Zorro Development Corp - Project Report 9/2/13
21 - MICROWAVE &
' START
END
EST.COST
NOTES
PHOTO
STATOin
a
I
4/27/13 — JE requested to investigate Microwave option
Awaiting
519/13 — Existing Microwave details forwarded to JE, RK & JR
Proposal
5/16/13 — JE requested contacting Dava Baumann reference
RMC
delivery of service from Sandia Crest verses D Mark
5/17/13 — Dava Baumann forwarded details of RSM — Craig
Franck. Brice has been in contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded TW Telecom proposal for Delivery of Service
to JE & RK Firm bids due 6/14/13
6/14/13 — Received bid from Southwestern Wireless confirming
details. Informed JE, will forward once all details confirmed
6/20/13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 — Southwestern Wireless unable to deliver bundled T1
6128/13 — Looking into other options
7/12/13 —Awaiting proposal from Advanced Communcations
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 — Conference call completed with RK, BG, SD & RB
8/17/13 — Advanced Communcations on site to review Project JE
8/18/13 — Confirming Advanced Communcations require Service
Provider before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Link
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 - Received Proposal from RMC for x 3 40ft poles, will
review & forward
Page 1
EFTA01124687
Zorro Development Corp - Project Report 9/2/13
rir- LANDSCAPING
START '
END
EST.COST
NOTES
PHOTO
STATUS
MB
06/01/13
T $75.000.00 3/28/13 — Refurbishment & Mainteance Proposals from 3
AwatUng
Direction
companies forwarded to RK & DI
4/27/13 — JE approved Aspen for Refurbishment Project & Aspen
to remain as ZDC Mainteance Company
5/9/13 — New Proposal forwarded to JE, RK awaiting direction
5/16/13 — Final proposal forwarded to RK
5/24/13 — Aspen agreed to $75,000.00
5/31/13 — Deposit of $44,383.08 issued to Aspen
46/1/13 — Project Started
6/8/13 —Work continues, sa preperation in progess
6/14/13 — Plant material starting to arrive
6/18/13 — More plant materail on site
6/21/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
6/26/13 — More_plant material on site
6/27/13 — Preparation of front parking area begins, Columbines
& Trumped Vine planted along pathway between MH & Dog Pen
Irrigation installed in all planted areas — attached photos
7/12/13 — Plant & I "i : C. installation continues —
Attached plant schedule & photos
7/26/13 — ProLct 90% Complete _
Having issues locating Cypress Trees.
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 Hawthorns & replace with 4 Blue Spruce
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
8/11/13 — JE updated earlier request — remove 5 Hawthorns &
-I
add 7 Blue Spruce
8/22/13 — Forwarded to JE suggested colourful plant material,
selected for discussed areas — awaiting direction
Page 2
EFTA01124688
Zorro Development Corp - Project Report 9/2/13
22A - LANDSCAPE ----m, START ,
END
EST.COST
NOTES
PHOTO
STATUS
LIGHTING
4/27/13 —JE Approved New Landscape Lighting
Pending
5/1/13 — Unable to move forward until Project 22 — Landscaping
Completion
has been resolved
Project 22
6/1/13 — Reviewing with Aspen about plant location
7/18/13 — Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landscaping
MH Complete
IN HOUSE -
START
END
EST.COST
NOTES
pHaro
STATUS
LANDSCAPING
06/03/13
4/27/13 — JE Approved, removal of dead Pine in courtyard,
Awaiting
removal of Ponderosa Pines, Landscape Lighting at front
Proposals
Enterance & to relocate Pinons to the area
613113 — Project Started
6/18/13 — Removal of Pine & Ponderosa Pine complete -
attached photos
7/19/13 — Relocation/installation of Pinons from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Complete
8/30/13 — Awaiting Proposals from Aspen & 2 other vendors
due by 9/6/13
Page 3
EFTA01124689
Lorro uevelopment Corp - rroject Kepon V/L/1.5
24 - MEDIA ROOM
, START '
ENQ
EST.COST
NOTES
PHOTO
STATUS
CURTAINS
Blackout & Rings
$6,262.08 4/27/13 —JE Selected Fabric for Project
Awaiting
Direction
5/10/13 — Project Request Form forwarded to JE & RK
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 —Awaiting Direction
25 — omcg
START
gND
EST.COST
NOTES
PHOTO
STATUS
CURTAINS
Lined & Rings
$2,527.01 4/27/13 — JE Selected Fabric for Project
Awaiting
5/2/13 — Vendors & Manufacturer enable to provide enough
Direction
yardage of selected fabric
5/9/13 — Another fabric option forwarded to JE
5/10/13 — Project Request Form forwarded to JE & RK
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — Awaiting Direction
Page 4
EFTA01124690
Zorro Development Corp - Project Report 9/2/13
V -TERRACE
STAR'
- - -
'
END
EST.COST - -
NOTES
PHOTO
STATUS
Terraces - $52,000.00
04/07/13
07/03/13
$56,200.00 12/12/12 — Bid received.
