Budget Adjustment
13 October 2010
Code
Description
01-610 Matenal Handling
01-665 Equipment Operation
Red—tel -it&
a-GC ft- 7A
Budget
Adjustment
Revised
$9,000 00
3! 500 0::
$1,500 00
56.600.00
iz 1 IX: 14.
51,500.00
02-000 Testing
$15.000 00
57.500 00
02.005 Layout I Survey
SO 00
52.500 00
52.530 00
02-071 Disposai
55.600.00
$0 00
02-200 Excavation : Backfil;
$21.000.00
Cn, )f.
516.000.00
03-210 Reber
$800 00
5400.00
51.200 00
03-303 Grouting - CMU
51,450.00
52.100 00
53.550 00
03-35t Cistern Coating
510.000.00
57 r. :‘r•
52.500 00
04.450 Native Stone Veneer
5141.000.00
0:
S106.000.00
06.200 Finish Carpentry -
55.000 00
55.000 00
$10 000 00
06.201 Finish Carpentry - M
53 500 00
512.50C 00
$16.000.00
08-213 Ext. Wood Doors i Frames
58.000 00
58.166 00
516.166 CO
09.200 Plaster
S8.000 00
515.000 00
523.000 00
09.341 Marble Ceilings - Material
$70.000.00
530.000 00
5100.000 00
09.550 Wood Flooring
$14 600.00
$5.000 00
$19 600.00
09.600 Floor Tile Patch - Repair
59.350 00
-S5 "./247
54.350.00
09-602 Cora! Stone Flooring - Mat
52.158.00
$7 500.00
59.658 00
09.604 Terrace Stone Flooring - M
53.466 00
r33 U33
$0.00
10-801 Toilet Accessories - L
$480.00
52 000.00
52.480 00
12.310
Granite Countertops
S13 500.00
4
$0 00
12.311 Reuse Existing Vanities
$240 00
55 TOO 20
S5 240 00
5348.744.00
$0 .00
5348.744.00
Increase in Bildget
$0.00
Approved: id 1-14-1.,/
04- Atf 4441—
EFTA01118356
Mechanical Building #1002
Budget Adjustment
03 January 2011
Code
Description
Budget
Adjustment
Revised
02-000
Testing
$34.771.00
$8,000.00
$42,771.00
02-200
Earthwork
$78,678.00
($8.000.00)
$70,678.00
07-110
Membrane Waterproofing
$9,080.00
$1,500.00
$10,580.00
07-270
Fire Stopping
$6,000.00
($1.500.00)
$4,500.00
$128,529.00
$0.00
$128,529.00
Increase i Budget
$0.00
Approve
11)1
I I
__c-A tla
4,0,6
L.A%
Ai zarA,—
;4- tAfral
0_01-nua__
EFTA01118357
2:14 pm
LSJ, LLC
Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
01/10/11
Service
Office Pavillon
01 General Requirements
Est. Cost
Act. Cost
(S) Dill.
01-100 - Holiday Allocation
0.00
82.594.15
62594.15
01-101 - Burden
0.00
48.56192
48.56192
01-514 • Temp Phones
4,200.00
3,598.00
-802.00
01-516 - Temporary Toilet
0.00
0.00
0.00
01.517 • First Aid Supplies
0.00
0.00
0.00
01.518 -Temporary Fire Protect
0.00
0.00
0.00
01-522 - Temporary Enclosures
3,000.00
2,664.00
436.00
01.562 - Dust Control L
0.00
0.00
0.00
01-562 - Dust Control M
0.00
0.00
0.00
01-590 • Field Office Supplies
1,200.00
634.23
-565.77
01-610 - Material Handling
19,960.00
8,344.50
-11.615.50
01.621 - Temporary Protect
6.000 00
5,748.66
•251.34
01-624 - Construction Cleaning
10,400.00
8.557.20
.1.842.80
01.625 - Final Cleaning
1,850.00
0.00
-1,850.00
01-628 - Safety
157.19
157.19
0.00
01.640 • Personnel Transport
0.00
0.00
0.00
01-641 - Container
25,000.00
21,323.09
-3.676.92
01.645 • Expendables
18,000.00
8,105.73
.1894.27
01-665 - Equipment Operation
11,750.00
3,283.35
-8.466.65
01.712 - Super. Transport
0.00
0.00
0.00
01-712 - Superintendent
0.00
0.00
0.00
01-714 - Clerk
0.00
0.00
0.00
01.715 - Time Keeper
0.00
0.00
0.00
01-603 - Photographs
900.00
0.00
-900.00
01450 - Plans Reproduction
5.000.00
90.00
-4.910.00
01-900 - General Office Require
20,000.00
10,104.31
-9,895.69
Total 01 General Requirements
127,417 19
181788.32
58.351.13
02 Sitework
02-000 - Testing
50.000.00
48,700.73
-1.299.27
02-005 - Survey
15,000.00
8,900.83
-8,099.17
02-120 - Erosion Control L
3,200.00
1,918.00
-1,282.00
02-121 - Erosion Control M
5,100.00
759.44
-4,340.56
02-160 - Rock Anchors
47,916.76
47.916.76
0.00
02-200 • Earthwork
37.000.00
29.696.05
-7,303.95
02-211 - Rock Removal
71287.16
73,287.16
0.00
02-281 - Pest Control
1550.00
8,550.00
0.00
02-713 - Pot. Water UG Piping
2.000.00
316.50
-1,683.50
02-740 - Waste Disposal Systems
3,100.00
1,284.04
-1.815.96
Total 02 Sllework
245,153.92
219329.51
45,824.41
03 Concrete
03-120 - Complete Sub
422,266.03
422.266.03
0.00
03-121 - Standish
23,11150
23,116.50
0.00
03-130 - 4000N Concrete
95.366.03
96.71055
1,344.52
inin - Site Concrete
8.000.00
3,990.15
-4.009.85
03-362 - Pumping
8,570.00
8.570.00
0.00
03-400 - Pre-Cast Concrete
1,000.00
200.24
-799.78
Total 03 Concrete
558,318.56
554.853.47
-3.465.09
04 Masonry
04425 - EIFS
100,000.00
89,123.94
-10,876.08
04-450 - Native Stone Veneer
40,000.00
33,779.52
-6.220.48
04451 • Stephen Auguste
280.00000
218032.07
-60,967.93
Total 04 Masonry
420,000.00
341.93553
-78.064.47
05 Metals
05-120 - Structural Steel
143.000.00
142,903.54
-96.46
05.120 - Structural Steel (S&C)
0.00
0.00
0.00
05-380 - Steel Erection
58,500.00
57,355.88
-1.144.12
Total 05 Metals
201,500.00
200,259.42
-1,240.58
Page 1
EFTA01118358
2:14 PM
LSJ, LLC
mom
Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
06 Wood
Est Cost
Act. Cost
(S) Dill.
06-050 • Fasteners Material
4.500.00
4.172,01
-327.99
06-100 - Rough Carpentry L
36,000.00
27,438.30
4,561.70
06-101 - Rough Carpentry M
30,000.00
23,620.80
-6,379.20
06.400- Sarah's Woodwork. Kitc
35,000.00
32.112.08
-2,887.92
Total 06 Wood
105,500.00
87,343.19
-18,156.81
07 Moisture/Thermal
07-110 - Membrane Water Proof
1.736.53
1,736.53
0.00
07-160 - Bituminous Damp Proof.
