Skip to main content
Skip to content
Case File
efta-efta01083978DOJ Data Set 9Other

ProAutomated

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01083978
Pages
4
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
ProAutomated 9 E71st Street E: // P: /F: March 24, 2015 9 E71st Street Proposal 1. PROPOSED LIGHTING STRATEGIES What are the lighting issues in the house? Existing lighting control system is outdated and in need of an upgrade. There are some issues with controlling some existing loads from the outdated panels. Limited controllability with the existing lighting control system. What is ProAutomated proposing? Lutron HomeWorks QS system consisting of: o (1) HomeWorks QS processor o (4) Wireless signal repeaters o (3) Power panels o (77) Lutron wall controls o (20) Dimmable receptacles o (40) Lamp plug for dimmable receptacles o (1) Contact closure interface Programming, testing, and training. What do I get with the proposed option? State-of-the-art lighting control system with many features. Computer-based lighting control system with the ability to control time clock scheduling, scene changes, zone changes, override control, wall control configuration, iPad control, and many more. Energy-saving features such as time clock scheduling and high-end tuning. Personal controls with the ability to task-tune individual lighting in most areas. 2. PROJECT ECONOMICS What is the pricing breakout of the project cost? Lutron Equipment $180,058 Installation $123,200 Programming, Testing, Training $24,700 What about installation? Equipment must be replaced by a licensed electrical contractor selected by ProAutomated. 107 Chesapeake Blvd. Ste 105 Elkton, MD 21921 1 www.proautomated.com EFTA01083978 E: ProAutomated 3. SCOPE OF WORK // P: I/ F: 9 E71st Street March 24, 2015 What scope of work is included? ProAutomated will provide the above listed lighting control equipment. ProAutomated will provide demolition of old lighting equipment and installation of new lighting equipment. ProAutomated will also be providing the programming, testing, and training for the new lighting control system. What scope of work is NOT included in this proposal? Moving of any customer's inventory/materials to access lighting control equipment. 4. PROJECT SCHEDULE Start Date TBD Item 1— Procure and provide lighting equipment to 9 E71st Street Product will be ordered once approval received from the customer. 2-4 weeks. Item 2 — Coordinate shipping and receiving of product Manage shipment and receiving of lamps or fixtures to customer's location. 1 week. Item 3 — Manage installation of lighting control equipment Manage electrical contractor to ensure quality installation of lighting control equipment to project completion. 1-2 weeks. Item 4— Programming and testing of new lighting control system Programming and testing of new lighting control system and training for end user. 1-2 weeks. S. NEXT STEPS Discuss potential start of the project. Who would be the approver that we should talk to? When is your time frame to start the project? What is holding up the proposal from moving forward today? 107 Chesapeake Blvd. Ste 105 Elkton, MD 21921 2 www.proautomated.com EFTA01083979 E: ProAutomated // P: I/ F: LUTRON Client: Contact: Merwin Dela cruz Phone: 212-249-1122 E-Mail: Address: 9 E71st Street, New York, NY 10021 Project: 9 E71st Street Location: New York, NY 10069 Scope: Quote: Lutron HomeWorks QS system consisting of: o (1) HomeWorks QS processor o (4) Wireless signal repeaters o (3) Power panels o (77) Lutron wall controls o (20) Dimmable receptacles o (40) Lamp plug for dimmable receptacles o (1) Contact closure interface Programming, testing, and training. Total Lighting Control Package - $327,958 9 E71st Street March 24, 2015 Project Proposal Proposal is valid for 60 days. Changes to the specified equipment will affect the quote. Quote does not include shipping and sales tax. 107 Chesapeake Blvd. Ste 105 Elkton, MD 21921 3 www.proautomated.com EFTA01083980 ' ProAutomated E: // P: I/ F: 9 E71st Street March 24, 2015 Payment Terms: All invoices are Net 30 days A 1% interest fee per month will be applied to the full amount of any invoice 30 days overdue Product will be invoiced when receipt is confirmed Services will be invoiced when performed when performed. Additional Notes: This quote outlines programming and troubleshooting of project scope items only; any additional troubleshooting and labeling issues will be subject to a charge. Visits scheduled after 6pm or on weekends will incur additional 50% service rate. ProAutomated Service Scheduling: •Email: •Phone: Requirements Before Proiect Start-up: • Signed ProAutomated Proposal form sent: • Via Fax: • Via Email: • Via Mail: 107 Chesapeake Blvd. Ste 105 Elkton, MD 21921 • Either a 50% Deposit by Check or Credit Card • OR a Purchase Order for the full project amount ProAutomated Representative Date Client Representative Date Date 107 Chesapeake Blvd. Ste 105 Elkton, MD 21921 4 www.proautomated.com EFTA01083981

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainwww.proautomated.com
Phone212-249-1122

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.