Case File
efta-efta01087977DOJ Data Set 9OtherProject # Big N Repair 2012
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01087977
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Project # Big N Repair 2012
Outside Vendor
LSJ -Inhouse costs
Budget
Payments to Date
Task Name
1
Dry Dock Haul out
1,350
1,350 $
1,000
2
Laydays 14
4,900
4,900 $
3
Pressure Wash
288
288 $
4
Paint Bottom
7,500
7,500 $
Install Hydraulic cylinders
5
and mountings
2,400
2,400 $
6
Ramp repair
6,000
6,000 $
7
Cutlass bearing
500
500 $
Inspect Propellers, shaft,
stuffing boxes
8
rudders,steering geal
5,000
5,000 $
9
Exhaust flex bellows
2,600
2,600 $
Fabricate (2) Hydraulic
10
cylinders
9,630
9,630 $
11
Fabricate yoke boxes
2,675
2,675 $
12
Transporation of Cylinders
1,000
1,000 $
13
Repair Non functioning Gear
750 $
1,760 $
2,510 $
14
Bay Drains
300 $
400 $
700 $
15
Hydraulic pump
470 $
200 $
670 $
16
Clean Engine Room
385
$
1,470 $
1,855 $
17
Shelving
225
$
900 $
1,125 $
Clean Watertight
18
compartments
$
1,280 $
1,280 $
Pilot House doors &
19
windows
1,300 $
1,170 $
2,470 $
20
$
$
21
22
23
24
Totals
30,538
12,305
4,430 $ 7,180 $ 54,453 $
1,000
as of 8/25/2012 11:29 AM
EFTA01087977
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.