Skip to main content
Skip to content
Case File
efta-efta01083777DOJ Data Set 9Other

BEAUDIN /

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01083777
Pages
17
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
BEAUDIN / GANZE July 15, 2013 Richard Kahn HBRK Associates Inc. New York, New York 10022 RE: Zorro Ranch — Pool/Natatorium System Analysis Project #9357.00 EXECUTIVE SUMMARY consulting engineers, inc. Beaudin Ganze Consulting Engineers was tasked to investigate/analyze and provide recommendations for the ongoing issues related to the existing pool area/natatorium conditioning system. The Existing system is not maintaining industry standards or owner/user required space temperature and or humidification levels. The mechanical system components are not regional and are problematic related to service and maintenance. The site investigation determined that the existing pool conditioning unit is currently inoperable and at the point of diminishing return on repairs versus replacement. Recommendation is replacement with new unit sized to pool room/Natatorium conditions and desired temperatures and humidity. Options for levels of replacement are provided within the report for determination of next step. BGCE always recommends the full modifications to help insure that the end result is a system that function to the best of the owners expectations. BGCE is also aware that budgetary and scheduling constraints have to be accounted for. There are specific baseline modifications that are required for any of the proposed options to perform to any degree of pool space conditioning. The baseline modifications in general are to provide a vapor barrier to control moisture migration into the surround structure and to assist in condensate control. Sincerely, Morgan Royce, PE Associate Principal MBR:mbr 7007 Wyoming NE. Suite F-2. Albuquerque. NM 87109 .p. ALBUQUERQUE AIBUOIROUE DENSER 10111CORINS JENSON WA wwwlsce corn C Istc*of .nibed kAtarlacu Wnsn Eto:acnr Sumseuty6xx EFTA01083777 Zorro Ranch Stanley, NM Pool/Natatorium System Review PREPARED FOR: Richard Kahn New York, New York 10022 BY: BEAUDIN GANZE CONSULTING ENGINEERS, INC. 7007 Wyoming NE. &Ate F-2. Albuquerque, NM 87109 • p. ALBUQUERQUE llBUOLIEROI DOM FORICOUINS EFTA01083778 BEAUDIN/ GANZE consulting engineers. inc. TABLE OF CONTENTS Section Page Introduction 3 Existing Conditions 4 Analysis 6 Recommendations 8 Benefit to Cost Comparison 10 Drawings SUP I 11 SUP Total 12 SUP Option I 13 SUP Option 2 14 SUP Option 3 15 SUP Option 4 16 2IPagc EFTA01083779 BEAUDIN/ GANZE consulting engineers. inc. INTRODUCTION Beaudin Ganze Consulting Engineers was tasked to investigate/analyze and provide recommendations for the ongoing issues related to the existing pool area/natatorium conditioning system. The Existing system is not maintaining industry standards or owner/user required space temperature and or humidification levels. The mechanical system components are not regional and are problematic related to service and maintenance. A site investigation/interview was performed in May of 2013 with Brice Gordon. Owner/User requirements space temperature/humidity and pool temperatures were confirmed and documented for use in the analysis. Existing conditions were noted and available record drawings were made available for use in the analysis. Records of repairs, previous recommendations from manufacturer/contractors, and material quotes were made available for use in the analysis/recommendations. A ductwork camera inspection was performed by JB Henderson to insure that the existing ductwork was in good condition and was not collapsed or restricted in anyway. The inspection determined that there were no obstructions visible and that the ductwork was in good condition. Calculations have been performed in the selection of the proposed replacement equipment to insure viability of connection to the existing utilities. Modifications to the existing system are noted within the report. Wage EFTA01083780 BEAUDIN/ GANZE consulting engineers. inc. EXISTING