Case File
efta-efta01117745DOJ Data Set 9OtherGulfstreant
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01117745
Pages
5
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Gulfstreant
INVOICE
DYNAMIC• COMPANY
Bldg C.-FAX 561-681-9392 - West Palm Beach. Florida 33406
Part/Model #: GIV
AC Serial No/Tail No.: 1085 / N423TT
Mail Remittance To:
Gulfstream Aerospace Corporation
P.O. Box 730349
Dallas, Texas 75373-0349
Overnight Remittance To:
Gulfstream Aerospace Corporation (Box # 730349)
do JP Morgan Chase Bank. NA
ATM: Dallas National Wholesale Lockbox TX1-0029
14800 Frye Road
Ft. Worth, TX 76155
Wire Remittance To:
Gulfstream Aerospace Corporation
JP Morgan Chase Bank. NA
Chicago. ILA,
Account No
Fedwire Routing No. (ABA
S.W.I.F.T. CHASUS33
ACH Credit Routing No. (ABA:
Bill To: TRT LEASING
505 S FLAGLER DRIVE, #700
WEST PALM BEACH, Florida 33414
United States
Tide: TRT LEASING
Invoice Number.
Invoice Date:
Customer ID:
P.O. Number:
Repair Station:
In Date:
Out Date:
Payment Type:
Payment Terms:
7113002096
6/24/2013
BT113
FAA CRS PB8R624N
05/13/2013
06/17/2013
Net 30-Open terms
INVOICE SUMMARY FOR WORK ORDER NUMBER: SCB300
Time & Materials
Flat Rate
Total
Labor USD:
$4.435.55
50.00
$4.435.55
Services USD:
525.548.94
50.00
$25.548.94
Detail Subtotal USD:
$29.984.49
$0.00
$29,984.49
Subtotal USD:
$29.984.49
Funds on Deposit USD:
$0.00
Total USD:
361,252.00 4/26
400,000.00 6/10
331,474.30 6/14
$29,984.49
For detail description of the work complied with see the Work Order Detail report.
GAC_WorkOrderinvoice.rpi Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). Printed: 7/2/2013 2:58:47PM
Page 1 of 5
Ref AN
EFTA01117745
Bill To: TRT LEASING
WO #: SC13300
Invoice Number: 7113002096
Item: 6
Avionics
Team Manager: Sean Brown
Customer Coordinator: Ray Kraber
Part/Model #: WV
AC Serial NolTail No.: 1085 / N423TT
TSN/TSO:
CSN/CSO:
Aircraft Time: 8573.4 / 3968
Discrepancy: 6.1
Resolution
Squawk from flight test - Standby fuel gauge totalizer is indicateing 2001bs lower than the LT and RT fuel gauges
and there is a 1501bs difference between total fuel on EICAS primary and systems page compared to STBY
totalizer gauge - EICAS and SYSTEMs page ind same
Ref. SC13175 6.7
Removed Standby Fuel Qty indicator P/N 1159SCP460-101 S/N 520 for repair. All work accomplished IAW GIV AMM
28.06.00.
Installed a REPAIRED Dual Standby Fuel Quantity Indicator PN.: 1159SCP460-101, SN.: 520 obtained from Parker
Hannifin Corp., Hauppauge, NY, FAA App./Cert.# FX1R 156K. Complied with Sections B and C of Gulfstream GIV
CHIP 284042 Fuel Quantity Dual Standby Indicator - Removal / Installation. Additionally complied with Gulfstream
GIV CMP 284029 Fuel Low Level Warning System - Operational Test and CMP 284044 Fuel Quantity Indication
System - Operational Check. System Ops. Checks Good. Work done IAW Gulfstream GIV AMM Chs. 28.06.00 and
28-07-00.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
4.88
@
$115.00
$561.20
Services USD:
Time and Material
$1,333.33
Total USD:
$1,894.53
Services:
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
6.1 #1
REPAIR
1.00
$1,333.33
$1,333.33
Part Ref: 1159SCP460-101 INDICATOR, FUEL QUANTITY (GREY)
Step: 6.1.1
Step: 6.1.2
Completed
Removed Standby Fuel Qty indicator P/N 1159SCP460-101 S/N 520 for repair. All
work accomplished IAW GIV AMM 28-06-00.
