Skip to main content
Skip to content
Case File
efta-efta01109230DOJ Data Set 9Other

TAYLOR, COTTON & RIDLEY, INC.

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01109230
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
TAYLOR, COTTON & RIDLEY, INC. 1904 BR EN LE AVENUE - ORLAND FL. 32808 PHONE FAX REVISED QUOTATION December 3, 2015 LITTLE ST. JAMES ISLAND ATTN: DANNY VICARS JOB: SPECIAL-LITE DOORS, FRAMES & HARDWARE THANK YOU FOR THE OPPORTUNITY TO QUOTE THIS PROJECT 2- PAIR 3-0 X 8-0 X 1-3/4 FLUSH SL-17 FRP DOORS WITH 1-3/4 X 5" TUBE FRAME PREPPED FOR HINGES, LOCDK AND FLUSHBOLTS. 3- PAIR 4-0 X 8-0 X 1-3/4 FLUSH SL-17 FRP DOORS WITH 1-3/4 X 5" TUBE FRAME PREPPED FOR HINGES, LOCK AND FLUSHBOLTS. 4- 3-0 X 8-0 X 1-3/4 SL-17 FLUSH FRP DOORS WITH 1-3/4 X 5" TUBE FRAMES PREPPED FOR HINGE AND LOCK. 56- BB 4 1/2 X 4 1/2 NRP HINGES US23D. 9 - SCHLAGE AL53PD X SAT LEVER KEYLOCKS 626. 5 - ROCKWOOD 555 X 24" FLUSHBOLTS 626. 14- LCN 4040XP CLOSERS ALUM. 4 - NGP THRESHOLD 896V X 36" ALUM. 2 - NGP THRESHOLD 896V X 72" ALUM. 3 - NGP THRESHOLD 896V X 84" ALUM. FURNISHED ONLY - FREIGHT TO PORT IN MIAMI INCLUDED (DOORS SHIPPED DIRECT TO PORT) EXCLUSIOINS: INSTALLATION, KEYING, LABOR TO RECEIVE MATERIAL, EXTRA PROTECTION OF DOORS (OTHER THAN MANUFACTURE'S PACKAGING) PRICE: 35,597.00 TAX 6% 2,135.82 TAX 1% 50.00 TOTAL $ 37,782.82 TERMS: PREPAYMENT REQUIRED PLEASE ALLOW 6 - 8 WEEKS FOR DELIVERY THIS QUOTATION IS GOOD FOR 30 DAYS SUBJECT TO MANUFACTURE'S LEAD TIMES QUOTED BY: APPROVED BY: Pete Davila # EFTA01109230

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.