1,327.24
1,327.24
0.00
07-170 - Protection Board
1,943.50
1,943.50
0.00
07-212 - Rigid Insulation L
3,200.00
3.074.20
-125.80
07-213 - Rigid Insulation M
11,520.00
11.35765
-162.95
07-325 - Concrete Roof Tiles L
9,661.20
9,661.20
0.00
07-326 - Concrete Roof Tiles M
41,227.78
40,903.78
-324.00
07423 - Copper Flashing L
601.00
600.30
-0.70
07424 • Copper Flashing M
23.396.96
16.926.96
4.470.00
07-632 - Downspout RoughlL&M
4,153.35
4,15335
0.00
07-800 • Bluestone Services
26,334.00
28,334.00
0.00
07-900 • Joint Sealant-L&M
3.000.00
2263.44
-73656
Total 07 Moisture/Thermal
128,101.56
1208145
-7,820.01
08 Doors and Windows
08-210 - Doors & Frames Labor
1,80000
4,405.99
2.605 99
08-210 - Exterior Door & Frame
0.00
0.00
0.00
08-211 - Int. Doors & Frame (S&
0.00
0.00
0.00
08-211 • Interior Door & Frame
0.00
0.00
0.00
08-212 - UtiIlity Door&Frame M
2,840.00
1,320.22
-1.519.78
08-250 • Hartman Windows & Door
111,476.00
111,327.80
-148.20
08.350 - Access Doors
1,000.00
753.91
-246.09
08410 - Wood Windows L
12,000.00
11,534.51
-465.49
08411 - Type B Window Storm Sh
1,210.00
1,210.00
0.00
08-710 - Door Hardware
60,000.00
4,249.88
-55,750.12
08.711 - Door Hardware (S&C)
12.000.00
7,867.44
4,132.56
08-810 - Mirror Glass L & M
675.00
0.00
-675.00
Total 08 Doors and Windows
203,001.00
142669.75
40,331.25
09 Finishes
09-120 - Ceiling Support Coff.
52,940.00
52.940.00
0.00
09-121 - Terrace Ceiling Framin
14,640.00
13.107.75
-1,532.25
09-200 - Plaster & Lath
25.760.00
25.760.00
0.00
09-220- Cementitious Coatings
30,000.00
30,000.00
0.00
09-230- Aggregate Coatings
0.00
0.00
0.00
09-350 • Portugese Tile L
0.00
0.00
0.00
09-510 - Wood Ceiling • M
22,000.00
18.127.45
-3,872.55
09-511 - Wood Ceiling-Material
18,000.00
16,183.76
-1,816.24
09-550-Wood Flooring-L
20,000.00
2,978.16
-17.021.84
09-551-Wood Flooring-M
66,000.00
48,914.35
-17.085.65
09-600 - Stone Flooring L
22,290.00
21,857.20
-43280
09-601 - Stone Flooring - Mater
13,500.00
12,157.38
-1,342.62
09-920 - Interior Painting
7,000.00
5,146.66
-1.853.34
09-930 - Int. Painting - M
1,500.00
915.00
-58560
09.940 - Roof
23000.00
15,256.90
-9,743.10
09-950 - Est. Painting Material
5,000.00
922.38
-4,077.62
09.960 - Decorative Painting
0.00
7,212.75
7,212.75
Total 09 Finishes
323,630.00
271,479.74
-52,150.26
10 Specialities
10.200 - Vents
50.00
9.47
•40.53
10-800 - Toilet Accessories
500.00
0.00
-500.00
10-801 -Accessories - Material
1,450.00
617.21
-832.79
Total 10 Specialities
2,000.00
626.68
-1,373.32
11 Equipment
11.451 • Kitchen Equipment
2.504.00
679.43
-1,824.57
Total 11 Equipment
2,504.00
679.43
-1.824.57
Page 2
EFTA01118359
2:14 PM
LSJ, LLC
Job Estimates vs. Actuals Detail for 1001 - Office Pavilion
All Transactions
01/10/11
12 Furnishings
Est. Cost
Act. Cost
(5) Dill.
12-310 - Granite Countertop
3.000.00
4,933.80
1.933.80
Total 12 Furnishings
looaco
4.933.80
1533.80
15 Mechanical
15-400 - Plumbing-AC
238,530.00
234.779.15
-3,750.85
15401-Nash Installation
22,718.00
10.050.00
-12.668.00
15.402 -Nash AC
9.000.00
6.850.20
-2,149.80
Total 15 Mechanical
270.248.00
251.679.35
-18.568.85
16 Electrical
16-000 - Electrical Complete
86,385.00
85.111.50
-1.273.50
16-010 • Optical Fiber
9,000.00
0.00
-9,000.00
16-020 - Wire Pull
2.500.00
0.00
-2500.00
18-030 - Data&Telecom Install
5,000.00
0.00
-5,000.00
16-040 • Data8Telecom Install M
3,000.00
0.00
-3000.00
16-050-Data&Teletom Equip8Terrn
5,000.00
0.00
-5.000.00
Total 16 Electrical
110,885.00
85.111,50
-25.773.50
17 Electrical Fixtures
17.010-Glidden Revised Fixtures
15,000.00
15.735.54
735.54
17-020-Glidden Add Outlets
1,200.00
0.00
-1,200.00
17-030-Glidden Dimming Access
10,000.00
254.53
-9,745.47
17-040-Glidden Temp Power
5.000.00
0.00
-5.000.00
Total 17 Electrical Fixtures
31,200.00
15,990.07
-15.209.93
Total Office Pavilion
2,732,459.23
2.480.941.31
-251517.92
Total Service
2,732,459.23
2,480,941.31
-251.517.92
TOTAL
2,732,459.23
2,480,941.31
-251,517.92
e)
Page 3
EFTA01118360
2:14 PM
LSJ, LLC
01/10/11
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Dale
Num
Service
Office Pavilion
08 Doors and Windows
08.210 - Doors & Frames Labor
Check
11/712008
13938
Credit Card Charge
4/152009
Check
4/30/2009
MEMO
Check
5/14/2009
MEMO
Check
6/4/2009
MEMO
Check
6/302010
MEMO
Total 08-210 - Doors & Frames Labor
Total 08 Doors and Windows
Total Office Pavilion
Total Service
TOTAL
Source Name
M.S.I. Building Supplies
Tropical Shipping Co., Ltd.
Island Grounds. Inc. - Timesheet
Island Grounds. Inc. - Timesheet
Island Grounds. Inc. - Timesheet
Island Grounds, Inc. - Timesheet
Amount
203.94
703.75
1.159.20
1,925.10
165.60
248.40
4.405.99
_
.
4,405.99
4.405.99
4.405.99
4,405.49
Page 1
EFTA01118361
2:15 PM
LSJ, LLC
mom
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Office Pavilion
12 Furnishings
12-310 - Granite Countertop
Check
10/21/2009
MEMO
VI Granite & Marble
2.466.90
Check
10/27/2009
MEMO
VI Granite & Marble
2.466.90
Total 12-310 • Granite Countertop
4,933.80
Total 12 Furnishings
4,933.80
Total Office Pavilion
4,933.80
Total Service
4.933.80
TOTAL
4,933.80
Page 1
EFTA01118362
2:08 PM
LSJ, LLC
mom
Job Estimates vs. Actuals Detail for 1002 - Mechanical Building
All Transactions
Service
Mechanical Building
01 General Requirements
01.100 - Holiday Allocation
01.101 - Burden
01-516 - Temp. Toilet Supplies
01.517 First Aid Supplies
01-518 - Temp. Fire Protection
01.522 • Temp. Enclosures
01-590 - Field Office Supplies
01.610 • Misc. Labor
01.621 - Temp. Protection
01.624 - Construction Cleaning
01.625 - Final Cleaning
01.628 - Safety
01-645 - Expendables
01.864 • Equipment Rental
01-665 - Equipment Operation
Est. Cost
Act. Cost
(5) Diff.