CONDITIONS The Pool area was completed Circa 2000. The pool area appears to be an upgrade from the original spa room design. There is little documentation related to the alterations made between the spa room to the present pool room. A pool conditioning unit was installed to provide conditioning of the pool space. The unit's operating capacity was scheduled to be a Nominal 5 Ton unit capable of 25 pounds per hour of water with 2,400 cfm air flow at 0.60 inches of external static pressure. The unit power is 208 volt 1 phase 60 hertz with 56 full load amps and an MOCP of 70 amps (fuse size). The unit is water cooled through the main building condenser loop system. The unit is designed to draw a percentage of outside/ventilation air in through a common non pressurized ventilation air duct/plenum that also serves the remainder of the building conditioning systems with ventilation air. The unit is controlled through a room thermostat/humidistat and is connected to the building control system. The unit is provided with condensate drainage. The unit is not connected to the pool heating water system located in a separate area. The unit is fully ducted to the pool room through separate supply and return galvanized sheet metal duct systems. The unit is located in a central mechanical room located in the main building adjacent to the gym/pool. Refer to attached SUP 1 drawing for reference. The pool room is ducted from the pool conditioning unit through a single below grade supply duct (16" diameter per design) that supplies five floor registers located at sole exterior wall with doors with integral windows. Return air is ducted back to the pool conditioning unit through two side wall and two ceiling return grilles located opposite the supply. There is no mechanical exhaust from the pool area. The pool area is fully enclosed with five French doors leading to the exterior and a single French door leading to the interior gym. The pool is located on the ground level of the building with one exterior wall, one interior common wall (gym area) and two sub grade walls (one common to the pool equipment room). Typical wall construction is concrete. The exterior and interior common walls also utilize steel frame construction. The pool has solid surface throughout consisting of plaster ceilings/walls and concrete/tile deck. The roof of the pool is a terrace/porch/deck of the main floor of the building. The insulation values or presence of a vapor bather cannot be determined or confirmed. Operating conditions of the pool/spa are as follows: Unoccupied: Pool water temperature: Spa water temperature: Pool Area Space Temp: Pool Area Humidity: Occupied: Pool water temperature: Spa water temperature : Pool Area Space Temp: Pool Area Humidity: 75 Deg F 75 Deg F 85 Deg F Max 50% 85 Deg F 104 Deg F 85 Deg F Max 50% Occupancy can occur anytime during the year. Prime period of occupancy is May through September. Pool Area Conditions relative to size of pool and surroundings are as follows: Pool Surface Area — Approximately 750 square feet Spa Surface Area — Approximately 120 square feet 4IPage EFTA01083781 BEAUDIN/ GANZE consulting engineers, inc. Wet Deck Area — Approximately 460 square feet Room Volume — Approximately 22,000 cubic feet II I a IS goiairic Pictures: Natatorium Layout 5IP a g EFTA01083782 BEAUDIN/ GANZE consulting engineers. inc. ANALYSIS By simple observation of the pool conditioning unit maintenance/repair records it is apparent that the unit is not maintaining the pool area at the desired/standard space conditions. The unit is at the end of its useful life based on standard engineering practice and based on the amount of repairs the equipment has received over the recent years. The question is not whether a new unit of sufficient capacity should be installed; it is whether a new unit can be installed in the existing system conditions and performs as desired/needed to maintain the standard space conditions. The answer is not likely without additional modifications. The best way to