Skip to main content
Skip to content
Case File
efta-efta01120863DOJ Data Set 9Other

Sept.9

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01120863
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Sept.9 Flagpole Cabana paint color is the same as main compound white Inside white same shade as primer Commode space ,prepare for Ion to paint Outside color, same as main compound exterior plaster Alley walls to be painted brown to match stone(gary to pick sample for Jeffrey to approve) Road alignment ok, proceed to dry stack wall Parking pad coral Small curb along N. side to parking pad to info center(after landscape) Mound east of building(gary to stake ) Door to kitchen redo. Design a door to sides,lattice design Raise walls Raise heaher to shower to grout line(gary point out) Install corner sconces Install vanity lites and mirror(copy master vanity) Move ac condenser No shower door Wall slots behind board (on hold) Rehang door to kitchen,flush to living room and double acting Main compound Cottage 3 shower wall raise to crown,no wing wall in #4 and no handrail from 3 to 4. Shower to shelter(gary to locate.) EFTA01120863 Extend E.&W. overhang to 5' Relocate walls (gary to paint) Locate archer Tom draw 5'x5'x12" plan(gary to locate)gary m. to lite Paint out parking pad Stairs to parking pad 24" opening to parking pad Banquett all coral,no blue tile Take off blue tile on steps to great room replace with coral Full length stairs on main terrace (gary m. & gary determine liting) Terrace deck copy existing deck,border and diagonal Lil. Bath shower is coral,diagonal shower floor No wainscoat Coconuts at end of pool 7' n & s 10' east. Big lites ?coral surround Platform east of road by sea Motor court Walls proceed,east/west continue height,(gary to mark library height,north/south wall on hold. Shane doing mosaic for review Mark out East end col's and wall Paving color concrete with saw cuts diagonal per intersection sample Lighting attach extension cords to 100w,150w and 2 400w lamps mock up on courtyard palms,flag palms,entry basket,wall at jeff drive EFTA01120864 lite two palms at owner drive at dock install tennis lites(paint first) Landscape Order 20 coconuts Natural thicket at flag triangle ITT. Terrace slope/order sod at main house Trail to info. Center Curb wall sample Hide corner of cottage 3 Pop's garden wall and path Basket enhancement EFTA01120865

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.