Skip to main content
Skip to content
Case File
efta-efta01087750DOJ Data Set 9Other

DS9 Document EFTA01087750

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01087750
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Ho? Balbo Construction Corporation "Where quality, commitment and integrity are our trademarks and building is our passion" Licensed Building Contractor General Construction. Hotels to Private Homes Phone Fax E-mail P.O. Box 9435 St. Thomas VI 00801 January 24, 2013 Ms. Jeanne Brennan, Manager Thomas World Air, LLC 6100 Red Hook Qtr, Ste. 83 St. Thomas, U.S. Virgin Islands 00802-1348 SUBJECT: BCC, Inc.'s Quote For the Construction of Thomas World Air, LLC's Fuel Truck Containment Pad, At Cyril E. King International Airport, St. Thomas, Virgin Islands Dear Ms. Brennan, Thank you again for the opportunity to submit our company's quote for the construction of your new Fuel Truck Containment Pad. We have thoroughly reviewed the design plans and specifications dated November 1, 2012 prepared by your architect, The Jaredian Design Group. All work described and incorporated into those design documents have been considered with the exception of any underground or unforeseen circumstances, ie encountering rock or any other unknown utilities not identified therein. Our estimate to perform all of the work includes the following: (I) Clearing the Pad Area; (2)Installing and Maintaining Silt Fence; (3) Site Grading of Pad Area; (4) Compaction of Fill Area; (5) Hauling of Spoil and Fill Materials; (6) Concrete Pads and Sump Pit; (7) Concrete Knee High Perimeter Walls; Saw Cutting of Control Joints in Concrete Pad; Purchase and Installation of Heavy Duty Grates (Miscellaneous Shipping and Transportation Cost; and BCC, Inc.'s Overhead. Given the Scope Of Work as depicted on the design documents, We are pleased to quote you a Construction Cost of One Hundred Thirteen Thousand Six Hundred Twenty Eight Dollars and Sixty Three Cents ($113,628.63). EFTA01087750 Ms. Jeanne Brennan, Manager January 24, 2013 Page 2 Our company has the full complement of project and construction management staff; trades men and laborers as well as equipment capable and immediately available to commence on your project. Please feel free to contact me or my Project Manager, Mr. Brian Turnbull, at 340-201-8806 if you require additional information or clarifications on any aspect of our quote. Thank you again for affording us the opportunity to reconsider and re-evaluate this matter. Si rely, O41 1 The T. erard or, r., —gm' President PC Mrs. Cecile de Jongh, EFTA01087751

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone340-201-8806
Phone802-1348

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.