu, Apr 13, 2017 at 8:35 AM Subject: LSJ Staff Cottage To: Rich Kahn Cc: LSJ GSJ , Anna < >, Daphne Wallace Rich attached photos and proposals to replace the existing mini split AC units in the LSJ Staff Cottage, it does not included Bathroom Ac which also needs to be replaced Reefco missed Bathroom unit and will be forwarding separate proposal, cost should be a little less as it is a smaller unit These units are in very bad condition, missing filters , covers etc Can we proceed with replacement Regards Brice Brice Gordon EFTA01048191

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreference

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.