approach what modifications should or could be performed is to look at the standard design practices and compare against the existing pool setup. Indoor Pools or natatoriums are one of the most difficult facilities to design. They are designed for human comfort and enjoyment. And for this reason they have to consider human health and the health of the building. Comfort related to this installation is primarily based on the desired temperature of the water and space. Per the occupied/unoccupied conditions stated the facility is within standard practices, nothing out of the norm. Humidity control related to this installation is based to the space relative humidity and is a direct relation to the comfort conditions and physical conditions of the pool. The optimum condition is 40-60% and is in line with the requested level. This condition is the primary driver on sizing of the pool conditioning equipment. Indoor air quality requirements are typically related to commercial natatoriums but recent studies also recommend for residential facilities. Indoor air quality relates to the chemicals being used in the pool water quality and the amount of people expected in the pool. Certain pool chemical can produce byproducts that are best mitigated using fresh air. Fresh air should be introduced into the pool conditioning system at a rate based on the pool area conditions and intended occupancy. For this project 500 cfm of fresh air is recommended. With the introduction of fresh air comes a need to maintain a negative pressure within the pool air versus the surrounding spaces. The negative pressure insures odors common to a pool are contained within the natatorium. Typical exhaust rates are 20% higher than the fresh air rate or in this case 600 cfm. In natatoriums with spas it is recommended to locate the exhaust intake closest to the spa to capture the highest humidity air and reject to the exterior versus conditioning through the mechanical systems. The existing facility currently has no provisions for exhausting the pool area. Outside air intake is provided but the amount is questionable since the existing pool conditioning unit is not capable of supplying the need air flow to the space. Condensate control is less of condensation occurring but insuring it occurs in the right area. Given the Comfort and humidity factors condensation will occur to some degree. Controlling the degree to which it occurs is the purpose of the condensate control. The two main factors are building envelope and space air flow. Per current design recommendations pool surfaces should be constructed to provide a vapor barrier and thermal barrier compliant with current codes. The simply means a vapor barrier would be provided on the warm side of the walls (winter condition) and insulation would be provided on the exterior side of the vapor barrier. This insures that if condensate does form it does not form within the building structure causing additional damage to the surroundings. Condensation occurs when air (water air mixture) comes into contact with a surface temperature below its dew point, essentially the point at which a gas becomes a liquid. This point and all points for a water air mixture of gas have an associated vapor pressure. This pressure is what is being controlled by the vapor barrier. If no barrier 6IPagc EFTA01083783 BEAUDIN GANZE / consulting engineers, inc. the vapor pressure of the water air mixture will permeate through almost any structure or material to some degree, including concrete. If allowed to condense within the material the material will typical experience an adverse effect. Most common is cracking, mold, and efflorescence (cement materials). It is unclear of the insulation level, presence of a vapor barrier or the arrangement of these materials throughout the natatorium. On this same note interior surfaces that are likely to produce condensate are washed with supply air to absorb condensate and increase the wall surface temperature before damage can occur. This is primary driver in