Case File
efta-efta01078083DOJ Data Set 9OtherDS9 Document EFTA01078083
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01078083
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
-A€1
ATELIER
8 July 2014
RE:
Schedule
Proposed Renderings:
Dining Room
(1) 3D perspective
(1) Rendered Plan
Stair Hall
(3) 3D perspectives: 1" looking toward staircase; 2nd looking toward fireplace;
3ed looking at Upstairs Hall
(1) Rendered Plan
Entry
(1) Rendered Plan and Elevation
Entry Office
(1) 3D Perspective
(1) Rendered Plan
(1) 2D Rendering of the Elevation as one enters the residence thru the Stair Hall into Dining
Room
Proposed Schedule:
End of August-Early September: 1" round of renderings presented, design is refined
End of September-Early October: rd round of renderings presented, design is refined
If required, End of October: 3a round of renderings presented
If not, mid-October design approved
Mid Oct-December — prepare documentation for pricing
December/January 2015 — pricing
January 2015 — begin construction
Amy Cassell Atelier, LCC, Chicago, IL 60657
EFTA01078083
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.