0.00
0.00
0.00
0.00
350.00
1,750.00
0.003.00
7,200.00
3,500.00
7,100.00
2.51090
2,750.00
5,500.00
3,000.00
10,000.00
57.522.60
44.068.82
0.00
0.00
0.00
511.20
0.00
2.205.04
L465.20
4,112.72
0.00
1 .903.90
1
3.62
9451:847
8.460.80
57.52200
44,068.82
0.00
0.00
-350.00
-1,238.80
0.00
4.994.96
-2.034.80
-2987.28
-2.510.50
-846.1099
-1 978
-2.054.13
-1,539.20
01.712 • Superintendent
01450 - Plans - Reproduction
0.00
2,000.00
0.00
0.00
-2
01-900 - Gen. Office Requires
2,72000
2,002.16
:0007170...8400
00
Total 01 General Requirements
48,380.50
128,819.72
78.43822
02 Sitework
02-000 - Testing
34,771.00
37.611.10
2.840.10
02-050 - Survey
9,853.00
6.347.17
-3.505.83
02-051 - Core Drilling
8,000.00
765.02
-7.234.98
02-120ECL - Erosion Control - L
450.00
0.00
-450.00
02-120ECM • Erosion Control - M
0.00
0.00
0.00
02-120ECMi - Erosion Mats
1,320.00
1,320.00
0.00
02-120ECMii - Erosion Staples
180.00
90.00
-90.00
02-120EFLL - Erosion Fence - L
1,320.00
0.00
-1.320.00
02-120EFM - Erosion Fence • M
3,698.00
0.00
-3.698.00
02-120EML - Erosion Mats - L
2,160.00
0.00
-2.160.00
02-120EM0 - Erosion Mat Deliver
160.00
115.72
-44.28
02-200 - Dump Truck & Operator
26,000.00
26.000.00
0.00
02-200 - Earthwork
78.675.00
69,369.67
-9,305.33
02-200 - Fuel
0.00
0.00
0.00
02-211 - Rock Removal
7,875.00
7.446.90
-428.10
02-281 - Pest Control
2,521.00
2,400.00
-121.00
02-411 - Foundation Drain
4,600.00
4,595.52
-4.48
02.800 - Trench Conduit
19,655.00
9,498.45
-10156.55
Total 02 Sitework
201,238.00
165,559.55
-35,678.45
03 Concrete
03-110 - CIP Concrete - Labor
39,799.00
11.989.36
-27.809.64
03-120 - Complete Sub
709,500.00
687,402.06
-22.097.94
03-130 - 50004 Concrete
151,800.00
129,540.27
-22.259.73
03.130 • Low Strength Buttress
0.00
0.00
0.00
03-154 - FormS & Accessories
10.500.00
5.288.74
-5,211.26
03-301 - Admixtures
2,000.00
885.00
-1.11500
03-362 - Pumping
23.000.00
17,910.00
-5,090.00
Total 03 Concrete
936,599.00
853,015.43
-83,583.57
04 Masonry
04-220 - CMU
27,000.00
21,343.64
-5.656.36
Total 04 Masonry
27,000.00
21,343.64
-5.656.36
05 Metals
05-050 - Fasteners (SS) - M
800.00
753.18
-46.82
05-120 • Steel Railing
10.000.00
3,537.62
-6.462.38
05-541 - CIP Stair Nosings
0.00
0.00
0.00
05-542 - Bollards
350.00
191.96
-158.04
Total 05 Metals
11,150.00
4,482.78
-6.667.24
Page 1
EFTA01118363
2:08 PM
LSJ, LLC
mon,
Job Estimates vs. Actuals Detail for 1002 - Mechanical Building
All Transactions
06 Wood
Est. Cost
Act. Cost
(5) Dili.
06-050 - Fasteners (SS) • M
3,000.00
0.00
-3.000.00
06-100 - Rough Carpentry - L
11,600.00
5.127.46
-6.472.54
06-101 - Rough Carpentry - M
2000.00
0.00
.2,50000
Total 06 Wood
17,100.00
5.127.46
-11.972.54
07 Moisture/Thermal
07-110 - Membrane Water Proofin
9.080.00
10.16730
1,087.30
07-270 - Fire Stopping
6,000.00
0.00
-6,000.00
07450 - Roof Water Proofing
8.823.50
8.87837
54.87
07.900 - Joint Sealants • L&M
2,521.00
1.264.60
-1.256.40
Total 07 Moisture/Thermal
26,42450
20.310.27
-6,114.23
08 Doors and Windows
06-100 • FRP Doors & Frames - L.
23.675.00
8.46430
-15.210.70
08-100 - FRP Doors & Frames - M
41,525.00
40,165.41
-1.359.59
08-510 - Int. Lite Frames - L
0.00
0.00
0.00
08-510 - IM. Lite Frames - M
0.00
0.00
0.00
08-710 • Door Hardware
6800.00
1,159.20
-4.640.80
Total 08 Doors and Windows
71,000.00
49,788.91
-21.211.09
09 Finishes
09-910 - Painting Complete
15,000.00
12.52440
-2.475.60
Total 09 Finishes
15.000.00
12.52440
-2.475.60
10 Specialities
10-200 - Louvers
25,500.00
25076.52
-423.48
10-400 - Signage
500.00
0.00
-500.00
10-520 - Fire Extinguishers
1,725.00
0.00
-1.725.00
10-700 • Hurricane Shutter
26,400.00
26.142.00
-258.00
Total 10 Specialities
54.125.00
51,218.52
-2.906.48
13 Special Construction
13-410 • Storage Tanks • M
130,98691
130,988.91
0.00
13-411 - Storage Tanks - L
1,853.60
1,853.60
0.00
13-450-Fuel Pumping Systems•M
90,420.00
85.850.34
-4569.66
13-500 - Power Gen. Systems - M
312,400.00
312.15962
-24038
13-501 - Power Gen. Systems - L
0940.00
6,752.72
•187.28
13-502-Power Gen. Sys. - Set Up
14,000.00
3.953.45
-10,046.55
Total 13 Special Construction
556,602.51
541,558.64
•15,043.87
15 Mechanical
15-310 - Mech. Piping Systems
100,631.49
32,068.33
-68543.16
15-400 - Plumbing
45,000.00
14,725.00
-30.275.00
15-500 - Fire Protection System
259,892.00
198,866.83
-61.025.17
15-800 - HVAC
56344.52
31,668.27
-26076.25
Total 15 Mechanical
463,868.01
277,348.43
-186.519.58
16 Electrical
16-000 - Electrical Complete
1,030,261.00
892,320.30
-137.940.70
16-001 - Mach Building to Comp
158.760.05
156760.00
-0.05
16-002- Mech Building to Eng
50,582.00
50,582.00
0.00
16-003 - Comp to Pavilion
42,932.00
42,932.00
0.00
16-004 - Eng to Woodshop
2224200
22243.00
0.00
16-005 - Can to Mach Building
28,404.00
26,404.00
0.00
Total 16 Electrical
1,331,182.05
1,193,241.30
-137.940.75
Total Mechanical Building
3,759,669.57
3.322.339.03
-437.330.54
Total Service
3,759,669.57
3,322,339.03
-437.330.54
TOTAL
3,759,669.57
3,322,339.03
-437,330.54
Page 2
EFTA01118364
2:09 PM
0110/11
LSJ, LLC
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Mechanical Building
02 Sitework
02-000 - Testing
Check
1/9/2009
14090
Kraus Manning, Inc.
523.50
Check
2/13/2009
14144
Kraus Manning. Inc.
1,527.00
Check
2/26/2009
14163
Kraus Manning, Inc.
4,114.00
Check
4/1/2009
14225
Kraus Manning, Inc.
2365.60
Check
7/29/2009
MEMO
Kraus Manning. Inc.
9.241.00
Check
8/12/2009
MEMO
Kraus Manning. Inc.
885.00
Check
9/30/2009
MEMO
Kraus Manning. Inc.
910.00
Credit Card Charge
10/15/2009
M.S.I. Building Supplies
161.00
Check
6/14/2010
WIRE
Kraus Manning. Inc.
390.00
Check
6/14/2010
WIRE
Kraus Manning. Inc.
585.00
Check
8117/2010
WIRE
Kraus Manning. Inc.
4.745.00
Check
8/17/2010
WIRE
Kraus Manning. Inc.
520.00
Check
817/2010
WIRE
Kraus Manning. Inc.
4,576.00
Check
9/20/2010
WIRE
Kraus Manning. Inc.
2.613.00
Check
11/16/2010
WIRE
Kraus Manning. Inc.
2,245.00
Check
12/17/2010
WIRE
Kraus Manning. Inc.
2,210.00
Total 02000 - Testing
37,811.10
Total 02 Sitework
37,611.10
Total Mechanical Building
37,611.10
Total Service
37,611.10
TOTAL
37,611.10
Page 1
EFTA01118365
2:10 PM
LSJ, LLC
01110/11
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Service
Mechanical Building
07 Moisture/Thermal
07-110 - Membrane Water Proolin
Credit Card Charge
Credit Card Charge
Check
Check
Credit Card Charge
Check
Check
Check
Check
Credit Card Charge
2/26/2009
4/16/2009
4/24/2009
4/30/2009
8/14/2009
W30/2009
10/21/2009
11/3/2009
12/28/2009
1/1/2010
14258
MEMO
MEMO
MEMO
MEMO
WIRE
Total 07.110 - Membrane Water Proolin
Total 07 Moisture/Thermal
Total Mechanical Building
Total Service
TOTAL
Home Depot Credit Services
Sea Chest
Home Depot Credit Services
Island Grounds, Inc. - Timesheet
Red Hook Ace - Lafayette
Island Grounds. Inc. Timesheet
Island Grounds. Inc. • Timesheet
Island Grounds. Inc. - Timesheet
American Export Company
Tropical Shipping Co., Ltd.
