American Yacht Harbor Facility Condition Status Report September 2015 Addressing specific issues raised July 2015 -- I GY MARINAS EFTA01084560 Hurricane Shutters - Completed Original pictures of the hurricane shutters outside upper level office Pictures of same, repaired and painted in July/August 2015 ,„-- EFTA01084561 Wall Paint - Completed Original Pictures of exterior walls around upper level office 6MINIIMMIONO-01,001° 6. Pictures of same, repaired and painted in July/August 2015 EFTA01084562 Dock beam repairs - Completed Original picture of dock area near slip Picture of same repaired September B-26 2015 EFTA01084563 Main Flag - Completed Original picture of flag with tattered edge Picture of same, replaced July 2015 EFTA01084564 Parking deck walls - Completed Original pictures of lower parking deck Pictures of same, repaired and painted walls July/August 2015 EFTA01084565 Parking Deck Columns - Completed Original picture of column needing paint GARAGE PARKING BEFORE 9AM WITi. CURRENT PASS ON LC)ITERIN OLICITIK 9 Picture of same painted July 2015 — other columns were painted as needed. GARAGE PARKING BEFORE 9AM WITH CURRENT PASS ONLY EFTA01084566 Dock planking — In-Progress Original pictures (4 samples of many) of various dock planking trouble spots Sample pictures of recent and in-progress dock repairs — September 2015 EFTA01084567 Security Fencing — In Progress Original pictures showing fence transition Picture of same. As vegetation in this area regrows, the fencing choice is more understandable. EFTA01084568 Piling wrap — In Progress Original picture of pile with failing wood wrap Sample of a pile with completed wood wrap. A project is underway to replace failed wrapping on 24 concrete piles. Expected completion in October 2015 EFTA01084569 Support columns — In Progress Original pictures of support column bases lifted off brick deck Action Plan: • Bases will be split open, lowered, and reinstalled to be flush with brick deck • Contractor quoted price approx. $75 per columns • 133 columns on B & C (Main) Building, for total price of about $10,000 • Contractor is currently lowering 5 bases to test feasibility • If solution is workable, we will move forward strategically to address most visible columns first, and continue until aesthetics are satisfactory EFTA01084570 Parking Deck Ceiling — In Progress Original pictures of damaged drop ceiling in the lower parking deck Action Plan: • Materials are on order to begin replacement of damaged ceiling tiles, support structure and light fixtures. • Drop ceiling near parking deck entrance is being cut back to be flush and neat with entranceway (areas shown in bottom to picture on the left) • The above efforts will lift aesthetics to acceptable levels while we plan long term solution • Long term replacement or refurbishment options are being explored and quoted for completion in 2016 EFTA01084571 Elevator — In Progress Original pictures of scraped paint on the elevator doors Action Plan: • Doors have been repainted, but elevator use for freight will continually scrape paint • Elevator doors and trim areas are being fitted with stainless steel rub rails/guards to protect paint while remaining aesthetically pleasing • Interior of elevator cab is also being refurbished, including polishing of stainless steel, new paint and new flooring. • Completion expected in Q4 2015 EFTA01084572 Brick Pavers — In Progress Original pictures of various areas of the brick paver deck needing attention Action Plan: • Brick paint is being color custom color matched to better blend repair areas with original brick. • Patch and replacement bricks are installed where need. • Long term resurfacing or repainting option are being explored by local contractors. Two primary options are 1) Coating with a heavy duty masonry paint or 2) removal and replacement of entire system of brick pavers • Either option above will be a significant undertaking, expected to start and complete project in 2016 EFTA01084573 Stairways — In Progress Original pictures of stairways Action Plan: • Local structural engineer Paul Ferreras, PE has inspected the property's stairways and written a letter recommending refurbishment over replacement • Two local welding contractors are producing job quotes to address all structural steel issues with stairways • Concrete stair treads will be painted to match paver bricks on surrounding decks • Steel will be repainted black after above repairs are complete • All repairs expected to be completed in Q4 2015 EFTA01084574 P Dock — In Progress Original pictures of areas around P-Dock Action plan: • P-Dock is owned by 3rd party and slips are managed by AYH • Dock owner is refurbishing entire dock structure and utilities starting October 2015 • AYH/IGY management team working with P- Dock owner to ensure rebuilt dock meets safety and aesthetics standard. • Expected completion January 2016. EFTA01084575

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbished
Wire Refrefurbishing
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.