Completed Installed a REPAIRED Dual Standby Fuel Quantity Indicator PN.: 1159SCP460-101,
SN.: 520 obtained from Parker Hannifin Corp., Hauppauge, NY, FAA App./Cert.#
FXIR 156K. Complied with Sections B and C of Gulfstream GIV CMP 284042 Fuel
Quantity Dual Standby Indicator - Removal / Installation. Additionally complied with
Gulfstream GIV CMP 284029 Fuel Low Level Warning System - Operational Test and
CMP 284044 Fuel Quantity Indication System - Operational Check. System Ops.
Checks Good. Work done IAW Gulfstream GIV AMM Chs. 28-06-00 and 28-07-00.
Discrepancy: 6.2
Squawk from flight test - LED light burned out on Rate of Climb / FPM (3 digit from LT) on pressurization
controller
ref. SC13175 6.8
Resolution: Removed Cabin Press/Rate Of Climb Indicator P/N Pressurization indicator P/N 1159SCF407-7 S/N 168DB was
removed and sent out for repair. Reinstalled repaired cabin pressure ind assy P/N 1159SCF407-7 S/N 168DB. Complied
with Pressure Indicator - Operational Test. System Ops. Checks Good. All work performed IAW Gulfstream GIV AMM
Chapter 21.02.00 and 21.00.00.
Reference item SC13300.8.4 for Pressurization Ground Delta P Functional check.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
13.11
@
$115.00
$1,507.65
For detail description of the work complied with see the Work Order Detail report.
GAC_WorkOrderinvoice.rpi Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). Printed: 7/22013 2:58:47PM
Page 2 of 5
Ref AN
EFTA01117746
Bill To: TRT LEASING
Services USD:
Total USD:
Services:
Time and Material
WO #: SC13300
Invoice Number: 71/3002096
$2,641.10
$4,148.75
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
6.2 #1
Vendor Supplied Labor
1.00
$1,758.75
$1,758.75
Part Ref: 1159SCF407-7 INDICATOR, PRESSURIZATION, CABIN
6.2 #2
Vendor Supplied Labor
1.00
$882.35
$88235
Step: 6.2.1
Step: 6.2.2
Step: 6.2.3
Completed
Completed
Completed
Removed, wrapped. and tagged upholstered overhead panel from flight deck. Removed
Center Overhead Panel immediately aft of Overhead Instrument panel. Removed
circuit breaker panel overlays ( 1./R ) temporarily to gain access to Overhead
Instrument Panel attaching screws. Removed screws and dropped Overhead
Instrument Panel. Removed Cabin Press/Rate Of Climb Indicator P/N 1159SCF407-7
S/N 168DB to be sent out for repair. Temporarily re-installed Overhead Instrument
Panel and I./R circuit breaker panel overlays to facilitate the access of power to the
aircraft. All work performed IAW Gulfstream GIV AMM Chapter 21.00.00.
Reinstalled repaired cabin pressure ind asst' P/N 1159SCF407-7 SIN 168DB. Awaiting
ops check. All work done JAW GIV MM AMM Chapter 21.00.00.
'ASV Gulfstream
CMP 213022 Cabin Pressure Indicator - Removal / Installation
item B. (6); performed Cabin Pressure Indicator - Operational Test. System Ops.
Checks Good. Work done IAN' Gulfstream GIV AMM Ch. 21-02-00.
NOTE: A/C stills needs Gulfstream GIV CMP 213086 Pressurization Ground Delta P -
Functional Check when A/C is outside and APU running.
Discrepancy: 6.3
Squawk from flight test - With both engines and APU running and both converters on DC volts on the
Right-Left-AUX or ESS selected indicate 47.8VDC
Resolution: C/W CMP 245060 from steps A. to steps B.(6). Removed EPMP P/N 1159SCAV373-1007 S/N N1069 for service. Work
performed IAW GAC GIV MM 24.03.02. Installed repaired EPMP PN: 1159SCAV337-1007 SN: N1069. Installed
overlay next to EPMP. Complied with CMP 245061 EPMP operational check All work done IAW GIV AMM 24-03-02.
