Skip to main content
Skip to content
Case File
efta-efta01078083DOJ Data Set 9Other

DS9 Document EFTA01078083

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01078083
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
-A€1 ATELIER 8 July 2014 RE: Schedule Proposed Renderings: Dining Room (1) 3D perspective (1) Rendered Plan Stair Hall (3) 3D perspectives: 1" looking toward staircase; 2nd looking toward fireplace; 3ed looking at Upstairs Hall (1) Rendered Plan Entry (1) Rendered Plan and Elevation Entry Office (1) 3D Perspective (1) Rendered Plan (1) 2D Rendering of the Elevation as one enters the residence thru the Stair Hall into Dining Room Proposed Schedule: End of August-Early September: 1" round of renderings presented, design is refined End of September-Early October: rd round of renderings presented, design is refined If required, End of October: 3a round of renderings presented If not, mid-October design approved Mid Oct-December — prepare documentation for pricing December/January 2015 — pricing January 2015 — begin construction Amy Cassell Atelier, LCC, Chicago, IL 60657 EFTA01078083

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.