Skip to main content
Skip to content
Case File
efta-efta01107292DOJ Data Set 9Other

JE Punch List —June 18. 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107292
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —June 18. 2012 1. Clean up - Top of the Desal plant - Engineering - Shed and its Workshops 2. Equipment and Vehicles - Sell equipment - Buy new Kawasaki bikes and mules 3. Computers - Buy new computers 4. Five Palms — TOP PRIORITY - Exterior Door Shutters — removable option - Painting - outside to be completed after visit - Furniture — Sofa — leather samples JE will review while on site - Piano - needs tuner — piano on STT 6/16 - Mirrored siding — Panels on site 6/14 - Glue on site - Tapestry Molding for Ceiling — Ion - Transformer building - Building 5/31, 5/25 - final electrical hookup 6/8 — temporarily powered by generator - Fire pit —gas unit needs to be returned and reordered — Brice has ordered - Cabinets — add push latches on doors 5. Grotto - Floor resin - Genset wiring — scheduling to be determined 6. Berm/Top of Hill - Entry rocks 7. Engineering/Maintenance Yard - Steel Shed — foundation in progress - Metal Sheets - on old building will be replaced week of 6/4 8. Triangle— landscaping direction required from JE 9. Flagpole Pool Cabana - - Recovering of sofa/chairs - Furniture — needs new desk — Sarah 10. Floating dock - Jet ski docking — review - Table/Dock Box — Bill starting 6/4 11. Entry Tree Lights — installation complete 12. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built 13. Tiki — Darren is contacting the vendor regarding the shields 14. Kite House — review of wooden outside furniture - Sarah 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - requires blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G (Fat Cat) - refurbish - Midnight Express — should be in the water 6/21 - Lady K - sell - Big N - sell - Calypso — refurbish EFTA01107292 19. Gym Road,- road grading after Five Palms — continues 20. Timers — review installing timers on air conditioners, irrigation water systems, and lights 21. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 22. Main entrance/gravel/grade - complete 23. Wind Door — wind door on kitchen side needs openers - wind door stops 24. Landscaping —Josephine to visit and organize garden 25. Solar lights - Brice to order 500 landscape lights 26. Roads — grade all roads — Wednesday 6/6 — Tom - please review all roads so you can pitch, drain, with Jules 27. Library — Lights on bookshelves need attention - Temperature? — Atlanta Refrigeration 28. Main hill — Asphalt path — Monique to price 29. Master Suite - Large master bed planting - Put self-closing hinges on the master bedroom door to the outside 30. New Employee Bathrooms 31. Gym, - Add new doors in yoga and ballet room closets - New punching bag - Clean up electronics/stereo 32. Benches 33. Office Pavilion - East window in Sarah's office is rusted outside 34. Danny Vicars — schedule boat driving lessons 35. Hangar - Jermaine to redo internet at hangar - Hangar pad to be built EFTA01107293

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefrigeration
Wire Refrefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.