Billing Method
Flours
Rate
Total
Labor USD:
Time and Material
ST
11.58
@
$115.00
$1,331.70
Services USD:
Time and Material
$9,552.22
Total USD:
$10,883.92
Services:
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
63 #1
REPAIR
1.00
$9,552.22
$9,552.22
Part Ref: I159SCAV373-1007 PANEL, ELECTRIC POWER MGMT - IB118-2 / IB118-2-D (EPMP)
Step: 6.3.1
Completed
Step: 6.3.2
C/W CMP 245060 from steps A. to steps B.(6). Removed EPMP P/N
I159SCAV373-1007 S/N N1069 for service. Work performed lAW GAC GIV MM
24-03-02.
Completed
Installed repaired EPMP PN: I159SCAV337-1007 SN: N1069. Installed overlay next to
EPMP. Awaiting ops check. All work done lAW GIV AMM 24-03-02.
Discrepancy: 6.4
Squawk from flight test - On RNAV approach VNAV worked and then became unavailable on approach
Ref. SC 13175 6.12
Also crew states Predictive Raim fail
For detail description of the work complied with see the Work Order Detail report.
GAC_WorkOrderinvoice.rpi Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). Printed: 7/2/2013 2:58:47PM
Page 3 of 5
Ref AN
EFTA01117747
Bill To: TRT LEASING
WO #: SC13300
Invoice Number: 7113002096
Resolution: Removed defective #2 VHF Nay Receiver P/N 622-7194-201, S/N 3647 to be sent out for repair. Installed modified #2
VHF Nay Receiver P/N 622-7194-201, S/N 3647. Op ck good. Work done IAW GIV MM 34-02-02, with no defects
noted. Updated CMP 345006
NOTE predictive RAIM fail is addressed in item 6.10
Billing Method
Flours
Rate
Total
Labor USD:
Time and Material
ST
3.75
@
$115.00
$431.25
Services USD:
Time and Material
$2,732.96
Total USD:
$3,164.21
Services:
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
6A #1
Vendor Supplied Labor
1.00
$2,732.96
$2,732.96
Part Ref: 622-7194-201 RECEIVER, NAVIGATION, VIR-432
Step: 6.4.1
Step: 6.4.2
Completed
Removed suspected bad #2 VHF Nay Receiver P/N 622-7194-201, SIN 3647 to be sent
out for repair 3-15-13. All work performed IAN' Gulfstream GIV AMM Chapter
34-03-00.
Completed Installed modified #2 VHF Nav Receiver P/N 622-7194-201, SIN 3647. Op ck good.
Work done IAW GIV MM 34-02-02, with no defects noted.
Discrepancy: 6.5
Squawk from flight test - Standby engine instrument gauge is indicating all "8888"s on RT HP gauge
Resolution: Removed Standby Engine Indicator P/N 1159SCF412-11 S/N 9904598BA for repair. All work accomplished IAW GIV
AMM 77-14-00.
Installed an OVERHAULED Standby Engine Instruments Indicator PN.: 1159SCF412-11, SN.: 9904598BA obtained
from Aero-Mach Labs, Inc., Wichita, KS, FAA App./Cert.# NU2R 044L. Complied with Gulfstream GIV CMP 770009
Standby Engine Instruments Indicator - Removal / Installation Sections "C" and "D". Additionally complied with
Gulfstream GIV CMP 770001 Standby Engine Instruments - Operational Test. System Ops. Checks Good. Work done
JAW Gulfstream GIV AMM Ch. 77-14-00.
Billing Method
Flours
Rate
Total
Labor USD:
Time and Material
ST
4.25
@
$115.00
$488.75
Services USD:
Time and Material
$5,449.33
Total USD:
$5,938.08
Services:
Ref. No.