Amount
359.91
94.96
84.66
1,530.00
299.94
360.00
1,183.20
2,043.90
3,746.15
464.58
10,167.30
10,167.30
10,167.30
10.167.30
10,16730
Page 1
EFTA01118366
01/10/11
2:05 PM
LSJ, LLC
Job Estimates vs. Actuals Detail for 1004 - Master Suite
All Transactions
07 Moisture/Thermal
Est. Cost
Act. Cost
CS) Diff.
07-160 - Bituminous Damprooling
5.900.00
4048.38
-1,851.84
07-240-EFTS Cornice-Gutter
25.600.00
15.175.44
-10.424.56
07-412-Metal Roofing-Labor
33.000.03
25.538.52
-7.461.48
07-413-Metal Roofing-Material
35,000.00
30.97732
-4,022.48
07-623-Copper Flashing-Labor
18000.00
11,442.20
-3,557.80
07-624-Copper Flashing-Material
12.000.00
4.985.73
-7.014.27
07-632 - Downspout Rough-L&M
4,000.00
2,544.18
-1.455.82
07-900 - Joint Sealants-L&M
3,000.00
1.563.80
-1.419.20
Total 07 Moisture/thermal
133.500.00
96.292.75
-37.207.25
08 Doors and Windows
08-210 • Ext. Wood Doors/Frames
18188.00
18512.62
-5.853.38
08-2114nt. Doors&Frames-Labor
1,500.00
0.00
-1.500.00
08.212•Int.Doors&Frames•Materia
7,500.00
4.977.00
-2.523.00
08-370-AI.Doors-Frames-Sub
11,000.00
9,116.70
-1,883.30
08-371-Glass Shower Enclosures
20,000.00
0.00
-20.000.00
08.610-Door-Window Shutters-Sub
10,000.00
7,500.50
-8499.50
08-710•Finish Hardware-Labor
700.00
0.00
-700.00
08-711-Finish Hardware-Material
8600.00
387.50
-2.212.50
08.810•Mirror Glass•t.&M
2,430.00
0.00
-2.430.00
Total 08 Doors and Windows
71,896.00
32,494.32
-39.401.68
09 Finishes
09.120-Ceiling Support•Flat
3,500.00
1,593.60
-1.906.40
09-200 • Plaster
23.00800
20.79780
-2203.00
09-320-Wall Coral Stone-Labor
0.00
0.00
0.00
09-321-Wall Coral Stone-Materia
0.00
0.00
0.00
09-340-Marble Ceilings-Labor
38,000.00
22.386.00
•15.614.00
09.341-Marble Ceilings-Material
09-510 - Wood Ceilings
100.000.00
18.280.00
104,159.80
18,250.11
415960
-29.89
O
09-550 - Wood Flooring
19,600.00
10.818.98
-8.781.02
09-551-Wood Flooring Refinishin
5,320.00
5,197.00
-123.00
09400-Floor Tile Patch•Repair
4,350.00
2,007.76
-2,342.24
09-601-Coral Stone Flooring-Lab
166.00
165.60
43.40
09-602-Coral Stone Flooring•Mat
9,658.00
6,500.00
4.15880
09-603-Terrace Stone Flooring-L
9,550.00
7314.00
-2.236.00
09-604-Terrace Stone Flooring-M
0.00
1,444.80
1,444.80
09-910-Exterior Painting
10.00800
745.66
-9.254.34
09-920 - Interior Painting
18,000.00
1,178.00
-16,824.00
Total 09 Finishes
259.424.00
202.558.11
-58887.89
10 Specialties
10-800 • Toilet Accessories-M
8.850.00
0.00
4850.00
10-801-Toilet Accessories - L
2,480.00
0.00
-2.480.00
Total 10 Specialties
11,330.00
0.00
-11.330.00
12 Furnishings
12-311- Reuse Existing Vanities
5,240.00
0.00
-5.240.00
Total 12 Furnishings
5,240.00
0.00
-5.240.00
13 Special Construction
13-085 • Exterior Shower
32,500.00
2,135.30
40.364.70
13-130 • Steam Room Equipment-M
4,750.00
4,830.90
80.90
13.131-Steam Room Equipment-L
500.00
115.00
-385.00
Total 13 Special Construction
37,750.00
7,081.20
40.868.80
15 Mechanical
15-305 - Cistern Piping
350.00
343.92
-6.06
15-400 - Plumbing
16.500.00
16.678.72
178.72
15-401 - Plumbing Fixture Allow
19.000.00
15.180.33
-3.819.87
15-451 - Fixture Allowance
500.00
0.00
-500.00
15-800 - HVAC
50,000.00
33.208.77
-16,791.23
Total 15 Mechanical
86,350.00
65,411.74
-20.938.26
Pegs 2
EFTA01118367
2:05 PM
01/10/11
LSJ, LLC
Job Estimates vs. Actuals Detail for 1004 - Master Suite
All Transactions
16 Electrical
Est. Cost
Act. Cost
MDR
16-000 - Electrical Complete
31,500.00
18.092.00
-13.40800
16-001 - Electrical Finish
5,000.00
0.00
-5.000.00
16-510-Electrical Fixture Allow
21,000.00
0.00
-21,000.00
16-700 - Communications
5,000.00
0.00
-5.000.00
Total 16 Electrical
82.500.00
18,092.00
-44.408.00
Total Master Suite
1,128,935.00
772.588.98
-354.348.02
Total Service
1.126.935.00
772.586.98
-354.348.02
TOTAL
1,126.935.00
772,586.98
-354,348.02
Page 3
EFTA01118368
2:06 PM
LSJ, LLC
(mom
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Service
Master Suite
09 Finishes
09-341-Marble Ceilings-Material
Check
8/5/2010
WIRE
Check
8/17/2010
WIRE
Check
9/1/2010
WIRE
Credit Card Charge
Credit Card Charge
Credit Card Charge
Credit Card Charge
Check
Credit Card Charge
Check
Credit Card Charge
Check
Check
Credit Card Charge
Chock
Check
9/20/2010
8/20/2010
9/2012010
9/20/2010
9/20/2010
1921
9/23/2010
9/29/2010
14579
10/19/2010
10/20/2010
1926
10/20/2010
1927
1021/2010
11/17/2010
14802
12/28/2010
WIRE
Total 09-341-Marble Ceilings-Material
Total 09 Finishes
Total Master Suite
Total Service
TOTAL
Source Name
Makedonika Marble, Inc.
Makedonika Marble. Inc.
Makedonika Marble, Inc.
M.S.I. Building Supplies
M.S.I. Building Supplies
M.S.I. Building Supplies
M.S.I. Building Supplies
U.S. Customs and Border Protecti0n
Tropical Shipping Co.. Lid.
Johnny Weekes
M.S.I. Building Supplies
V. I. Bureau of Internal Revenue
U.S. Customs and Border Protection
Tropical Shipping Co.. Ltd.
Johnny Weekes
Makedonika Marble. Inc.
Amount
36450.00
47,652.50
1,575.00
485.86
344.24
357.00
1.444.80
1475.00
502.50
103.02
1,357.50
50.00
2.706.18
3,741.00
415.00
5,200.00
104,159.60
104,159.60
104,15940
104,159.60
104,159.60
Page 1
EFTA01118369
2:06 PM
01/10/i1
TYM
LSJ, LLC
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Date
Num
Source Nam*
Amount
Service
Master Suite
09 Finishes
09-604-Terrace Stone Flooring-M
Credit Card Charge
10/19/2010
M.S.I. Building Supplies
1.44480
Total 09404-Terrace Stone Floodng-M
1.44480
Total 09 Finishes
1,444.80
Total Master Suite
1,444.80
Total Service
1,444.80
TOTAL
1,444.80
Page 1
EFTA01118370
1:54 PM
LSJ, LLC
01/10/11
Job Estimates vs. Actuals Detail for 1006 - Laundry
All Transactions
Service
laundry
01 Direct Expenses
Esc Cost
Act. Cost
($) Dirt.