Change
Stucco/Gutters/Painting
3/20/13 —JE Approved Bid
Order
$4,200.00
4/7/13 — Project Started
Outstanding
4/20/13 — Libary Membrane installed
to Vendor
5/10/13 — Change Order Submitted by Vendor $2,700.00 + tax
$2,700 + tax
5/16/13 — MBR Balustrade reinstalled
5/20/13 — MBR Membrane to be installed
5/31/13 — There was a fault in 1 roll of material, vendor has
reordered, will recover area once on site
6/7/13 — Material on site
6/14/13 — Membranes & Gutters Complete — attached photos
6/18/13 — Stucco & Painting due to start
6/21/13 — Stucco & Painting Complete — attached photos
6/24/13 — Final review on completed work with Vendor
7/2/13 — Final Punch Out to begin of all outstanding work
7/3/13 — Project Complete
8/8/13 — JE requested carpet to be installed on both terraces
8/9/13 — Carpet samples forwarded to JE
8/17/13 — JE selected carpet 1 selection on back order
8/19/13 — 3 B's to meet with JE to review Project
9/3113 — 3 B's on site to Water Test MBR Terrace
29 — REPAIR
PART
gm
cstcosT
NOTES
PHOTO
STATUS
POOL/SPA
$12,600.00 5/9/13 — Vendor on site
5/16/13 — Bid breakdown forwarded to RK
6/10/13 — JE requested that work be started in Sept 2013
8/20/13 — JE requested that 3 B's submit a bid for Project
9/3/13 — 3 B's on site to review Project
Page 5
EFTA01124691
Corp
orro ue
- veiopment orp - rroject Report wzii -.3
-
30- FRONT GATE
- -
START
ENQ - EST.COSL
NOTES
PHOTO
STATUS
OPENERS
Call Boxes/Loops
07/25/13
$10,125.00
4/20/13 — Bid received, requested vendor to make adjustments
Gate Loops
+ tax
5/9/13 — Received Revised bid. Options & Equipment reviewed
not
5/12/13 — Options & Equipment selected
Installed
5/21/13 — Final bid faxed, unreadable, vendor will resend
6/8/13 — Final bid attached with Project Report
6/11/13 — RK requested material breakdown
6/14/13 — Material breakdown forwarded to RK
6/19/13 - Resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate. Have
contacted 3 B's, they will be on site next week to review
r
7/9/13 — RK neogiated 3 B's bid
7/11/13 — 3 B's Bid &proved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad
for Gate 2 faulty, vendor has reordered — attachedihotos
8/10/13 — Waiting for installation of loops & Gate 2 Key Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operate gates
8/30/13 — Contacted RMC regarding phones & gate controllers
will be on site next week
9/2/13 — As of date Gate Loops Not Installed
9/3/13 — 3 B's on site to review Project
Page 6
EFTA01124692
Zorro Development Corp - Project Report 9/2/13
31 - PHONES MAIN
I START
END
EST. COST
NOTES
PHOTO
liOuSt
STATUS
07/17/13
41/27/13 — JE approved installation of new phones at MH
Awaiting
Awaiting for Service Provision & Estimated Cost of Delivery of
Services from Prod 21 — Microwave & IT before moving forward
6/22/13 —Awaiting response from Southwestern Wireless on
FCC License Application & Router at MH
7/17/13 — Project Started
7/25/13 — Switch & 16 Phones Installed, awaiting delivery date
remainder of phones — attached photos
9/6/13 — Phones due to be deliveried to Vendor
Delivery of
Phones
32- PHONES RANCH I START
CENTRAL
eST.COST
NOTES
PHOTO
6/21/13 - Will forward proposal for Phone System by 6/28/13
6/27/13 - Project On Hold until Microwave Solution resolved
STATUS
Project
On Hold
Page 7
EFTA01124693
Zorro Development Corp - Project Report 9/2/13
33 - POOL PAC
_
.