Description
Quantit •
Sell Price USD
Extended USD
6.5 #1
REPAIR
1.00
$5,449.33
$5,449.33
Part Ref: 1159SCF412-11 INDICATOR, STANDBY ENGINE
Step: 6.5.1
Step: 6.5.2
Completed
Removed Standby Engine Indicator P/N 1159SCF412-II S/N 9904598BA for repair. All
work accomplished IAN' GIV AMM 77-14-00.
Completed Installed an OVERHAULED Standby Engine Instruments Indicator PN.:
I159SCF412-11, SN.: 9904598BA obtained from Aero-Mach Labs, Inc., Wichita, KS,
FAA AppiCert.# NU2R 044L. Complied with Gulfstream GIV CMP 770009 Standby
Engine Instruments Indicator - Removal / Installation Sections "C" and "D".
Additionally complied with Gulfstream GIV CMP 770001 Standby Engine Instruments
- Operational Test. System Ops. Checks Good. Work done IAW Gulfstream GIV AMM
Ch. 77-14-00.
Discrepancy: 6.7
Radome has delamination and moisture.
Resolution: Repaired/Modified Radome Assembly P/N 1159B21040-87K as per B/P SE05204902-1,. CE443356002. Rev-. 03 Radome
Mod, Engineer Dispos 1.2.2 and 1.4.1. Work order RC329452/I.1
For detail description of the work complied with see the Work Order Detail report.
GAC_WorkOrderinvoice.rpi Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). Printed: 7/22013 2:58:47PM
Page 4 of 5
Ref AN
EFTA01117748
Bill To: TRT LEASING
WO #: SC13300
Invoice Number: 71/3002096
Services USD:
Total USD:
Services:
Billing Method
Hours
Rate
Total
Time and Material
$3,840.09
$3,840.00
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
6.7 #1
Vendor Supplied Labor
Pan Ref: 1159B210400-51K GIV Radome
1.00
$3,840.00
$3,840.00
Discrepancy: 6.10
Crew states Predictive Reim fail
Resolution: Could not duplicate discrepancy. After GPSs had acquired satellites, I entered info in to FMSsfor each of the GPSs to
display RAIN! for at least 3 different locations and different times. Predictive RAIM was computed every time. Both
GPSs op ck good. Work done IAW GIV MM 34-52-00.
Billing Method
Flours
Rate
Labor USD:
Time and Material
ST
1.00
@
$115.00
Total
$115.00
Total USD:
$115.00
Item: 8
Mechanical
Team Manager: Sean Brown
Customer Coordinator: Ray Kraber
Part/Model #: GIV
AC Serial No/Tail No.: 1085 / N423.17
TSN/TSO:
CSN/CSO:
Aircraft Time: 8573.4 / 3968
Discrepancy: 8.4
CMP GIV 213086 Pressure Ground Delta P-Function Test, reference item SC13300.6.2
Resolution: COMPLIED WITH CMP GIV 213086 Pressure Ground Delta P-Function Test. No defects noted. Work done I.A.W.
GIV M.M. chap. 21.02.00.
Communications concerning disputed debts, including a check or other instrument
tendered as full satisfaction of a debt, must be forwarded to:
Gulfstream Aerospace
Attn. Credit Manager
PO Box 2206
M/S B-05
Savannah, GA 31402
For detail description of the work complied with see the Work Order Detail report.
GAC_WorkOrderinvoice.rpt Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). Printed: 7122013 2:58:47PM
Page 5 of 5
Ref AN
EFTA01117749
Technical Artifacts (24)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Fax
FAX 561-681-9392Flight #
IB118Phone
3002096Phone
3356002Phone
337-1007Phone
373-0349Phone
373-1007Phone
5204902Phone
561-681-9392Phone
622-7194Phone
7113002096Phone
7122013SWIFT/BIC
CHASUS33Tail #
N1069Tail #
N423Tail #
N423TTWire Ref
Ref: 1159B210400Wire Ref
Ref: 1159SCF407Wire Ref
Ref: 1159SCF412Wire Ref
Ref: 1159SCP460Wire Ref
Ref: I159SCAV373Wire Ref
ReferenceWire Ref
Wire RemittanceWire Ref
referenceForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.