01-100 - Holiday Allocation
0.00
296.31
298.31
01-101 - Burden
0.00
176.93
178.93
01.610 - Material Handling
2.400.00
1,287.12
-1,112.88
01-621 - Temporary Protection
1.500.00
80.00
-1,420.00
01-624 • Construction Cleaning
1.440.00
769.88
470.12
01.645 • Expendables
2250.00
1,278.77
-971.23
01-646 - Small Tools
1.700.00
533.40
-1,186.80
01.665 - Equipment Rental
1.500.00
0.00
-1,600.00
01-900 - Misc. Expenses
500.00
184.00
-316.00
Total 01 Direct Expenses
11.290.00
4,806.41
.8,883.59
02 Site Work
02-000 - Inspection-Testing
3,500.00
3,606.00
108.00
02.005. Layout/Survey
1,500.00
1,104.00
-396.00
02.200 - Excavation•BacMtll
10.000.00
10,437.86
437.86
02-281 - Pest Control
1.178.00
1,175.00
-1.00
02-480 - Landscaping
3,000.00
0.00
4.000.00
02.740 • Septic System
10,500.00
10,228.00
-272.00
Total 02 Site Work
29.876.00
26,552.86
-3,123.14
03 Concrete
03-111 • Footing
8.300.00
8,276.40
-23.80
03-130. 40004 Concrete
9,405.00
8.746.92
-658.08
03-154 - Shoring
900.00
855.20
-44.80
03-171 - Stairs
2225.00
2,201.44
-23.56
03-173 - Slab on Grade
1,350.00
1,332.80
-17.20
03-174 • Elevated Slab
8.280.00
8,279.04
-0.98
03-210 • Reber
6,700.00
6,884.16
-15.84
03-362 - Pumping
1,525.00
2,885.00
1,360.00
03-600 - Grouting
270.00
1,360.19
1,090.19
Total 03 Concrete
38,955.00
40,621.15
1,666.15
04 Masonry
04-220 - CMU
6.880.00
7,042.80
162.80
04-424 • Coral Stone Tile
19,550.00
270.32
-19,279.88
04-450 - Native Stone Veneer
21,000.00
20.659.20
•340.80
Total 04 Masonry
47.430.00
27,972.32
-19,457.68
06 Carpentry
06-050 - Fasteners • Material
1,500.00
1,459.04
40.96
06-100 - Rough Carpentry - L
3,200.00
1,423.60
-117040
06-101 - Rough Carpentry - M
3,000.00
0.00
-3.000.00
06-200 • Finished Carpentry
10,000.00
7,250.00
-2,750.00
Total 06 Carpentry
17,700.00
10.132.64
-7,587.38
08 Doors and Windows
08-100 - Metal Doors & FramesM
3.100.00
3.080.29
-19.71
08-101 • Metal Doors & Framest.
480.00
866.00
396.00
08-711 - Finish Hardware- L
240.00
0.00
-240.00
Total 08 Doors and Windows
3,820.00
3,946.29
128.29
09 Finishes
09-200 - Plaster
5,500.00
5,430.87
-69.13
09-310- Ceramic Tile Floor
8,500.00
8.369.61
-180.49
09-910 - Exterior Painting
500.00
0.00
-500.00
09-920 • Interior Painting
1,000.00
0.00
.1,00000
Total 09 Finishes
15,500.00
13,800.38
-1,899.02
10 Specialities
10-520 - Fire Extinguishers
500.00
0.00
-500.00
10-670 • Storage Shelving
3,500.00
0.00
-3.500.00
Total 10 Specialities
4,000.00
0.00
4.000.00
Page 1
EFTA01118371
1:54 PM
LSJ, L LC
mom
Job Estimates vs. Actuals Detail for 1006 - Laundry
All Transactions
11 Equipment
Est. Cost
Act. Cost
(5) DK
11.452 - Laundry Equipment
10.000.00
8,400.00
-1,000.00
Total 11 Equipment
10,000.00
8,400.00
-1,600.00
15 Mechanical
15400 - Plumbing
20,885.00
6,683.05
-14,201.95
15.600 • AC System
6.000.00
5.080.00
-920.00
Total 15 Mechanical
26,885.00
11,763.05
-15,121.95
16 Electrical
16-000 - Electrical Complete
15'50.00
18,303.41
2.563.41
LJ
Total 16 Electrical
15,750.00
18,303.41
2,553.41
Total Laundry
221,006.00
166,098.51
-54,907.49
Total Service
221,006.00
166,096.51
-54.907.49
TOTAL
221,006.00
166,098.51
-54,907.49
Page 2
EFTA01118372
1:58 PM
01/10/11
LSJ, LLC
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Laundry
03 Concrete
03-382 - Pumping
Check
8/5/2010
14553
Earl King
1,515.00
Check
10/15/2010
WIRE
Pro Concrete Pumping
1,370.00
Total 03-382 - Pumping
2.885.00
Taal 03 Concrete
2,885.00
Total Laundry
2.885.00
Total Seivice
2,885.00
TOTAL
2,885.00
6
Page 1
EFTA01118373
1:59 PM
01/10/11
LSJ, LLC
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Laundry
03 Concrete
03-600 - Grouting
Check
8/13/2010
14558
Dream Engineering and Trucking
270,00
Crelt Card Charge
9/1/2010
Heavy Materials. LLC
1,090.19
Total 03-600 - Grouting
1,380.19
Total 03 Concrete
I .380.19
Total Laundry
1,360.19
Total Service
1,360.19
TOTAL
1,360.19
Q)
Page 1
EFTA01118374
1:69 PM
LSJ, LLC
mom,
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Dale
Num
Service
Laundry
16 Electrical
16.000 - Electrical Complete
Credit Card Charge
12/18/2009
Credit Card Charge
12/18/2009
Credit Card Charge
1/7/2010
Credit Card Charge
1/7/2010
Credit Card Charge
1/7/2010
Credit Card Charge
1/21/2010
Check
10/20/2010
WIRE
Total 16.030 - Electrical Complete
Total 16 Electrical
Total Laundry
Total Service
TOTAL
Source Name
Commun(cations Supply Co.
Communications Supply Co.
Tropical Shipping Co., Ltd.
Tropical Shipping Co.. Ltd.
Tropical Shipping Co.. Ltd.
Communications Supply Co.
Michael J. Glidden Electrical Services
Amount
844.54
1,101.38
64.12
44.60
71.73
$492.04
12.685.03
18,303.41
18.30341
18,303.41
18,303.41
18,303.41
Page 1
EFTA01118375
1:44 PM
LSJ, LLC
01/10/11
Job Estimates vs. Actuals Detail for 1007 - Kitchen
All Transactions
Service
Kitchen
01 Direct Expenses
Est. Cost
Act. Cost
(5) Diff.
01.045 - Cut 8 Patch
1.500.03
0.00
-1,500.00
01.100 - Holiday Allocation
0.00
0.00
0.00
01.101 - Burden
0.00
0.00
0.00
01410 • Material Handling
8.320.00
1,576.92
4,743.08
01421 - Temporary Protection
1,500.00
0-00
-1,500.00
01.624 • Construction Cleaning
3.12000
215.12
4,904.88
01-645 - Expendables
3.0(10.00
771.29
-2,228.71
01-646 • Small Tools
3,200.00
713.52
-2486.48
01.665 - Equipment Rental
2,000.00
0.00
-2.000.00
01-900 - Misc. Expenses
5,000.00
0.00
4.000.00
Total 01 Direct Expenses
27,640.00
3,276.85
-24.363.15
02 Sitework
02-000 - Inspection • Testing
2.500.00
2,500.00
0.00
02-005 - Layout/Survey
3,000.00
1,610.00
-1,390.00
02.050 - Demolition
12,000.00
11,872.35
.127.65
02-200 - Excavation-BacIdill
3.000.00
1,788.40
-1,211.60
02.281 - Pest Control
625.00
825.00
0.00
Total 02 Sitework
21.125.00
18,395.75
-2,729.25
03 Concrete
03-111 - Footings
2,500.00
2,573.52
73.52
03-130 - 40004 Concrete
4,800.00
4,394.78
405.22
03-172 - Retaining Walls
14.000.00
14,352.59
352.59
03-173 - Slab on Grade
2,581.00
2,493.60
-87.40
03-600 - Growing
1,200.00
1,138.09
-63.91
Total 03 Concrete
25,081.00
24.95058
-130.42
04 Masonry
04-220 - CMU
6,500.00
7,106.46
606.46
04-424 - Coral Stone Tile
8,325.00
000
4,325.00
04-450 - Native Stone Veneer
35,000.00
34,090.00
-910.00
Total 04 Masonry
49.825.00
41.198.46
-8,628.54
06 Carpentry
06-050 • Fasteners
3,000.00
237848
421.54
06.100 • Rough Carpentry -1.
