Case File
efta-efta01102371DOJ Data Set 9OtherEpstein Residence
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01102371
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Epstein Residence
9 East 71st Street
New York, NY 10021
Richard Barnett
Dear Mr. Barnett:
Commercial 6 Industrial HVAC Systems • Complete Service Contracts • 24 Hour Emergency Service
434 5 36th Stneet Long Island City New York 11101
m718.361.2811
FAX 718.361.5798
www.adwinstonseneice.com
June 19, 2012
Pursuant to our recent survey the following is our proposal to provide
and install the following equipment and services.
SCOPE OF WORK
:• Disconnect, remove, and dispose of the old 40-ton Carrier
chiller from basement mechanical equipment room.
4• Provide, rig and install (1) new additional 30 ton Multistack
module to attach to the existing chiller.
+ Disconnect, remove and dispose of old BAC Cooling towers
and remote sump.
+ Provide, rig and install (2) new 52-ton BAC galvanized cooling
towers to roof and pipe into existing condenser water system.
+ Provide, rig and install (1) new remote sump (galvanized) in
basement mechanical room and pipe into existing condenser
water system.
:• Change filter media on existing sand filter.
•3 Provide protection to entrance hall and steps for deliveries.
•• All necessary materials and labor to pipe chiller.
O All necessary materials and labor to install power wiring for
chiller.
O Insulation of all new chill water piping and damaged
insulation that may be disturbed during tie in of components.
o'• Chill water and condenser water balncing.
O Rubbish removal and carting away from site
O Factory supervised start-up, and one-year warranty on entire
project.
4• Five-year warranty on new compressors (Part only)
+ All labor and supervision to complete the above scope of work.
Price: $357,255.00 Three Hundred Fifty Seven Thousand Two Hundred
Fifty Five Dollars (plus applicable sales tax) Price valid for 30 days.
EFTA01102371
Add/Alternate: Please add $22,656.00 Twenty Two Thousand Six
Hundred Fifty Six Dollars to the above price for the installation of (2)
VFD's to control the cooling tower fans. (BMS system and/or control
wiring is excluded from this price)
Exclusions: Patching, Painting, Overtime, Electrical control wiring, BMS
work and controls/control valves, Filing of permits if necessary, Sales
tax, and any items not listed in our proposal.
Payment terms: 1//3 upon acceptance, 1/3 upon delivery of equipment
and 1/3 upon completion.
Please sign the approval line should you wish for us to proceed with the
above scope of work.
I thank you for the opportunity of submitting this proposal, and I assure
you of my continued personal attention.
We hereby authorize a.d. winston service. to proceed with the following
scope of work.
Accepted By:
S
alladino
Vice President
2
EFTA01102372
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
www.adwinstonseneice.comFax
FAX 718.361.5798Phone
718.361.2811Phone
718.361.5798Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.