START
END
______
EST.coaT
NOTES
PHOTO
STATUS
Engineering Inspection
— !-4/29/13 - Quote forwarded to RK, who requested more detail
$9,100.00
5/8/13 — Revised quote forwarded to RK, awaiting direction
5/22/13 — Beaudin Ganze on site to review Project
Unit Cost
5/29/13 — Beaudin Ganze report forwarded to JE & RK
$43,170.00
5/29/13 — JE Approved inveslgation via camera
6/3/13 — JBH forwarded estimate
Camera Duct Inspection
6/4/13 — JE Approved moving ahead
$1,214.91
6/11/13 — JBH due on site
6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8/22/13 — Contacted Dessert Air & forwrded info regarding
existing space & equipment design
9/18/13 - Site visit Dessert Air to confirm their proposed
solution
34 — REPAIR & PAINT
$TART
ebff2
gST.COST
NOTES
PHOTO
STATUS
WORK — ION
5/7/13 — E Mailed Photos to JE showing work required
5/23/13 — Forwarded all work details to Ion, including work that
will be required after MBR Terrace is completed
6/29/13 — Additional work — Sign on Adobe,IIIII.Office Wall
Page 8
EFTA01124694
Zorro Development Corp- Project Report 9/2/13
i35 - KITCHEN TABLE i START
END
EST.COST
,
NOTES
PHOTO
STATUS
ELECTRICAL
,
06/03/13
3/1/13 — Bid Received — Lead Time 1 Week
6/3/13 — Project Started
6/7/13 — Under floor conduit due to be completed 6/12/13
6/13/13 — Conduit Installed, tiles replaced & grouted. Cat 5 still to
be pulled & punched down — attached photos
7/22/13 — Cat 5 pulled & punched down
—
Pluggingy Hole
$15,000.00 Estimate to Plug 1 st Hole
38 - SEPTIC SYSTEM
START
END,
EST.COST
NOTES
PHOTO
STATUS
ADOBE
07/10/13
7/9/13 — E Mail forwarded to RK — Adobe Septic System is
blocked. ZDC unable to clear line
7/10/13 — Bassett Construction on site to review system, inspect
lines with camera. Found compressed One under the Adobe
outside deck. Work Completed at $533.04
7/11/13 — ZDC will remove pavers after visit, Bassett Construction
will complete repair & ZDC will reconstruct deck area — attached
photos
8/9/13 — Received Estimate from Bassett Construction to
replace main sewer line, install new cleanouts & PVC pipe
$3,740.63
8/20/13 — Forwarded bid to JE
8/22113 — JE request that 3 En submit bid
9/3/13 — 3 B's on site to review Project
Page 9
EFTA01124695
Zorro Development Corp - Project Report 9/2/13
2.2=
START
END
EST.COST
NOTES
PHOTO
STATUS
REFURBISHMENT
ROADS CULVERTS
7/27/13 — Will review with JE on site, refurbishment of all Roads &
Culverts
8/5/13 — Road Base 23 tons $360, Culvert 4ft x 24ft - $1381.85
Culvert 5ft x 24ft - $1,727.24
40 - LANDSCAPING
START
OD
fST.COST
NOTES
PHOTO
STATUS
LOG & LODGE
Removal of Dead Trees, Cover Rocks with Soil
41=
START
gm
EST.COST
NOTES
PHOTO
STATUS
REFURBISHMENT
HOME THEATER
8/13/13 — JE requested replacement of exisiting Sony Projector
On Hold
I8/15/13 —3 Vendors on site — Proposals due next week
8/22/13 — JE forwarded 2 Proposals
8/25/13 — Received 3rd Proposal
JE requested Project On Hold as new Projector to be released
Dec 2013
i4k-