21,250.00
21,351.05
101.05
06-101 • Rough Carpentry - M
52.000.00
28,161.82
-23,838.18
06.400 - Casework
129,487.00
105,210.00
44,257.03
Total 06 Carpentry
205,717.00
157,101.33
-48,815.67
07 Moisture and Thermal
07-240 - EFIS Cornice - Gutter
3,000.00
375.34
-2,624.88
07-412 - Metal Roofing - L.
2880.00
2,787.12
107.12
07.413 - Metal Roofing - M
6.36000
0.00
-6,360.00
07423 • Copper Flashing - L
1,840.00
168.00
-1.672.00
07424 - Copper Flashing - M
2,400.00
1,257.17
.1,142.83
07.632 -Downspout Rough L&M
5.000.00
1,779.31
4,220.69
07-810 - Skylights
4,500.00
3,112.00
-1,388.00
07-900 - Joint Sealants • L&M
1,500.00
0.00
-1,600.00
Total 07 Moisture and Thermal
27,280.00
9,478.94
-17,801.06
08 Doors and Windows
08-210 • Ext. Wood Doors • M
18,382.00
12,553.55
-5,828.45
08-211 -Ext. Wood Doors L
1,86000
43200
-1,228.00
08.270 - Al. Doors
7,500.00
1,48200
4,011.00
08.610 - Door Shutters
7,000.00
816.00
4,184.00
08.710 - Finish Hardware M
3,150.00
0.00
-3,150.00
08-711 - Finish Hardware L
1.980.00
000
-1,980.00
Total 08 Doors and Windows
39,672.00
15.290.55
-24,381.45
Page 1
EFTA01118376
1:44 PM
01/10/11
LSJ, LLC
Job Estimates vs. Actuals Detail for 1007 - Kitchen
All Transactions
09 Finishes
Est. Cost
Act. Cost
(5) M.
09-200 • Plaster
5.000.00
16,486.44
11.46644 0
09.301
• Floor Tile • Labor
09-301 • Floor Tile • Material
39.000.00
YAM
32,130.00
-8,870.00
09.511 - Wood Ceilings • M
22.500.00
1.49600
-21,010.00
09-910 - Exterior Painting
2,500.00
1,557.80
-942.20
09.911 • Interior Painting
5200.00
2.095.70
-2,904.30
Total 09 Finishes
78,000.00
53,739.94
-24,260.06
10 Specialties
10-520 - Fire Extinguishers
1.000.00
0.00
-1.000.00
10-670 - Storage Shelving
10.000.00
0.00
-10,000.00
Total 10 Specialties
11.000.00
0.00
-11,000.00
11 Equipment
11-451 - Kitchen Equipment
50.000.00
25.669.00
-24.331.00
Total 11 Equipment
50.000.00
25.869.00
-24.331.00
12 Furnishings
12-310 - Stone Countertops
35,000.00
11,268.92
-23,731.08
Total 12 Furnishings
30.00060
11268.92
-23,731A8
15 Mechanical
15.400 - Plumbing
5.50060
4,396.45
-1,103.55
15-600 - AC System
31,000.00
4,684.10
-26,315.90
Total 15 Mechanical
36.500.00
9,080.56
-27,419.45
16 Electrical
16-000 - Electrical Complete
25,75060
10,533.44
-15,216.56
Total 16 Electrical
25.750.00
10,533.44
-15,216.56
Total Kitchen
632,590.00
379,982.31
-252,807.69
Total Service
632,590.00
379,982$1
-252.607.69
TOTAL
632,590.00
379,982.31
-252,607.69
Page 2
EFTA01118377
1:46 PM
01/10/11
LSJ, LLC
Item Actual Cost Detail
March 12, 1996 through January 22, 2011
Type
Dare
Num
Source Name
Amount
Service
Kitchen
09 Finishes
09-200 - Plaster
Check
10/13/2010
MEMO
Island Grounds. Inc. • Timesheet
592.81
Check
10/25/2010
MEMO
Island Grounds. Inc. • Timesheet
4,593.52
Check
10/29/2010
MEMO
Wand Grounds. Inc. - Timesheet
2.58544
Check
11/1/2010
14597
Dream Engineering and Trucking
98.75
Credit Card Charge
115/2010
M.S.I. Builckng Supplies
367.00
Credit Card Charge
11/5/2010
M.S.I. Building Supplies
714.00
Chock
11/17/2010
MEMO
Island Grounds. Inc. Timesheet
4,544.80
Check
11/29/2010
MEMO
Island Grounds. inc. - Timesheet
1,324.80
Credit Card Charge
12/7/2010
M.S.I. Building Supplies
357.00
Credit Card Charge
12/712010
M.S.I. Buildng Supplies
45.36
Credit Card Charge
12/7/2010
M.S.I. Bullring Supplies
357.00
Check
12/29/2010
MEMO
isiand Grounds. Inc. - Timesheet
886.16
Total 09.200 • Plaster
16,468.44
Total 09 Finishes
16.486.44
Total Kitchen
16,468.44
Total Service
16.46544
TOTAL
16,466.44
Page 1
EFTA01118378
1:41 PM
LSJ, LLC
01/10/11
Job Estimates vs. Actuals Detail for 1008 - Tiki Hut
All Transactions
Service
Tiki Hut
01 Direct Expenses
Est. Cost
Act. Cost
(6) Diff.
01.045 - Cut & Patch
1.600.00
0.00
-1,800.00
01-522 • Temp Enclosures/Safety
500.00
0.00
-500.00
01.610 - Material Handling
1,000.00
0.00
-1,000.00
01.624 - Construction Cleaning
320.00
0.00
-320.00
01445 - Expendables
500.00
227.57
-272.43
01-665 - Equipment Operation
600.00
0.00
-600.00
01-900 - Misc. Expenses
500.00
0.00
-500.00
Total 01 Direct Expenses
5.020.00
227.57
-4,792.43
02 Sitework
02-050 - Demolition
1,600.00
0.00
-1,800.00
02-150 - Shoring/Staging
5,060.00
0.00
-5.000.00
02-200 - Walls/Pads
206000
0.00
-2,000.00
Total 02 Sltework
8.603.00
0.00
-8,800.00
06 Wood
06-050 - Fasteners
1,500.00
0.00
-1.500.00
06-100 - Carpentry
0.00
3,771.08
3,771.08
Total 06 Wood
1,500 00
3,771.08
2,271.08
07 Moisture/Thermal
07-412 • Metal Roofing - Labor
20,00a00
11,379.91
-8,820.09
Total 07 Moisture/Thermal
20,000.00
11,379.91
-8,620.09
09 Finishes
09-510 - Bamboo Ceilings
6,000.00
241.49
-5,758.51
09.920 • Painting
2.500.00
0.00
-2,500.00
Total 09 Finishes
8,500.00
241A9
-8,258.51
16 Electrical
16-000 - Electrical Complete
10,000.00
254.00
-9,746.00
Total 16 Electrical
10,000.00
254.00
4,748.00
Total Tiki Hut
53,620.00
15,874.05
-37,745.95
Total Service
53.820.00
15,874.05
47,745.95
TOTAL
53,620.00
15,874.05
-37,745.95
Page 1
EFTA01118379
1:42 PM
LSJ, L LC
01/10/11
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Service
Tiki Hut
06 Wood
06-100 - Carpentry
Num
Source Name
Amount
Check
12/14/2010
MEMO
Island Grounds. Inc. - Timesbeet
3.427.08
Check
12/29/2010
MEMO
Island Grounds. Inc. - Timesheel
344.00
Total 06.100 • Carpentry
3,771.08
Total 06 Wood
3.771.08
Total Tiki Hut
3.771 .06
Total Service
3.771.06
TOTAL
3,771.06
Page 1
EFTA01118380
01/10/11
1:13 PM
LSJ, LLC
Job Estimates vs. Actuals Detail for 1009 - Main House Expansion
All Transactions
Est. Cost
Service
Main House Expansion
01 Direct Expenses
01.100 - Holiday Allocation
0.00
01-101 - Burden
0.00
01-514 - Phones
1,200.00
01.522 - Temp. Enclosure/Safety
2.500.00
01410 - Material Handling
8,480.00
01.621 -Temp. Protection
1.500.00
Act. Cost
(S) Dill.
