opelearbzes,
Commercial S. Industrial MVAC Systems 4 Complete Service Contracts • 24 Hour Emergency Senor..
43-15 36th Street Long Island City
New York I 1101
ade l irin
Sid eg
r ies
TEL 7i8 036I • Z8 I I
FAX 7 I 8•36 I "5798
SerVi
C
www.adwinstonservice.com
Epstein Residence
9 East 71st Street
New York, NY 10021
Richard Barnett
Dear Mr. Barnett:
February 28, 2013
Pursuant to our recent survey the following is our proposal to provide
and install the following equipment and services.
SCOPE OF WORK
O Disconnect, remove, and dispose of the old 40-ton Carrier
chiller from basement mechanical equipment room.
O Provide, rig and install (1) new additional 30 ton Multistack
module to attach to the existing chiller.
+ Disconnect, remove and dispose of old BAC Cooling towers
and remote sump.
•
Provide, rig and install (2) new 52-ton BAC galvanized cooling
towers to roof and pipe into existing condenser water system.
•
Provide, rig and install (1) new remote sump (galvanized) in
basement mechanical room and pipe into existing condenser
water system.
O Change filter media on existing sand filter.
O Provide protection to entrance hall and steps for deliveries.
O All necessary materials and labor to pipe chiller.
O All necessary materials and labor to install power wiring for
chiller.
O Insulation of all new chill water piping and damaged
insulation that may be disturbed during tie in of components.
O Chill water and condenser water balancing.
O Rubbish removal and carting away from site
O Factory supervised start-up, and one-year warranty on entire
project.
O Five-year warranty on new compressors (Part only)
O All labor and supervision to complete the above scope of work.
Price: $352,255.00 Three Hundred Fifty Two Thousand Two Hundred
Fifty Five Dollars (plus applicable sales tax) Price valid for 30 days.
EFTA01102364
Add/Alternate: Please add $22,656.00 Twenty Two Thousand Six
Hundred Fifty Six Dollars to the above price for the installation of (2)
VFD's to control the cooling tower fans. (BMS system and/or control
wiring is excluded from this price)
Exclusions: Patching, Painting, Overtime, Electrical control wiring, BMS
work and controls/control valves, Filing of permits if necessary, Sales
tax, and any items not listed in our proposal.
Payment terms: 1//3 upon acceptance, 1/3 upon delivery of equipment
and 1/3 upon completion.
Please sign the approval line should you wish for us to proceed with the
above scope of work.
I thank you for the opportunity of submitting this proposal, and I assure
you of my continued personal attention.
We hereby authorize a.d. winston service. to proceed with the following
scope of work.
Accepted By:
Sincerely,
Michael Palladino
Vice President
2
EFTA01102365
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
www.adwinstonservice.comForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.