Permit #230-09
LSJ Project #1004
LSJ Project Name -Master Bedroom
I) LSJ Personnel re imtnary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No.
230-09
FAX
BUILDING PERMIT
DM0
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OP PlinhisTS
mina F KING TIOMINM BUII DING AM I WON
CHAIII Or IF. AMNLIL, SI mow
, . v
PERMISSION IS HEREBY GRANTED TO
Jetirey gpnleln
TO (Consfluct INNA.AIC I
Renovnt Jon 6 Add It Ion
Description of structure:
8" Bike w/ Stone Minich
Location:
Mitt le St. /ruses;
Approximate cost of woo*: S
191,1)3.90
Person(s) In chaise of work:
Undecided
,:uno I
REMARKS: Contraction shell be done In accorsionee pith TIM. 29, action 292 oL the V.L.
Building Code
FEE: $
423-00
teen
kit
41- Olt era. Torritorla; Director
CommIssionoi el Planning and NaNtal Resoucces
EFTA01114006
LSJ Permit #265-10
1)
LSl Project # 1006
LSJ Project Name - Laundry
LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. De-811:0281.1.0.--
Date.0(230114_____.
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45M
a Treacrucksted. SI CMIX 00840
TN
Fox
Cynl
T. SI I ma 00802
Tel
Fax
PERMISSION IS HEREBY GRANTED TO: • LSJ. LLC
TO (Construct, Repair, etc.):Stclicn Renpvatioriandla8ndry Acklbon _
Description of structure:_AAPer APPreYed_PJACit_
Location: LIMO St. JaM0STRFIISS
Approximate cost of work: $187480.08
Person(*) In charge of work: TBD
REMARKS:.AS_Efm-LK1009 LVISzlelills29 Comalmace
FEE:$0,00
usnits. war S09
4.0.44 Pin.g a
la la, COO
EFTA01114007
Permit #265-10
1.51 Project # 1007
LSJ Project Name -Kitchen
I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. a
Date
.
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DWISION Of PERMITS
FS
Cy
SI
Felt
kract
Tot
Fax ISM
PERMISSION IS HEREBY GRANTED TO: • I Ski.
TO (Construct, Repair, etc.):_StagagaRegfatalmrtand_LagndetAgglign
Description of structure:_As POI Aooroyee_Oana
Location:, _LAM St. Jenhal*nd
Approximate cost of work:, StEty.010,00
Person(s) in charge of work: TOO
REMARKS:. Aereffie_209nil Colle_TOtaCDMPlinaCe
EFTA01114008
Permit # 117-11 LSJ #Project -1011
Main House (Cabana)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
•
AMU_
Date
08/26/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 MwthatsfAils4 . emetriiii040
CYl
t
at:
Tel:
Fax:
Tel:
Fax:
PERMISSION IS HEREBY GRANTED TO: LA fit:
TO (Construct, repair, *Icy Addition-Cabonna
Description of structure: As Per APPrered Plans
Location: Ma "C" Little St James
Approximate cost of work. 123,06400
Person(s) In charge of work: TBD
REMARKS: As per *MC 2009 and VI Code 71de 29, Ch. 5 Code Compliance: * * Asper amendment
in Ad 7075, petrol! for the installwion of solar thermal vstest is not repaired
FEE: S 34&40
tormilerrorind MM.. Resou s
EFTA01114009
Permit #CN 1049
I LSJ Project 1013 I LSJ Project Name - Flagpole Pool
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Ins ction Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No. _Ott 1049_
Date
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
OMSION Of PERMITS
AMed
FIK
Ttrl.
PERMISSION IS HEREBY GRANTED TO' L SA II C
TO (Construct, Repair, etc.): C0IMMtrool wi Cabana, Desk A Lauprotallo
%
om
Description of structure:J
prots
Location: PendaSL_Jarno 'Vann
Approximate coat of work: $383 300.00
Penton(*) in charge of work:_jj.
REMARKS; As PM IRC 2009 lug Vl Coggirgga2.ramsteanDis
FEE: $0.00
Fab. 7. 2011
kaFeniri:VilonnlatlIkIns• Pel4to
cern/4,Am./
et-7
CORY
to- 743 -
EFTA01114010
TO (ccoastfacl. ru..HIt. 414):
Deseriplion of structure
Permit #018-12 I LSJ Project #1014
I)
LSJ Project Name - Dock Shelters
LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No.
018-12 .
Date
10/1112011
BUILDING PERMIT
GOVERNMENT
OF "EDF. VIRGIN
ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION Or PITRhiliTS
Cyril IL Klny AI int el. Thomas 00402
Tel,
Pau:
PERMISSION IS HEREBY GRANTED TO•
LSJ. 1-LO
remillare New Shag,
.4y per ApprOved Male,
Panne/ No. C thnir SI. Amu,
Location:
Approximate cost of work*
148,921.00
Persoo(a) In charge or wont:
Too
REMARKS: Asper /RC 2009 and VI Code fl u.. .29 if 9..3
ode
p0esneo
per eilmenc00.18/ to ACI
7073. permit for the InvI04000•0 vo, Natter Merin:et a rvig44 lx 4•4 regitire4/.
FEE: S. "5."
EFTA01114011
Permit #011-12 I LSJ Project #1015 1 LSJ Project Name - Five Palms
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pm-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KM1 Inspection Group
Office:
Cell:
Fax:
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
011-12
Date 10/13/2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill FrederIcksted St. Croix 00840
Tel:
Fax:
PERMISSION IS HEREBY GRANTED TO:
i n LIC
TO (Construct, repair, etc):
Cyril E. Kin Airport, St. Thomas 00802
Tel:
Fax:
Addition-Music Room
Description of structure.
