ISLAND PROJ€CTS
AS OF 7115111
Task Name
Duration j
Sian
FIC:
I Jule
1 Aug at
0
I
5/29 I 6/5
6/12 I
,
6/19
6/26 I 7/3
1 7/10 1 7/17 1 7/24 1 7/31 I
8/7
1
Flagpcae Pool
99 days
Sun 5/29/11 Wed 10/12/11
7--
2
—_
—
Main House Pool
97 days
Sun 5/29/11 Mon 10110/11
—3 —
Cottage 44
120 days
Sun 5/29/11
Thu 11110/11
Relax Room
46 days
Relax Restroom
60 days
Sun 549/11
Fri meni
Mon 714/11
Fri 9/23/11
4
5—
k
8
7
Paint Desal
40 days
Sun until
Thu 721111
8
Desal Roof Watergredang
20 days
Fri 8/12/11
Thu 9/8/11
9
Mechanical Stewart
40 days
Fri 9/9/11
Thu 11/3/11
10
Decommission Mechanical
25 days
Fri 11/4/11
Thu 12/8/11
11
12
Terrace Wa1
40 days
Sun 5/29/11
Thu 7/21/11
Terrace Sea Wall
30 days
Fri 7/22/11
Thu WWI 1
13
14
Upper Terrace
30 days
Fri 7011
Thu 8/18111
15
Roundabout
30 days
Fri 8119/11
Thu 9/2901
18
Bitskolntersaction Road
30 days
Fri 9/30/11
Thu 11/10/11
17
Flagpole Road
30 days
Fri 10/7/11
Thu 11/17/11
18
Helipad Road
20 days
Fri 11/18/11
Thu 12/15/11
19
20
Frye Palms
85 days
Fri 7/22/11 Thu 11/17/11 i•ia_Ax•
21
Dock Shelters
40 days
Manager's Cottage
60 days
Mon
Fri 11/1801
Vile
Ql i't>‘
/23/ 1
Thu 9/1/ u 9/1/
22
23
24
East Shelter
30 days
Thu 10113/11 Wed 11/23/11
25
Stall Restroom
40 days
Fri 11/11/11
Thu 115112
Heaped Was
20 days
Fri 7/22/11
Thu 8/18/11
V___._
28
27
Top or the HU
70 days
Fri 7129111
Thu 11/3/11
28
1St Kitchen
30 days
Fri 8/19/11
Thu 9/29/11
29
30
Hangar
1 day?
Sun 5/29/11
Sun 5/29/11
Task
•
r
I
Milestone
External Tasks
1
Project: All Jobs Schedule1Sluty11(2)
Dato: Thu 7/28/11
Split
Summary
•
•
External Milestone G
Progress reirriar ee.,
Project
(Malmo
si
Summary
y
V
Papa 1
EFTA01118594
ALL ISLAND PROJECTS
AS OF 7/15/11
Ise
Dmber
J7d1-1,8 ill
8/14 1 8/21 1828 r9 /rnrINTIWn
i
10/0
10116
_Thant*:
10/73 I 10/30 I 11/6
11/13
11/20 1 11/27ece 1 4
2/11
12/18
1 «
O.P0 ,•••••thee•--e-
I
-
•
, 0
y
Project: All Jobs Schedute15July11(2)
Date: Thu 7/28/11
Task
Split
Progress
Milestone
•
Summary
11
.
I
External Tasks
C
External Milestone C:
Deadline
o
Project Summary
•r ---
S;
Page 2
EFTA01118595
Miscellaneous projects assumptions post construction 11/1/2011
These assumed projects results in the personnel assumptions as to the residual staff in place after 11/1
to continue till Jeffrey says stop.
Finish projects on master schedule
Decommission mech.
Manager cottage
Top of hill
New helicopter pad
Tennis court
Roads pave
Roads drainage
Entry paving at dock
Kite house road
Grotto stairs
Shelters
EFTA01118596
‘,..., OCT 192
MAJOR JOBS CONSTRUCTION
-FINISH MAIN COMPOUND •
Relax bath
1.window glass to mirro ORDER
2.vanity solid smooth doors to be painted by ION
3.all walls to be venetian plaster.
Ok
pal hivi-
6
4.shower to be double door,glass inside hidden on outside.ORDER DOOR, ORDER GLASS WHEN
MEASUREABLE
5.IIW In shower
6.mirror over vanity full width,HeIght? ORDER
7.? Big rock between 3 & 4
B.archer 8" off floor 5" floor.
