JE Punch List —July 11, 2012 Directives

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107280
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —July 11, 2012 Directives 1. Clean Up - Top Desal Plant - Engineering - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment — updated list forwarded 7/10 - Buy new Kawasaki bikes and mules — estimated costs forwarded 7/11 3. Computers - Buy new computers — 2 Macs Desktops & 1 Laptop — Captains Office 4. Five Palms Internet/Phone will be up once switch is installed. Francis to bring 7/14, along with 2 routers - Phone set up left of desk — ready for switch - Wireless inside only — as of date 7/10 via JE - Computer — as of date 7/10 not required via JE - Shield Chains - COMPLETE - Exterior Door Shutters — storm panels for windows - COMPLETE - estimate for double door due 7/13 - Painting - outside to be completed via JE direction - inside to be completed via JE direction - Furniture — outside furniture ordered — due to ship to Tropical 7/12 - Piano Bench — ordered 7/10 — Sarah - Picture Frame — measurements forwarded to Sarah - Mirrored siding — liquid nails — will cover entire panel with glue when the next one falls off - Tapestry Molding for Ceiling — Ion - Transformer Protection Wall — on hold until manpower available - Fire pit — work continues, completion expected AM 7/12 - Cabinet Latches - COMPLETE 5. Grotto - Floor resin white — completed by 7/13 - Genset wiring — wiring complete Danny reviewing auto start from Kite House 6. Berm/Top of Hill - Paint Pergola — COMPLETE - Electrical — Low voltage transformer in place, placement & connection of lights completed ASAP 7. Engineering/Maintenance Yard - Steel Shed Concrete Pad — COMPLETE - Metal Sheets - on old building will be replaced ASAP - Engineering Storage & Shelving — work to start when carpenters available 8. Triangle - - Landscaping direction required from JE 9. Flagpole Pool Cabana - - Furniture — Investigate new desk, new furniture more like Pool Cabana PBI - Relocation of orange sofa to Media Room 10. Floating Dock - Jetski Bumpers — Ordered - ETA 7/24 - Table/Dock Box — Sample handles complete, JE requested larger, will forward new samples by 7/13 -Swim Ladder — - Diving board Option — will forward by 7/13 - Wooden Bumpers — to cover concrete stripping — start 7/12 - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE EFTA01107280 11. Entry Tree Lights — Lights on site, electrical installed ASAP 12. Solutions for Generators — Soundproofing Installation — to be completed 7/13 13. Tiki — Shields 14. Kite House — relocation of outside furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah - JE to review placement of desk from Pool Cabana 16. Chillax Bathroom — storm panels for windows - COMPLETE - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G — sell - will be placed in hurricane storage 7/19 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N - sell 19. Timers — review installing timers on air conditioners, irrigation water systems, and lights 20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 21. Transient Surge Protection — will review and forward estimate ASAP 22. Wind Door — wind door on kitchen side needs openers/wind door stops — COMPLETE 23. Landscaping —Josephine to visit and organize garden 24. Solar lights — Ordered, placed every 30 feet 25. Roads — grade - Jules work continues 26. Library - Lights on bookshelves need attention — will complete ASAP - Temperature - STABLE 27. Main hill — Asphalt path — top and bottom to be completed by JE's direction. Will start 7/19 28. Master Suite - Large master bed planting - COMPLETE - Put self-closing hinges on the master bedroom door to the outside, completed by PM 7/11 29. New Employee Bathrooms 30. Gym - New punching bag — ordered due 71,, 7/16 - Wiring — tidy up due to be completed 17 — Francis bringing balance cables 31. Benches 32. Danny Vicars — schedule boat driving lessons 33. Main Compound — JE needs to confirm that the wireless coverage over the main pool area is adequate 34. Marine/Woodshop Work Area - phone required 35. Beach Office - complete electrical overall required - waterproofing/sealing/painting required 36. LSJ Mooring — requested a copy of approved permit - Darren 36. Hangar EFTA01107281 - Jermaine to redo Internet at hangar - Fuel Containment Pad — draft approved with drainage incorporated, waiting for updated plan EFTA01107282

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Flight #AM7

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.