Skip to main content
Skip to content
Case File
efta-efta01098766DOJ Data Set 9Other

Danny Vicars

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01098766
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Danny Vicars Project List -Mechanical Building: Complete move-in and organization of electrical shop. -Landscape Lighting: Continue adjustments to landscape lighting-stay late for the next 3-4 weeks to fine tune. -Landscape Lighting Timers: Upgrade timers. -MC Pool: Switch out manifold & filters and install variable speed pumps. -Tunnel: Replacing overhead bulbs and ballasts and dropping down from ceiling for ventilation. -MC: Switch out solar lanterns to new electrical. Have on hand. -Relax Room: Review air conditioning issue with Atlantic. -Info Center: Replace inoperable fan. -Flagpole Pool Cabana: Repair dryer. -Flagpole Pool Cabana: Assist with kitchen renovation. -Library: Review flickering bookshelf lighting and find solution. -Pebble Beach: Check solar system. -Relax Room: Assist with renovations. -Water Pumps: Reset master/slave. EFTA01098766

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.