Case File
efta-efta01109772DOJ Data Set 9OtherNew Engineering Building Pad
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01109772
Pages
2
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
New Engineering Building Pad
Temp Enclosure/safety
Material Handling
Material
Outside Vendor
Labor
Shipping
Trucking
Equipment Rental
$1,500.00
Misc Expenses
$1,000.00
Layout/Survey
Earthwork and Demo
$1,300.00
$2,000.00
Site Drawings
Pest Control
Site Dranage
$1,000.00
Pipes/Utilities
$500.00
Concrete
$9,950.00
$500.00
$8,500.00
$2,500.00
Vapor Barrier
$200.00
Ties/Accessories/bolts
$1,500.00
Rebar
$1,400.00
Saw Cutting
$250.00
Curing/Protection
$300.00
Fine Grade
$1,000.00
Wood/Formwork
$1,200.00
$4,500.00
Fastners
$400.00
Sub Totals
$18,700.00
$3,300.00
$13,000.00
$4,500.00
Total
$39,500.00
Note: Labor # is for outside labor only/ finish concrete crew
Note: Rebar is for additional rebar
Note; This is a basic pad
No Utilities, septic sysyem, electrical, wall, or engineering yard work
The pad will have 3 gray water drains. The pad will not have sanitary drains
Includes min work on electrical vault
EFTA01109772
Tax
EFTA01109773
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.