As Per Plans Submitted
Location.
Little St James
Approximate cost of work:
71,00.00
Person(s) in charge of work: Tal)
REMARKS: As per IRC 2009 and VI Code Title 29, Ch. 5 Code Compliance: *RAs per Amendment to
Act 7075, permit for the installation of solar thermal system is not required.
2
FEE: $
246.75
ConantationaPlanning and Natural Resources
EFTA01114012
Permit # 133-08 LS1 Project #1002 LS1 Project Name - Mechanical Building (Shell)
1) LSJ Personnel Preliminary waikthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
MA 02035
Foxborou
Tel.
Fax
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
Office:
Cell:
Fax:
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
7) Final inspection — DPNR
C'F/r)
FAX
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
—
o —
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
INVISION OP PERMITS
CURL E 10/0 TERMINAL BUILDING. 20zi FLOOR
cmAFILOTTO MIME. SI 1040mAs. VI 00002
TEL
PERMISSION IS HEREBY GRANTED TO
LSI, LI.0
TO (Computt IN.v.Ma
Construct Mechanical Building
DosCliplIOn of SWOCIUM:
Rein!. Conc.
Locariew
Approximate cost of work: $
Person(s) In charge of work:
•
iLittle St. James
*2.000,000
Lafayette Contractors, LLC
REMARKS:
Construction shall be done In accurdance with Ti
Building Code
FEE: E 20.00 ._
fieZr- 53-04
//-7-e9
Date Dec.
— 20. 2007
lion 292 of the V.1.
Territorial Director
Com miexNnw et Mein° and wear Reeewern
EFTA01114013
Permit #375-08
LSJ Project # 1010
LSJ Project Name - Mechanical Desal (Outfit)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
Foxborough, MA 02035
Tel.
Fax
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KM1 Inspection Group
Office:
Cell:
Fax:
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/I,SJ
7) Final inspection — DPNR
per:At
to.
375-06
: A)
BUILDING PERMIT
Rale
GOVEItNiVIENT OF Tilt: VIRGIN ISLANDS
— 0
DEPARTMENT OF MANNINO AND NATURAL RESOURCES
OrreliONOIOCIOSTO
WO. k
TrADOIAl 00•01%0 m
IN*
■
CiOALOtle matt it 214CIIVO V. /OW
PERMISSION IS HERESY ORANICO TO
ki rk
TO iZtetwi.000, v. I
Desalpien of situcluic
InntuIlitIon
el PROINUrnI EinIffent,
tocafion
ApproXIMAW C0 ,10i wort I
POISOO(S) in clues* el nett
LaIsyncte Coscrutors
nett.", shall be J-'nasIa ACCO -
La( iiint
ME: s
,7a•:2
C74 1 i ccenur ' 0' Czr- 63.-OIL
//- 7 -07
rrrrr t011ii Ulnae.
oirliwalo0;dt-40•21.4ii;;;;;•—•
EFTA01114014
Certificate of Occupancy
Pre-Inspection Check List
Health & Safety
_Egrees (exits)
_Pest Control
Grounds
_Garbage & Debris
_Grading & Drainage
_Walkways & Driveways
Exterior
_Foundation Walls
_Exterior Walls
_Roof & Rood Drainage
Windows & Doors
Interior
_Stairs, Handrails, Guardrails
_Interior Surfaces
Plumbing
Fixtures
_Water System
_Water Heater
_Sanitary Drainage
Mechanical
_A/C system
Electrical
_Ground Fault Circuit Interrupter(s)
Fire Safety
_Fire Extinguisher
_Smoke Detector
Egress -a safe, continuous and unobstructed means of egress shall be provided from the interior
Structure
Pest Control - Structures shall be generally free from wood destroying insects and rodent infestation
Sanitation —Grounds and structures shall be maintained in a clean, safe, and sanitary condition
Grading & Drainage - All premises shall be sufficiently graded and sloped in a approved manner to
prevent the erosion of soil and water accumulation around immediate perimeter of any structure
Walkways & Driveways — Free from potentially hazardous conditions or major defects.
Foundation Walls & Exterior walls— shall be free major defects, deterioration, or open cracks.
Roof - be sound, tight and not have defects that admit rain. Rood Drainage components should be
adequate to drain collected roof run-off.
Window and Doors - Frames and hardware should be in sound condition
Stairs, Handrails & Guardrails - should be in good repair and firmly fastened to support normal loads
Fixtures— free from obstructions, leak, major defects, and performing intended purpose.
Water Systems — Kitchen sinks, lavatories, laundry Facilities, bathtubs and showers should be supplied
with hot and cold running water with adequate volume and water supply to ensure fixtures to function
properly
EFTA01114015
Water Heater — Temperature not less than 110 degrees.
Sanitary Drainage — Plumbing fixtures should be properly connected to an approved disposal system,
free from obstructions, leaks and major defects
Air condition system — Ensure system is functioning properly
Electrical - Ensure system is functioning properly. Look for potential hazards, insufficient outlets
Ground Fault Interrupter— Ensure GFI are installed at potentially wet areas or where water can splash
Fire Safety - Egress, fire extinguisher , single station smoke detector, shall comply with the Uniform Fire
Code
EFTA01114016
Related Documents (6)
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
1p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
1p
DOJ Data Set 9OtherUnknown
From: Danny Vicars
1p
DOJ Data Set 10OtherUnknown
EFTA01952413
1p
DOJ Data Set 11OtherUnknown
EFTA02575269
1p
DOJ Data Set 11OtherUnknown
EFTA02488375
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.