the configuration of the air distribution system. Windows, skylights, areas of low insulation values require air washing to increase the surface temperature. In large volume pools air movement or air change rates typically provide for all other wall ceiling surfaces when vapor barriers and insulation are provided. But area/volumes in ceilings that allow for pockets of stagnant air must also be air washed or broken up to insure condensate does not form or if it does that it is absorbed in the air stream and the surface temperature is increased. Pockets of trapped or stagnant are can have relative humidity levels that can exceed 80% even when the system return is reading 50%. At this time the only surfaces that are provided with an air wash are the windows. Health is related to all the factors discussed. If too hot or too cold or too humid it can cause adverse effect to humans. If condensation forms within structure it can cause mold growth, rust structures, cause excessive un accounted weight to structures, all potential health concerns. Natatoriums are also one of the most costly facilities to maintain and operate even when constructed properly to all design requirements. If anyone of the above factors is not considered correctly then the costs and likely repairs can spiral out of control. Sup 1 Total drawing is provided to show one possible complete mechanical solution to the natatorium conditioning given the current building construction constraints. It does not address the vapor barrier or insulation requirements. 7 1 Page EFTA01083784 BEAUDIN GANZE / consulting engineers, inc. RECOMMENDATIONS The following are mechanical/electrical/plumbing recommendations arranged in order of least cost only. Ranking of solution is typically directly related to cost but will be discussed later in the report. Costs are to be confirmed by contractor/supplier and are opinions at this time, not quotes. For any of the option to be viable certain building element or architectural changes are required. These are considered to be baseline requirements for any of the options presented. Baseline: Provide a water/vapor barrier in the form of a coating that is applied to all the existing interior surfaces of the pool walls and ceiling (One common Manufacturer is Tnemec). Seal all air leaks from the exterior to interior; this includes the air leak from the supply duct into the wall cavity at the water isolation valves. Cost: To be determined by Architect/Contractor dependent on desired final aesthetics of the area but owner. Picture: Access panel to Wall Void — Air Leakage into chase from supply duct below grade. Option #1 Refer to SUP Option 1 Drawing Install a new pool conditioning unit in the exact location of the existing and connect to the existing system conditions (specifically ducting, condenser water, electrical). The new unit will be capable of removing 36 pounds per hour of water at occupied conditions, 95 MBH total cooling capacity, and 67.1 MBH sensible cooling capacity at altitude. Unit air flow is 3800 cfm at 1.5 inches external static pressure and with a variable frequency drive motor for operational turn down during non occupied conditions. Adjustments to air release rates at the supply diffusers, outside air intake and condenser water flow rate. Integration of new unit into existing control system for monitoring operation. Modifications are required to the electrical service at the unit to increase from a 70 amp breaker to an 80 amp breaker. In addition reconfiguration of ductwork at the unit connections and relocation of humidistat/thermostat are required (conduit path to be determined). Cost of Equipment: (quote from Supplier + 2yr Parts/Labor Warranty) $46,171 + NMGRT 8 IP a g EFTA01083785 Cost of Installation/Modifications/adjustments to systems: Total Cost: Option #2 Refer to SUP Option 2 Drawing Same as Option #1 but to include the following: BEAUDIN/ GANZE consulting engineers. inc. $23,000 +NMGRT $69,000 +NMGRT Install an exhaust fan capable of 600 cfm continuously from the pool area. Preferred location of the exhaust intake is above the spa. This unfortunately is not economically viable. Alternate locations of the exhaust fan are: 1. In the wall cavity of the exterior wall (requires access panel, interior/exterior grille, power, ducting, control). 