9134.71
1,499.34
0.00
0.00
1.382.40
422.17
2,134.71
1,499.34
-1,200.00
-2,500.00
-7,097.60
-1.077.83
01-624 - Construction Cleaning
4,320.00
2.502.24
-1,817.76
01-645 - Expendables
6.000.00
3,090.90
-2,909.10
01.665 - Equipment Rental
4,000.00
492.95
-3,507.05
01.900 - Misc. Expenses
5,000.00
810.99
-4,189.01
Total 01 Direct Expenses
33,000.00
12,335.70
-20,684.30
02 Sitework
02-000 - Inspection-Testing
0.00
0.00
0.00
02-050 • Demolition
15.000.00
5,558.25
-9,441.75
02.150 - Shoring
10.00000
6,245.80
-2.754.40
Total 02 Sitework
25,000.00
11,803.85
-13.196.15
04 Masonry
04-450 - Native Stone Veneer
75,000.00
21.263.13
-53.736.87
Total 04 Masonry
75.000 00
21,263.13
-53.736.87
06 Wood
06-050 - Fasteners - M
8,000.00
1,102.60
-8.897.40
06.100 - Rough Carpentry - L
104,000.00
61.708.39
-42,291.61
06.201 • Interior Trim
9,500.00
8,342.20
-1,157.80
06-400 - Arch. Woodworking
12,000.00
12,983.00
983.00
Total 06 Wood
133,500.00
84.136.19
49.363.81
07 Moisture/Thermal
07412 - Roofing Assembly
204.000.00
178.818.39
-25,181.61
Total 07 Moisture/Thermal
204,000.00
178,818.39
-25,181.61
08 Doors and Windows
08-210 - Wood Doors
84,901.00
97,219.04
12,31904 0
Total 08 Doors and Windows
84,901.00
97.219.04
12,318.04
09 Finishes
09-200 - Plaster
26,000.00
33336.09
7.338.09
09-600-Floor Tile Patch/Repair
11,500.00
8,966.69
-2,533.31
09-920 - Painting
8000 00
18.325.64
10.325.64
Total 09 Finishes
45.500 00
60.628.42
15,128.42
10 Specialties
10-800 - Toilet Accessories
3,000.00
2,636.58
-363.42
Total 10 Specialties
3,000.00
2.836.58
-363.42
12 Furnishings
12-310 - Granite Countertops
9000.00
15,050.28
6,050.28
t-C9
9,000.00
15,050.28
6,050.28
Total 12 Furnishings
15 Mechanical
15-400 - Plumbing
5,000.00
5,118.03
118.03
15-800 - VAC
52,000.00
21,795.43
-30.204.57
Total 15 Mechanical
57,000.00
26.913.46
40,086.54
Page 1
EFTA01118381
01/10/11
1:13 PM
LSJ, LLC
Job Estimates vs. Actuals Detail for 1009 - Main House Expansion
All Transactions
16 Electrical
Est. Cost
Act. Cost
(5) Dirt
16.000 - Electrical
38.000.00
645.50
47.354.50
Total 16 Electrical
38,000.00
645.50
47,354.50
Total Main House Expansion
707,901.00
511,450.54
,196,450.46
Total Service
707,901.00
511,450.54
-196,450.46
TOTAL
707,901.00
511,450.54
-196,450.45
Pag• 2
EFTA01118382
1:22PM
01/10/11
LSJ, LLC
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Main House Expansion
06 Doors and Windows
06410 • Wood Doors
Check
5/6/2010
WIRE
Tom Hoch Designs
2.197.03
Check
5/18/2010
WIRE
Tom Hoch Designs
22.689.50
Check
6/16/2010
WIRE
American Export Company
1.098.50
Check
6/30/2010
MEMO
Island Grounds. Inc. - Timesheet
82.80
Crecal Card Charge
702010
Tropical Shipping Co., Ltd_
20.93
Check
7/14/2010
MEMO
Island Grounds. Inc. - Timesheet
496.80
Check
7/16/2010
WIRE
Tom Hoch Designs
27089.50
Check
7/26/2010
MEMO
Island Grounds. Inc. - Timesheet
165.60
Credit Card Charge
7/27/2010
Classic Engineering
85.00
Check
8/19/2010
Online
Home Depot Credit Services
270.21
Credit Card Charge
9/7/2010
Tropical Shipping Co.. Ltd.
552.50
Check
9/13/2010
MEMO
Island Grounds, Inc. • Timesheet
1,008.00
Check
9/27/2010
MEMO
Island Grounds. Inc. • Timeshooi
2912.00
Check
9/28/2010
WIRE
AM Development. LLC
11,450.50
Credit Card Charge
10/12/2010
Sea Chest
16611
Check
10/13/2010
MEMO
Island Grounds. Inc. - Timesheet
1,797.00
Check
10/25/2010
MEMO
Island Grounds. Inc. - Timesheet
3568.00
Check
10/29/2010
MEMO
Island Grounds. Inc. - Timesheet
1,880.00
Chock
11/3/2010
WIRE
American Export Company
349.24
Check
11/17/2010
MEMO
Island Grounds. Inc. - Timesheet
120.00
Check
11/17/2010
MEMO
Island Grounds, Inc • Timeshoet
2.752.35
Check
11/19/2010
Online
Home Depot Credit Services
588.14
Credit Card Charge
11/23/2010
Tropical Shipping Co.. Ltd.
33.56
Check
11/29/2010
WIRE
A&I Development. LLC
5,725.25
Check
11/29/2010
MEMO
Island Grounds. Inc. - Timesheet
2,535.20
Check
12/14/2010
MEMO
Island Grounds. Inc. - Timesheet
1,488.00
Check
12/17/2010
WIRE
American Export Company
69.66
Check
12/17/2010
WIRE
A&I Development, LLC
5,725.25
Credit Card Charge
12/22/2010
Tropical Shipping Co.. Ltd.
