8.3 Tax Controversies. The Golden Gate Majority Member is hereby designatedTanique Lee, Criminal Law, Civil Law, Motion Drafting, Negotiations and Litigations
Case File
efta-efta01120035DOJ Data Set 9OtherAug 13 12 11:35a
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01120035
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Aug 13 12 11:35a
HGS - Bill W. Whaley
Fax
OC.,'
ea.Aragic Son,/-ce s
X
(.1
Bill W. Whaley. C.P.G
Hydro4eologist, Vice President
To:
Brice— Cypress. Inc
Front
Bill VI Vshaley
Phone:
Pages:
2
Fats
8/13/2012
Re;
CC:
O Urgent
21 For Review
a Please Comment
CI:lease Reply
O Please Recycle
Sincerely,
Bill lhr. Whaley, C.P.G.
Hydrogeologist
Vice President
HydroCeoiogic Services. In
P.O. Box 94716
Athurqueroue, NM 87199- /16
Fax
NM License No. WD-147:'
P.O. Box 94714 Albuquerque, NM 87199-4716 ".
New Mexico License No. WD-1472
We Do Water We.11
Fax
EFTA01120035
Aug 13 12 11:36a
HGS - Bill W. Whaley
p.2
REQUEST FORBIDS
CYPRESS, INC.
FR(11/UCTION WELL (6-INCH CASING)
The bidder hereby proposes to furnish all oquipment, material anti labor, and to do all the work required
to complete the work in accordance with recifications for the unit prices, lump sum, or howdy rates set
forth below and in the attachments If rir ded, attach additional pages to provide further detail on bid
items.
Item
Estim...e.1 Quantity
1
Mobilization,
Demobilization and
Clean-L. p
2
Install Cemented Surface
Casing to Minimum 40
Foot Depth
3
Drill Minimum 10 %-inch
Hole
Units
Peet
4
Furnish and Instill 6-
inch Inside Diameter
Blank PVC Casing
403
Feet
5 Furnish and install6-
inch Inside Diameter
PVC Screen
6
Furnish and Install
Pldess Adapter
7
Furnish and Install
Formation Stabilizer
8
Furnish and Install
Annular Seals and
Bacicfill
9
Well Development
10 Well Testing
11 Wellhead Seal and
Protection
12 Stand-Ry Time
" 413 Furnish and Install
Permanent Pump and
Controls
4-'20 HP/100 GPM pump pat © 504' on 2
gaN. drop pipe
w/oonata panel
400
1
1
16
24
8
1
OWNOMACIlsorabUDO
grwr
Feet
Each
Each
Hours
I lours
Each
Hours
Each
Total
Unit Prior
- Total Price
4.294-Q1 S22.21
3700.
7ti 600 OD
16.00
6.400.00
20.00
8.000.00
4E50.00
4.650.00
11.950.00
11 950.00
01/0,
,As.c 7,4 Ft brava")
4.500 00
4 500.00
400 00
6.400.00
210.00
5,040.00
815 00
815.00
250.00
2 000.00
21246,00
21 246 00
t t'SR-2-14,
110,9S6.0C
AydroGeo:ogic Services, Inc.
NM License No. WD-1472
EFTA01120036
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.