2. In the Pool Equipment Vault (requires concrete wall cut, grille, connection to existing exhaust duct, power, and control). 3. Multiple other options dependent on available budget. Option #1 Cost: Cost of Exhaust: Total Cost: Option #3 Refer to SUP Option 3 Drawing Same as Option #1 but to include the following: $69,000+ NMGRT $5,000 + NMGRT $74,000 +NMGRT Install a new return path from the pool with exhaust; utilize the existing return air path as a supply air path. Pool heating water from the pool conditioning unit will be provided. The existing wall patch located at the common wall of the mechanical room and pool shall be used as the new return air path from the pool area. A soffit shall be created to enclose the new return duct with multiple high return grilles. The path will also allow for piping from the pool conditioning unit to the pool water heating system. The path will also allow for the relocation of the existing humidistat/thermostat to the exterior wall by allowing for a conduit path. The existing return air path will be modified to provide supply air to the ceiling area using the two existing side wall grilles (the ceiling returns will be capped). The exhaust fan will be located in the pool equipment room. Option #1 Cost: Cost of additions: Total Cost: Option #4 Refer to SUP Option 4 Drawing Same as Option #3 but to include the following: $69,000+ NMGRT $20,000 + NMGRT $89,000 +NMGRT Provide additional supply grilles in the ceiling of the pool area. This would require a fair amount of ceiling demolition and patching. Option #3 Cost: $89,000+ NMGRT 9IP a g EFTA01083786 BEAUDIN/ GANZE consulting engineers, inc. Cost of additions: $8,000 + NMGRT Total Cost: $97,000 +NMGRT BENEFITS TO COST COMPARISON First it has to be stated that the only insurable way that a natatorium can be maintained to user expectations is through maintenance of the pool temperature and water chemistry. Any drastic change in these conditions will cause the remaining components to become ineffective. Second is the space temperature and understanding that the pool conditioning system is selected base on set temperature and humidity points. Alterations to these points will keep the system from performing as designed. Baseline requirements if not incorporated will continue to cause degradation of the structure and surfaces of the natatorium and surrounding areas. It will also not guarantee that the pool conditioning system is size appropriately. Option 1 is the minimal modifications that can be done with the hopes of maintaining the natatorium at the desire conditions. This is less of an option as it is a requirement since the current unit is essentially defunct. The benefits of the option are a pool conditioning unit that is sized to handle the pool conditions. The negative to this option is a larger horsepower supply air fan to overcome increased duct static pressure caused by a necessary increase in air flow to the space. Subsequently air noise through the floor grilles will increase based on the 50% increase in air flow. It is unclear as to what level of noise will be experienced. This is similar at the return grilles. It is still likely that the ceilings will form condensation in the winter. It is a guaranteed that the pool odors will continue to spread to the adjacent spaces of the house. Option 2 will benefit beyond option 1 by controlling the odors currently released to the adjacent house and will provide an increased level of indoor air quality. The negative to this option are the same for option I. Option 3 will benefit beyond Option 2/3 by allowing for additional control of air washing over the ceiling and reduced noise at the floor registers. It will also allow for a smaller supply air fan motor horse power or