Skip to main content
Skip to content
Case File
efta-efta01087977DOJ Data Set 9Other

Project # Big N Repair 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01087977
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Project # Big N Repair 2012 Outside Vendor LSJ -Inhouse costs Budget Payments to Date Task Name 1 Dry Dock Haul out 1,350 1,350 $ 1,000 2 Laydays 14 4,900 4,900 $ 3 Pressure Wash 288 288 $ 4 Paint Bottom 7,500 7,500 $ Install Hydraulic cylinders 5 and mountings 2,400 2,400 $ 6 Ramp repair 6,000 6,000 $ 7 Cutlass bearing 500 500 $ Inspect Propellers, shaft, stuffing boxes 8 rudders,steering geal 5,000 5,000 $ 9 Exhaust flex bellows 2,600 2,600 $ Fabricate (2) Hydraulic 10 cylinders 9,630 9,630 $ 11 Fabricate yoke boxes 2,675 2,675 $ 12 Transporation of Cylinders 1,000 1,000 $ 13 Repair Non functioning Gear 750 $ 1,760 $ 2,510 $ 14 Bay Drains 300 $ 400 $ 700 $ 15 Hydraulic pump 470 $ 200 $ 670 $ 16 Clean Engine Room 385 $ 1,470 $ 1,855 $ 17 Shelving 225 $ 900 $ 1,125 $ Clean Watertight 18 compartments $ 1,280 $ 1,280 $ Pilot House doors & 19 windows 1,300 $ 1,170 $ 2,470 $ 20 $ $ 21 22 23 24 Totals 30,538 12,305 4,430 $ 7,180 $ 54,453 $ 1,000 as of 8/25/2012 11:29 AM EFTA01087977

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.