Skip to main content
Skip to content
Case File
efta-efta01087967DOJ Data Set 9Other

DS9 Document EFTA01087967

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01087967
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
As ALT irtROAOS ASPHALT CORP Construction Proposal August 7, 2015 By the Contractor: For the Project: Betteroads Asphalt Corporation #3G Turpentine Road Estate Bovoni St. Thomas, VI 00802 United States 1-8593-1L LSJ_Added Aggregate Base Little St. James Island VI SCOPE OF WORK: Place and compact 3 inches aggregates base as per plan TOTAL BASE PRICE: $90,712.00 Project Totals: Name Aggregate Quantity Unit Cost Unit Crushed stone Aggregate Base 1.360 530M0 Ton Materials Transport Trucking and Hauling 68 $400.00 Each Excavation and Fill Loading and/or Spreading Base Structural Compaction 1360 $3.00 $5.00 Mil Ton 1360 Company Overhead Company Overhead Percentage 15.00% $0.00 Percent of Costs Total Cost S40.S(X).(X) $27.200.00 54.050.00 56.800.00 511.832.(g) Grand Total $90,712.00 Page I of LSJ Added Aggregate Proposal EFTA01087967

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.