9.paInt shelter oyster bisque
10. measure windows ORDER SHUTTERS
(t74 list* ofAferm,'-ks
PAUL— -era-
-FINISH FLAGPOLE
Cabana
1.flush door to bath ,chrome hinges,chrome passage set ORDER
2. marble In commode area
3.insulate the pump room
4.flush door to kitchen ,double acting hinge
5.mirror door to commode.SEND TO MIRROR
&wail south to info. 24" layout
-FINISH BRICE COTTAGE
HAP6rA boog, comfrad- 2.g<
EFTA01118597
bAedicare.gov - Medicare Eligibility Tool (General Enrollment)
http://www.medicare.gov/MedicattEligibility/home.asOdest=.,.
BURY DUMP
NEW LIBRARY ROOF SCREW
LIBRARY AC ALTERNATIVE
TILE STEPS IN COURTYARD NEED NOSING
LANDSCAPE
ELECT.
PATH TO LIBRARY
MASTER TO MOTOR COURT(CROQUET LITES)
HILLSIDE BOULDERS
3 SWITCH ON TENNIS LITES
N. OF MASTER 3 palms
COURTYARD PALM DOWN LITES
MOUND AT FLAGPOLE ,COCONUTS?
LITES ON OWNNER DRIVE AT BIG WALL
CURB AT FLAGPOLE
ARCHER LITES
PLANTERS ON MAIN HILLSIDE
HILLSIDE LITES
SOD AT MAIN POOL
ENTRY BASKET LITES
LIBRARY PATH PALMS
ENTRY PALM LITES
BLUE BEACH PALMS
FLAGPOLE PALM AND LANDSCAPE LITES
PLANTERS ON MAIN HILL SIDE
FANS AT INFO.
LITE LADY AT WALK TO MASTER
LITE ON BENCH
MOSAIC LITE
DOCK SHELTER 2 LITES
GYM LITES
4 014
II/14/1 I 10:23 AM
EFTA01118598
-5 PALMS REVIEW plans and create spec's
1.ORDER TRUSS after shop's
2.IshMail to propose 15' door
-DOCK SHELTERS /TREX DECK?
-ROAD IMPROVMENTS BASKET TO HELIO.
1. Redo parking pad at building/steps
-NEW EQUIP WAREHOUSE/GARAGE
-TOP OF HILL/ NEW HELICOPTER PAD?
-HANGER
1.revlew plan
2.budget
-TIKI HUT
1.review plan
-GYM
1.review plan
2.budget
MINOR JOBS(CONSTI
WIND DOORS, ORDER
WATERFALL
HELI. WALL
1.sea grapes behind wall
BENCHES
GROTTO
STAFF LOCKER/RESTROOM
EFTA01118599
/0
//
f.
39
f
e,EC--/-
k
F(092 To
•ri c t:ro (miry
_
r - O t.•12--1A f5 c--
CV
(C.
I.
39
X 8
Gr' „Fp oo 9-5
C~sLgal,.
p/o5g boor5
EFTA01118600
lot
• 4". j
N \MP
•
ti. F'.)3, et O.
I 1-5s1A Art t.
Q 91\G )({ tkf, e" •
••
I ( 14* Pc) 1‘.1(14>
IL.OLAZ.
—t)
I,.1 A, er P-1
EFTA01118601
3
.
C'
Cf
c)
:13 zs.
ITT
•
.
( ()fa i
"‘
f)
;
•IN
_
,
,)
Si:
ti
"""
.1'•
-%.1
...0
• A r i
• *JP
-4..
0
6 .4..)
