Skip to main content
Skip to content
Case File
efta-efta01121735DOJ Data Set 9Other

ALLIED STEEL

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01121735
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
ALLIED STEEL BUILDINGS PROJECT/ NUMBER St Thomas-0074385-317 DATE O8/13/2O13 PROJECT LOCATION St Thomas, USVI City/ Country CONTACT INFORMATION Daphne Wallace BUILDING CODES Wind 155 Ground Snow 0 Live Load Seismic Value 120% Occupancy Normal 2009 IBC E> Li D Soil Class 20 Collateral Loac 2 40% SECONDARY FRAMING LEW REV/ FSW BSW ROOF EXTERIOR Zee ELLIS, I Zee Zee Zee Zee ENDWALL TYPE POST t. BEAM RIGID FRAME RIGID FRAME EXPANDABLE LEW REW ENDWALL COLUMN SPACING LEY. REV, Per Design Per Design THIS PROPOSAL IS MADE EXCLUSIVELY FOR BUILDING SPECS vim, 120' 110' Eave H. 30' Roof Pitch 1/12 Roof Type Gable ROOF PANEL PBR Xi Standing Seam N/A OTHER GAUGE 24 FRAME TYPE 1:1 X X SIDEWALLBAYSPACING Per Design MODULE SPACING Clear Span Interior Support Columns Column Spacing BRACING X.BRACE RIGID FRAME PORTAL FRAME OTHER LEW REW )< FSW X BSW X X COLORS WALL PANEL X PBR GAUGE 26 Allied Architectural N/A OTHER ACCESSORIES 2 (3070) 1(100'x27'11') TBD ..fs&Dovmspoots X 101 NE 3rd AVE FORT LAUDERDALE. FLORIDA 333011 7:877.997.8335 I F:877-997.8336 I www.AlliedBuildingscom EFTA01121735 i/x ALLIED STEEL BUILDINGS PROJECT / NUMBER DATE 08/13/2013 ) (St Thomas-0074385-317 THE ALLIED DIFFERENCE - In house engineering & design services - Allied has provided dozens of buildings throughout the Caribbean and Latin America - Allied coordinates freight for our customers across the globe - Building supplier for Shell oil, NASA Walt Disney World, & Barrick Gold Corp among others. PROJECT NOTES Hangar is designed with wind exposure "D" ADDITIONAL ACCESSORIES NOTES / OPTIONS Note: Price includes preliminary drawings and stamped certified drawings Note: Preliminary drawings will be sent within 48/72 hours for review Note: Complete trim package included Note: Design includes pre-galvanized secondary Note: All necessary purlins, girts, nuts, bolts, & self drilling screws are included Note: Price includes freight to port in St Thomas USVI PRICING Price Freight TOTAL Engineering Payment Fabrication Payment Balance $250.508.00 Included $250.9)8.00 $40.000.00 $137.000.00 $73.000.00 Gut to the volatlay n steel and fuel one% Pricing isvard f cr 14 thyi. ”Tax. if applkable. is not irchriod. BALANCE [COD) US FUNDS ONLY. PRIOR TO UNLOADING BYCASHIERS OR CERTIFIED CHECK ONLY. CHECKS MADE PAYABLE TO ALLIED STEEL BUILDINGS INC. Buyeragrees to pay the balance of the carmine price by money order orcertified check upon delivery°, the pwchased goods and acknowledges receipt of a compkted copy of this purchase order.All out-of-coMMentalUS deliveries must be paid in full poor to loading a COO is not available. Under no circumstances is cash to be paid to the driver for balances owed on this building. The purchase order by Buyer above named to Seller shall constitute an agreement binding upon Setkr onry when accepted in wiling by Seller's authorized representative.BUYER IS RESPONSIBLE FOR ALL APPLICABLE SALES TAX.BROKER FEES. AND DESTINATION CHARGES, The Project Manager ci Seller preparing this purchase order isnot an officer of Seller and not authorized to accept this order of Buyer. Upon receipt of this order at the !weeofficeof Selkr. if the order is accepted the 'Acceptance copy will be returned to Buyer.dulysigned by an Authorized Reprelentatiye.ce if not accepted.the initial payment shall be tenoned to Buyer. Upon acceptance. Buyer shall not be entitled to a refund of the whole or any part of the initial payment tendered to the Project Manager of Seller. Unless delay is the result of Allied causes...ler...try after the requested delherydatewill necessitate that any increases in the cost of seed. materials cc f reedit will be passed alto ewer. Buyer will receive immediate knowledge of the cost increase through a Change Order reflecting the new price as tom as same is received by Selkr. At that time.Burer can then agree to the Mcrease by signing the Change order or cancel the contract: but Buyer will be liabk for al work performed and parts ordered up to the date of the cancellation. THISORDER ISSUBJECT TO THE TERMS ANDCONCHTIONSON THE FACE AND ATTACHEDDGCUMENTS.Buyer hereby acknowledges receipt of a complete copy of this agreement and agrees to all the terms herein contained and asset forth is the Terra and Corditicos. Buyer Date Representative Date Authorized Representative Date 101 NE arc AVE FORT LAUDERDALE. FLORIDA 333011 1.877-997 8335 F.877-997 EFTA01121736

Technical Artifacts (4)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone1.877-997 8335
Phone877-997.8336
Phone877.997.8335
Wire Refreflecting

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.