14.44
Check
12/29/2010
MEMO
Island Grounds. Inc. - Timesheet
288.00
Total 08-210 - Wood Doors
97.219.04
Total 08 Doors and Windows
97.219.04
Total Main House Expansion
97,219.04
Total Service
97,219.04
TOTAL
97,219.04
Page 1
EFTA01118383
1:25 PM
LSJ, LLC
ouiom,
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Main House Expansion
09 Finishes
09-200 - Plaster
Check
6/16/2010
MEMO
Island Grounds. Inc. - Timesheet
741.60
Check
6/17/2010
Online
Home Depot Credit Services
674.10
Check
6/30/2010
MEMO
Island Grounds, Inc. Timesheat
8,990.20
Credit Card Charge
7/7/2010
Red HOOk Ace - Construction
22.74
Credit Card Charge
7/2/2010
Red Hook Ace - Construction
-2.13
Credit Card Charge
7/2/2010
Home Depot
465.38
Check
7/6/2910
Online
Home Depot Credit Services
95.74
Check
7/6/2010
Online
Home Depot Credit Services
455.60
Credit Card Charge
7/12/2010
M.S.I. Budding Supplies
130.08
Credit Card Charge
7/12/2010
M.S.I. Budding Supplies
811.04
Credit Card Charge
7/12/2010
M.S.I. Building Supplies
141.80
Credit Card Charge
7/12/2010
M.S.I. Building Supplies
722.40
Credit Card Charge
7/12/2010
M.S.I. Budding Supplies
637.28
Check
7/14/2010
MEMO
Island Grounds. Inc. - Timesheet
3,771.82
Check
8/10/2010
MEMO
Island Grounds, Inc. • Timesheet
245.60
Check
8/19/2010
Online
Home Depot Credit Services
543.87
Check
8/27/2010
MEMO
Island Grounds. Inc. Timesheet
2815.12
Check
9/13/2010
MEMO
Island Grounds. Inc. Timesheet
379.12
Check
9/27/2010
MEMO
Island Grounds. Inc. Timesheet
2.290.00
Check
10/13/2010
MEMO
Island Grounds. Inc. - Timesheet
1,377.36
Credit Card Charge
10/19/2010
M.S.I. Budding Supplies
667.52
Check
10/25/2010
MEMO
Island Grounds. Inc. - Timesheet
160.00
Check
10/29/2010
MEMO
Island Grounds, Inc. • Timesheet
1940.56
Check
11/17/2010
MEMO
Island Grounds. Inc. • Timesheet
2.457.92
Check
11/29/2010
MEMO
Island Grounds, Inc. - Timesheet
2,380.24
Check
12/14/2010
Home Depot Credit Services
332.57
Check
12/14/2010
MEMO
Island Grounds, Inc. - Timesheet
888.56
Total 09-200 • Plaster
33.338.09
Total 09 Finishes
33,336.09
Total Main House Expansion
33,336.09
Total Service
33,336.09
TOTAL
33,338.09
Page 1
EFTA01118384
1:26 PM
LSJ, L LC
mom
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Main House Expansion
09 Finishes
09-920 - Palming
Credit Card Charge
7/2/2010
The Paint Depot
35.10
Credit Card Charge
7/2/2010
The Paint Depot
370.60
Credit Card Charge
8/19/2010
The Paint Depot
740.55
Credit Card Charge
9/17/2010
The Paint Depot
591.30
Credit Card Charge
9/17/2010
The Paint Depot
306.00
Check
9/27/2010
MEMO
Island Grounds. Inc. - Tomesheet
1.245.00
Check
10/13/2010
MEMO
Island Grounds, Inc. • Timesheet
1.880.38
Credit Card Charge
10/19/2010
The Paint Depot
161.22
Check
10/25/2010
MEMO
Island Grounds. Inc. - Timesheet
2,206.00
Check
10/29/2010
MEMO
Wand Grounds, Inc. - Timesheet
1,526.00
Check
11/17/2010
MEMO
Island Grounds. Inc. Timesheet
838.00
Check
11/19/2010
Online
Home Depot Credit Services
247.49
Check
11/29/2010
MEMO
Island Grounds, Inc. Timesheet
812.40
Credit Card Charge
12/9/2010
The Paint Depot
153.00
Credit Card Charge
12/9/2010
The Paint Depot
459.00
Check
12/14/2010
MEMO
Island Grounds. Inc. - Timesheet
3,404.00
Check
1229/2010
MEMO
Island Grounds, Inc. - Timesheet
3,369.60
Total 09-920 - Painting
18,325.64
Total 09 Finishes
18,325.64
Total Main House Expansion
18,325.64
Total Service
18325.64
TOTAL
18,325.64
Page 1
EFTA01118385
1:27 PM
LSJ, LLC
01/10/11
Item Actual Cost Detail
March 12, 1998 through January 22, 2011
Type
Date
Num
Source Name
Amount
Service
Main House Expansion
12 Furnishings
12-310 • Granite Countertops
Check
815/2010
WIRE
VI Granite & Marble
2,812.99
Check
10/12/2010
WIRE
VI Granite & Marble
6,134.52
Check
11/2(2010
WIRE
VI Granite & Marble
2,550.07
Check
12/7/2010
WIRE
VI Granite & Marble
3.552.70
Total 12-310 Granite Countertops
18050.28
Total 12 Furnishings
15,050.28
Total Main House Expansion
Total Service
TOTAL
15,050.28
15,050.28
15,050.28
Page 1
EFTA01118386
2:31 PM
LSJ, LLC
mom
Job Estimates vs. Actuals Detail for 1011 - Main House
All Transactions
Service
Main House
01 General Requirements
Est....
Act. Cost
(6) Diff.
01-100 - Holiday Allocation
0.00
189.54
189.54
01-101 - Burden
0.00
141.88
141.86
01.807 • Professional fees
1.00
9695.35
9,694.35
01.900 - Gen. Office
0.00
20.21
20.21
Total 01 General Requirements
1.00
10.046.96
10,045.96
02 Sitework
02-005 • Layout/Survey
0.00
1,889.12
1.889.12
02-200 - Excavation-SW(1dt
0.00
7,952.00
7.952k0
Total 02 Sitework
0.00
9841.12
9.841.12
03 Concrete
03-130 - Concrete
0.00
750.60
750.60
03-171 - Stairs
0.00
5,80&00
5804.00
Total 03 Concrete
0.00
6.554.60
9554.80
06 Wood
08-100 -Rough Carpentry
0.00
828.00
828.00
Total 06 Wood
0.00
826.00
828.00
09 Finishes
09.510 • Wood Ceilings
0.00
2.19952
2.199.52
09401 - Coral tiles
0.00
41.796.86
41,796.86
Total 09 Finishes
0.00
43.99938
43.996.38
15 Mechanical
15-400 - Plumbing
0.00
100.65
100.65
Total 15 Mechanical
0.00
100.65
100.65
Total Main House
1.00
71.387.71
71,36971
Total Service
1.00
71.367.71
71.386.71
TOTAL
1.00
71,367.71
71,386.71
Page 1
EFTA01118387
01/10/11
2:32 PM
LSJ, LLC
Job Estimates vs. Actuals Detail for 1012 - Island Trails
All Transactions
Service
Island Trails
01 Gen. Requirements
Est. Cost
Act. Cost
(5) Dill.
01-100 - Holiday Allocation
0.00
1,026.71
1,026.71
01.101 • Burden
0.00
744.16
744.16
01410 - Material Handling
1.00
1,032.60
143180
01-621 - Temporary Protection
0.00
429.18
429.18
01824- Construction Cleaning
0.00
718.00
718.00
01-645 - Expendables
0.00
370.81
370.81
01-646 - Small Tools
0.00
1.49325
1.493.25
Total 01 Gen. Requirements
1.00
5.814.71
5.81371
02 - Sitework
02-000- Testing/Inspections
0.00
455.00
455.00
02-005 - Layout
0.00
5,477.41
5.477.41
02-050 - Demolition
0.00
3.156.93
3.156.90
02-112 - Storm Drainage
0.00
0.00
0.00
02-200 - Earthwork
0.00
9.613.56
9.613.56
02-530 - Concrete Paving
0.00
29,789.36
29.789.36
Total 02 - Sitework
0.00
48.492.23
48492.23
03 Concrete
03-111 - Footings
0.00
2.343.84
2143.84
03-130 - Concrete
0.00
19.40746
19.407.46
03-210 - Rebar
0.00
1.08730
1.08710
03-220 - VAVM
0.00
1.200.00
1.200 00
03-301 - Admixtures
0.00
9,236.06
9.236.06
03-350 - Tiki Hut Slab
0.00
5,130.00
5.130.00
Total 03 Concrete
0.00
38.404.66
38.404.66
04 Masonry
04-200 - Unit Masonry
0.00
1.603.04
1.603.04
04-450 - Native Stone Veneer
0.00
101.758.61
101.758.61
Total 04 Masonry
0.00
103.36185
103,361.65
09 Finishes
09-950 - Decorative Painting
0.00
273.60
273.60
Total 09 Finishes
0.00
27380
27360
Total Island Trails
1.00
19614685
196,345.85
Total Service
1.00
196,346.85
196145.85
TOTAL
1.00
196,346.85
196,345.85
Page 1
EFTA01118388
Technical Artifacts (9)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
GPS
1.08730
1.08710GPS
23.00800
20.79780GPS
48.56192
48.56192IPv6
0::Phone
2224200Phone
846.1099Wire Ref
RefinishinWire Ref
WIRE
AmericanWire Ref
WIRE
CreditRelated Documents (6)
Dept. of JusticeAug 22, 2017
15 July 7 2016 - July 17 2016 working progress_Redacted.pdf
Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith Hello Warden Smith, mother is anxious to hear the results of your inquiry into her daughter's health. I'd be grateful if you could email or call me at your earliest convenience. I'm free today after 2 p.m. Alternatively, we could meet after the Prison Board of Inspectors Meeting this coming Thursday. Best wishes, Janet Irons 1 Kristen M. Simkins From: Sent:
1196p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
3p
DOJ Data Set 9OtherUnknown
El WEST PALM RFACH OFFICE'
1p
DOJ Data Set 9OtherUnknown
Columbia Orthopaedic Surgery
17p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02205423
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01945988
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.