k4
EFTA01118602
0
:4
1
1
-it.,
4-1
so
SNP ••
•
••• VIES ownert
•••••••1111.•
t
EFTA01118603
Manager's Cottage
Revised Conceptual Budget
Gary :
i
JEE:
$171,250.00
18 July 2011
1
Group
Phase
Description
Unit
Price
Shipping Clearance
Toial
01
•
Direct Expenses
01-045
Cut & Patch
80
hrs
:
25.00
0.00
0.00
2.000.00
01-610
Material Handling
60
hrs
20.00
0.00
0.00
1,200.00
01-624
Construction Cleaning
40
hrs
•
20.00
0.00
0.00
800.00
01-636
Punch List
24
hrs
25.00
0.00
0.00
600.00
01-645
Expendables
1
tot
2,500.00
0.00
0.00
2,500.00
,
01-654
Equipment Rental
1
tot
1,500.00
0.00
0.00
1,500.00
01-665
EqtAment Operation
40
hrs
25.00
0.00
0.00
1,000.00
01-900
Misc. Expenses
1
tot
1,000.00
0.00
0.00
1,000.00
Division Total
10,600.00
02
,Sitework
02-050
Demolition
120 hrs
20.00
0.00
0.00
2,400.00
02-281
Pest Control
1
tot
2,000.00
0.00
0.00
2.1000.00
i
iDivIslon Total
4,400.00
03
Concrete
03-055
Drill & Dowel
1
tot
$1,500.00
$0.00
$0.00
$1,500.00
03-130 14000# Concrete
10
cYd
$165.00
$0.00
$0.00
$1,650.00
03-170
Misc. Concrete
1
tot
$2,500.00
$0.00
$0.00
$2,500.00
03-210
Reber
500 lbs
$3.50
$0.00
$0.00
$1,750.00
Division Total
$7,400.00
Wood
06-050
06-100
06-200
06-400
Fasteners
1
tot
$3,000.00
$0.00
$0.00
$3,000.00
Rough Carpentry
1
tot
$25,000.00
tot
$10,000.00
tot
$2,500 00
$0 00
$0.00
$0.00
$27,500.00
Finish Carpentry
Architectural Millwork
1
1
$0.00
$0.00
$10,000.00
$0.00
EFTA01118604
07
Division Total
.-
_
._ f
$40,500.00
Moisture I Thermal
.
07-100
Waterproofing
1
tot
53.500.00
$0.00
$0.00
$3,500.00
07-623
Copper Flashings
200
'ft
$40.00
$1 ,200 00
$500.00
$0.00
$0.00
$8,500.00
07-900
Sealants
1
tot
$0.00
$1,200.00
Division Total
$13,200.00
08
Doors / Windows
08-210
Exterior Wood Doors & Frames
2
ea
$450.00
$0.00
$0.00
$900.00
08-211
Interior Wood Doors & Frames
6
tot
$300.00
$0.00
$0.00
$1,800.00
08-500
Metal Windows
6
ea
$500.00
$450.00
$0.00
$3,450.00
08-710
Finish Hardware
8
ea
$300.00
$0.00
$0.00
$2,400.00
08-810
Mirror Glass
1
allow
$300.00
$0.00
$0.00
$300.00
Division Total
$8,850.00
09
Finishes
09-200
Plaster
3000 sft
$3.00
$1,000.00
$0.00
$10,000.00
09-300
Tile Flooring
700 sft
$5.00
$0.00
$0.00
$3,500.00
09.910
Exterior Painting
1
tot
$2,500.00
$0.00
$0.00
$2,500.00
09-920
Interior Painting
1
tot i $3,000.00
$0.00
$0.00
$3,000.00
Division Total
$19,000.00
10
Specialties
10-700
Hurricane Shutters
1
tot
$7,500.00
$0.00
$0.00
$7,500.00
10-800
Toilet & Bath Accy's
1
tot
$2,500.00
$0.00
$0.00
$2,500.00
Division Total
$10,000.00
11
Specialties
11-451
Kitchen Equipment
1
tot
$5,000.00
$0.00
$0.00
$5,000.00
Division Total
$5,000.00
12
Furnishings
EFTA01118605
12-300
Cabinets
1
tot i
!
tot
$7,000.00
$1,800.00
$0.00
$0.00_
$0.00
$0.00
$7,000.00
$1,800.00
$8,800.00i
12-310
Countertops
Division Total
15
Mechanical
T
15-400
Plumbing
1
sub
$8,000.00
$0.00
$0.00
$8,000.00
15-450
Fixture Allowance
1
allow
S2,500.00i
$0.00
$0.00
$2,500.00
15-600 NC Systems
1
sub
$15,000.00
$0.00
$0.00
$15,000.00
Division Total
$25,500.00
16
Electrical
16-000
Electrical Complete
1
sub
$13,000.00
$0.00
$0.00
$13,000.00
16-510
Fixture Allowance
1
allow
$5,000.00
$0.00
$0.00
$5,000.00
Division Total
$18,000.00
Total
$171,260.00
EFTA01118606
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
baedicare.govPhone
7115111Phone
7129111URL
http://www.medicare.gov/MedicattEligibility/home.asOdestForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.