Skip to main content
Skip to content
Case File
efta-efta01122843DOJ Data Set 9Other

Task List 12-23-2010

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01122843
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Task List 12-23-2010 71st Street ( Request from Jeffrey ) Upgrade wireless network to Apple Based wireless Network and give coverage to the whole property. Set up and Build a Server Environment so Jeffrey can Sync all of his Macs Worldwide Set up a cell network booster so Jeffrey, his Staff, and Guests can have better cell phone reception. Resolve the issues with printing for property. All this must be done while maintaining the current Cisco, Citrix, locked down authentication paths. Deadline is Jeffrey's Return to 71st Jan 3rd, 2011 LSJ The current network design does not give Jeffrey's Office Bandwith Priority so he is getting network Connection issues, Solution: The office needs a server and a zero config switch which is self contained on its own subnet To do this both office locations on the Island need to be controlled by a master OSX server box connect to an Asante switch ( a zero config sub switch ) this will give Jeffrey a Platform for a more reliable connection, a move secure connection, and will allow to set up a back up network through a cell connection. This was already tested when power and internet went down I was able to provide data services through my cell phone and macbook air. Multiple Requests where made for hardware and software functionality for staff and crew. Jeffrey needs his imac upgraded from 10.5.8. to 10.6.5 EFTA01122843

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.