As
ALT irtROAOS
ASPHALT CORP
Construction Proposal
August 7, 2015
By the Contractor:
For the Project:
Betteroads Asphalt Corporation
#3G Turpentine Road
Estate Bovoni
St. Thomas, VI 00802
United States
1-8593-1L
LSJ_Added Aggregate Base
Little St. James Island
VI
SCOPE OF WORK:
Place and compact 3 inches aggregates base as per plan
TOTAL BASE PRICE:
$90,712.00
Project Totals:
Name
Aggregate
Quantity
Unit Cost
Unit
Crushed stone Aggregate Base
1.360
530M0
Ton
Materials Transport
Trucking and Hauling
68
$400.00
Each
Excavation and Fill
Loading and/or Spreading Base
Structural Compaction
1360
$3.00
$5.00
Mil
Ton
1360
Company Overhead
Company Overhead Percentage
15.00%
$0.00
Percent of Costs
Total Cost
S40.S(X).(X)
$27.200.00
54.050.00
56.800.00
511.832.(g)
Grand Total
$90,712.00
Page I of
LSJ Added Aggregate Proposal
EFTA01087967
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.