operational point based on reduced duct static pressure (less energy is consumed). The benefit of the heat rejection of the pool conditioning unit to the pool water heating system is made viable by an easy path of installation. The negatives to this option are increased cost and modifications to the aesthetics of the space. Option 4 will benefit beyond Option 3 by provide additional air washing to the ceiling area. The negatives to this option are increased cost and modifications to the aesthetics of the space. End Report 10IPage EFTA01083787 OUT4 I 1,V Ant p4CT Fool. LCMCIA1014941-1 UNIT -VErCenat.. t J A Coore,finte.WA-re-g- 171 ft...4.i AN° 17 0Weg- ZO Oar/ or-1 efirlit-t• F+1 WAtt- foal, bit& 1 erie4 44 pi o 10.0 art. Lk_ Wrtir-/•.a 12•XT air 91a J. {C r -- Ittr ilk•ToL L.le. 74e ctot- r t . as-nAL nseemeni FLoora 14-&-r-1 er..-LLe- W • plaog. +or r st.4 t4, 5-S exteAnlexhavni- &cm petnalif raw • atesz +v. -4.+. Ar. TiP 2 4 100 re Or eicHisier Ast IrriNe 7, c etr4ANLI worrvief..) ct ea-rtitra.4 --r-frz RAIL TeARSCM-0... =—aIL`IrcfiiI I1 f FICACY ea. THIS SET OF DRAWINGS LABELED 'SUP', FOR SUPPLEMENTAL, IS PREPARED BY THE GENERAL CONTRACTOR AS A SUMMARY OF VERBAL INFORMATION, DIRECTIVES AND SKETCHES PROVIDED BY THE OWNER AND HIS DESIGN CONSULTANTS P1 1 ISA NOTES"' itC4.- S CA COLME) -Waal' 01 Ye CB-9•fre.L0 'Pratt "1 /4 - FitalgaaMtr. corr. - LcH, r-4.4cm ex7c: wLectz - T r.0 rt./..0.0 ti sr.= F trce...e.enapmes ) .... j---cv-Adin& Key Per ) 9. i l l In ZORRO RANCH Stanley. New Mexico Description 1 A K0e :>•9.11 Date 3.899 EFTA01083788 wrordea fit V4101- NPW UNIT Co/toed-I-0 eiwrhey eoGiCOCe•c7 t-tew kivuodlit-f- Jortistg.60.1- (A1-) 11-&kit141 ri k 5 Afro pool In wofutiiiee, FitutaniT I An4 coemedee! 40 Pool 14ecifoi epteriemi V-0 -L- fi 6 i;1.1_ 1ht 21sTeP. t,,Je 1-1,1 PLAsTful. FY.- peloCttled .11SI OVA) walLa- frAiefra wl fee. fa I EY•itsd-ar fkg. ItITAHZ - 6A L.GOI —4. Vey Tars-Ace i t THIS SET OF DRAWINGS LABE-LEO 'SUP'. FCR SUPPLEMENTAL. IS PREPARED BY THE GENERAL CONTRACTOR AS A SUMMARY OF VERBAL INFORMATION, DIRECTIVES AND SKETCHES PROVIDED BY THE OWNER AND HIS DESIGN CONSULTANTS P.115I-1 '" a; ES cc, woe, -It-Rex' Of 7s Cer.3•S 4e.j1.o P..62112 212:-L- LArs veArs NF-T ersotc^ ery y. - C.71C. LATH.,...icm 247.Z >3 FLctt ,_ 7-4.-veAvne rsm2m9 4 (24:4,243 kXe.12.Cribq Ya r.t KE-7- ZORRO RANCH Stanley. New Mexico Description <-1 QS,/ ..)•o•nl Date 3 . 8 . 99 EFTA01083789 FPM 3. PAK!' f ie.,SE 00 go °.• 0 El 0 a 1 ZORRO RANCH Stanley. New Mexico 13 BradbarY StatiMI I 0 EFTA01083790 -4 0 1 yS Bradbury Yin Len Wax. El Stamm I 00 PART alksEMENr FL-(=":=Fz. 1=1-.s..14 ZORRO RANCH Stanley. New Mexico EFTA01083791 wI µ if-01 0 UT4 Dog. 1-1011*-V EV11/.54., (AnclAiot4M-Iti -"\ t Goppatk76K.WATele_ AND rovveg- sunif-4-"TI of-1 6'; - eAtrm Form Ea44171J Tool wht, r'17 fooL.1-0,4ya I 471.44-evvi "I to-o L &TEA IA6 71...e rt-oSTBR. ii !reit, f-t Option) ak- ._. i I I l i imLA-f. ie...sttiett , im eat i-ti-11.1 .1P 4 1 4-•• G cve -rw-vt QM, >a. ..car Twee.r s. i'vrto L I r\1 pe,f-w-z-iv Tel Eire/ r‘lociAl-edt 1-6mi,tt.A. 1 f flier roc/ ki Uhk/e4FrirL rA'se-triEnT I=LooFa 000g- 44/7 F11 Li g.; , Cr i.442 F-frf exPAni exA pap l let 4- 11'4 teAttniler NO. irrin•tce)t - 7721.'=1. iti=1;• 6A-i7 e -TAtact P+ .O vie 141 -ty s:CrE.:5 SPA COL,no cn 2.)44..5.:4"yar* 3,4(04. ydr. it. O. ' , VOL. 1-474, - r F.A.vzAo &XL-WM .1y, REV LX.O.. 4 _ 9.1 3mzAce-rL i , p s THIS SET OF DRAWINGS LABELED 'SUP-, FOR SUPPLEMENTAL. IS PREPARED BY THE GENERAL CONTRACTOR AS A SUMMARY OF VERBAL INFORMATION. DIRECTIVES AND SKETCHES PROVIDED BY THE OMER AND HIS DESIGN CONSULTANTS ~CCi 4nO t F11-,+,15 exerzcrse Key Ye: ZORRO RANCH Stanley, Nen Mexico Description 2 cev Dote 3.8-99 EFTA01083792 - - — — igUl vgir 2,400 art9, 32;o QQ a9 0< go, e0h. o PARzr L e3L5Emeur F1-<=ttor:=-. PL.'- g0 a 00 • " • 0 00 ZORRO RANCH Stanley, New Mexico 1914 *V 4I1 W.170 Bradbury I Won Sim Groom U stamm ' EFTA01083793

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreference

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.