REFURBISHMENT
START
EIIQ
EST.COST
NOTES
PHOTO
STATUS
EXTERIOR - LV
$10,100 + tax 8/22/13 - JE Approved Project
3 B's to complete MH. ZDC to complete Garage
IN HOUSE
START
END
EST,COST
NOTES
PHOTO
STATUS
REFURBISHMENT
LANDSCAPING — LV
8/22/13 — JE Approved Project
Awaiting
Direction
Cover Rock with soil, Pinion installation
r--8/22/13 — Forwarded JE suggested colourful plant material
for discussed areas - awaiting direction
Page 10
EFTA01124696
Zorro Development Corp - Project Report 9/2/13
PQRCHA,ES
START
END
EST.COST
NOTES
STATUS
Heavy Machinery
8/22/13 - JE requested investigattg a Bulldozer purchase & any
_PHOTO
other equipment ZDC may require
8/27/13 — Investigating avaiable equipment
9/3/13 — Investigating trading exisiting Bobcat for new
Outside Furniture —
Lodge
8/22/13 — JE agreed new outside furniture required, will relocate
exiitng table & benches from Shooting Range to uncovered back
deck
9/1/13 — Will investigate funiture options for covered back deck
ZDC
JN HOUSE WORK
END
EST.COST
CACTUS REMOVAL
START
NOTES
pHoTo,
STATUS
To begin Early Fall
S ED AT
• 3g
START
M
j EST-COST
NOT
PHOTO
SIATUS
Reskin, Paint & Seal—work to begin in the Fall
LQPGE ROOF
START
MR
EST.COST
NOTES
c PHA
STATUS_
Repair/Replace Broken Sections - work to begin in the Fall
,
STATUS
r
PHOTO
In
Nala
MIStian
Kin
8/22/13 — JE Approved reconstruction of exisitng furniture to
-i
make items more resilient to mice attack
FUEL STORAGE
START
END
EST.COST
NOTES
9HOTQ
STATUS
ARC
8/18/13 — Additional New Tank Installed
Repainting of tanks, matting & gravel installation to begin
in the Fall
Page 11
EFTA01124697
Zorro Development Co
- Project Report 9/2/13
GRAVEL/EDGES RC
START
END
EST.cOST
NOTES
PHOTO
STATUS
PATHS
All paths to be dug out, edged and gravel installed to begin early
early Summer 2014
JOG CABIN STEPS
START
END
gST.COST
N9TE,
PRoTS.
,STATUS
New Section to be refabricated
CATTLEGATES1
START
SID
EST.COST
NOTES
PHOTO
STATUS
GUARDS )( 3
Refurbishment, Empty & Paint
PAINTING/STAINING/
START
END
gST.COST
NOTES
PHOTO
STATUS
SEALING
RC Office Interior
Repainting to be completed over the Fall
Reservior
Repainting to be completed over the Fall
RC Mech Bays/Garages
Painting to be completed over the Winter
Firehouse Interior
Painting to be completed over the Winter
Stables
7/8/13 — Inside/Outside Lights repainted
Inside resurfacing, painting, staining, concrete floors
to be completed over the Winter
Resealing outside to begin Early Summer 2014
Adobe, Log & Lodge
Resealing of outside & deck refurbishment to begin early
Summer 2014
Page 12
EFTA01124698
rro Deve o
9/2/13
WELLS
DAKOTA & K
Combined Usage As of
9/2/13
15.18 afa
;014.Budget
EtwiltbRin
Window/Door — Total Replacement
Page 13
EFTA01124699
Technical Artifacts (6)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Tail #
N9TEWire Ref
REFURBISHMENTWire Ref
RefurbishmentWire Ref
refabricatedWire Ref
referenceWire Ref
refurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.