Capital Improvements
Zorro, 71st Street & LSJ
71st Street
Description of Work
1 Replace 6th Floor Electric Breaker
2 Fire Alarrn Panel Upgrade
3 Server room condenser piping to AC
4 Front Hall entrance lighting
5 Chiller & Cooling Tower Upgrade
6 Skylight Glass Upgrade
LSJ
Vendor
Laredo Electric
Sawyers
AD Winston
Bid # 1 Simply Elegant
Bid # 2 Laredo Electric
Bid # 1AD Winston
Bid # 2 Pierpont Mechanical
Bid # 3Crystal Comfort
Bid # 4' Power Cooling
Suburban Sunrooms
ski
1,742.00
55,780.00
12,514.00
Notes
14,730.00 Complete Bid
6,619.60 Electric Fixture & Labor Only - need scaffolding & painting
Both vendors bidded different light fixtures
357,255.00
330,000.00
219,000.00
60,800.00
Union Bid
RB says bid is missing electrical & protection - Union Bid
Per RB vendor lacked knowlegde / Per Merwyn his contact
has left company - Non Union Bld
Expected by Sep 11th - did walikthrtion 8/31 - Non Union Bid
Replace all glass and exterior aluminum caps on existing
Description of Work
Vendor
Atlanta Refrigeration
Bid # 1
Bid # 2
Bid
Notes
1 Library Chiller
Zorro
158,989.00 'Carrier equipment
198,978.00 Aaon equipment
Description of Work
Vendor
PLd
Notes
1 Replace limestone on terraces with concrete 3B's
35,450.00
2 Installation of 60 mil membrane
3B's
10,000.00
3 Stucco repairs
3B's
??
lime and materials basis - labor @ $100 per hour
4 Telephone System
Brice Bidding Work
need more data to complete
5 Telephone System
Bruce - Panasonic
27,306.25 Panasonic KXTDE 100 Converged IP-PBX System
29,615.09 Panasonic KXNCP 1000 Pure IP System
6 Telephone System
Richard Boltz
84,331.00 Did not include Main House phones
7 Remove Ponderosa pines at fron entrance
Aspen Landscaping
3,625.25 Hourly rate $25 / 136 hours - Brice plans to 9/6
8 Remove Vegetation from rear flower beds
Aspen Landscaping
3,731.88 Hourly rate $25 / 140 hours - Brice plans to 9/6
9 Wells
HGS
42,436.75
Brice to update
Well #1 - 25k paid to date
10 Rich Bamett Mechanical Inspection
HGS
99,121.00 projected cost - billed 64,370
bids pending - see outline and RB report under separate email
EFTA01118801
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
RefrigerationForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.