MO 5507/7/7
VIP Priorities:
• MC Gazebos sylvester
• MC Service gates w/10ft Colums (danny plus carpenter) it
• All service gates. New wood needed (Tunnel, Engineering & Heli)
• Jeffers roads
— D
am—
• Five palms bid & Franks electric? ..,
• Flagpole bid?
• Engineering doors P.0
• Steel buildings ,
• Paul Gandy cables swithces trench bid
• ro trench
• cement for hell gsj? .
• pebble beach seocnnd floor,
• grotto. .
• gym. floors. layout.
• Internet. etc.
• gsj dock house. ce,
• jet ski docks. .
• trees.?
See page 2
6/9/2019 8:30am White Table Notes
CONFIDENTIAL
SDNY_GM_00332640
EFTA 00205366
EFTA01309340
Little Saint James
CONFIDENTIAL
SDNYGM_00332641
EFTA_00205367
EFTA01309341
6/9/2019 8:30am White Table Notes
-Do not install GYM Doors
-Sylvester & Maurice to find help if needed
-Five Palms Completion date needed 7:30am 6/10/19 j
-Danny MC Columns for New Driveway. Gates should look like flagpole pool side
gate.
-Gerry will do all Trash Runs at 3pm going forward everyday
-Anna to call Jeffers asap (Need answers 6/10/2019)
-What are black tubing on RIO Bld. (Need answers 7:30am 6/10/2019)
-Engineering Doors (Need answers 6/10/2019)
-Hire Outside Contractors for Big Projects & Building
-Pictures needed of every project from start to finish
-Phil arriving end of June
-Tiki Kitchen Counter top (Find local vendor for purchase) Conan
-Order Fly bags
-Close all Cabana doors if no guests. Cabana doors with "No view" should stay
closed
-Install Washers & Dryers in housekeeping first thing 7:30am 6/10/19
-Fix Master Bedroom Steam shower
-7:45am Michael & Jules 6/10/2019
-Michael first thing in the morning 6/10/19 cans for
at GSJ Helipad.
-Bubbler (Barge) 4 Cement trucks from HM for GSJ Helipad
-Trenching Bid needed asap (Time Sensitive)
-Jules to work at Grotto
-Order Heavy Duty Wall bracket to hold 82" Samsung TV
-Dupson to spray Main Compound (Caterpillar infestation)
CONFIDENTIAL
SDNY_GM_00332642
EFTA_00205368
EFTA01309342
VIP Priorities:
MC Gazbos....syNestet
MC Service gates w/10ft Colums (danny plus carpenter)
All service gates. New wood needed (Tunnel, Engineering & Hell)
Jeffers roads
Five palms bid & Franks electric?
Flagpole bid?
Engineering doors .
Steel buildings ,
Paul Gandy cables swithces trench bid
A it
ro trench
cement for heli gsj? .
pebble beach seocnnd floor,
grotto..
gym. floors. layout. .
internet. etc.
gsj dock house.
jet ski docks..
trees.?
<-1
lot)
CONFIDENTIAL
SONv_GM_003326.43
EFTA_00205369
EFTA01309343
New LSJ-GSJ Mandatory Punchlist 5-17-19
2
3
4
smartsheet
an MANDATORY
LSJ/GSJ Punchlist
Put:basing, Shipments & Visiting Vendors
SDNY_GM_00332644
Mold Remediation Schedule: Mobilize equipment to Tropical FL 615, sail
1
LSJ/GSJ
Daphne & Anna
Seth Ettinger - Restore
& More LLC
6/7 - EDA on SIT 6/11. Clear, pickup equipment 6/12 - Seth and crew
(2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Mike's
Room, 2. Living Room, 3. Office,4. Twin Bedroom. 5. Master Bedroom.
_J
2
LSJ MC Kitchen
Karyna & JE
Banquette
(2) areas on LSJ 7. Kitchen 2. Theater. Should be added - 3. Gym.
Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas.
1--
3
Master Bedroom
Karyna
JE Pillow
Should know more after our trip on June 3rd.
4
Emergency Room
Anna & J E
EKG Machine
Order EKG Machine. JE to advise.
5
Theater Room
Anna & JE
Blackout Curtains
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, Including the door openings. Awaiting quote
from TJ "Home Theater Marker' for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
6
Housekeeping
Anna
Washers
4 Panels of 11ft Sin Long (135in), AJI 12 Panels are 4ft Wide (48in).WII
need 16 Panels in Black wlBlackout backing (5130).
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
O
7
Housekeeping
Anna
Dryers
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded. awaiting
pickup for transport to LSJ.
0
8
Gym
Anna
Flooded
Gym flooded on 5/30. all equipment moved to R/0 Storage on 5/30.
Floor removal began 5/31/2019.
9
Sam's Place
Anna
Furniture
Order Living room furniture & Kitchen Table
10
LSJ/GSJ
Anna & Daphne
Solar Lights
Solar lights from China - departed from China 5/21 - 45 days to MA -
EDA FL 7/3.
11
LSJ/GSJ
Anna & Daphne
Sun Umbrellas
Order 15 Cream Colored Sun Umbrellas. JE will choose.
12
Theater Room
Anna & Daphne
Drapes/Curtains
Wrinkle out the Drapes/ Curtains in the Theater
13
LSJ Salt Pond
Anna
Fountain Light
Order lighting for the Saltpond water fountain. Arnving to the Palm
Beach house on 5/30. Arriving on plane 6/3
14
LSJ Helipad
Anna
Medical Kit
Purchase Medical items for Helipad Office
15
Chillax Room
Anna
Chillax
Deep Clean Chillax room. Smells funny
Exported on Juno 9.2019 9 33 34 PM BOT
Paw. 1 oi 18
EFTA_00205370
EFTA01309344
Intt!aUca) Date
Order Date
Projected Arrval sty: Date
Ten
Cemple.tor
Dote
Coraplet'on Date Dale
5/6/2019
5/17/2019
5117/2020
5/17/2021
6/1212019
6/13/2019
5/17/2022
5117/2019
5/17/2019
5/28/2019
5/17/2019
5/17/2019
928/2019
5/21/2019
5/17/2019
12/13/2018
12/20/2018
7/27/2019
5/17/2019
6/5/2019
5/25/2019
5/16/2020
5/23/2018
613/2019
5/16/2020
5/23/2018
6/3/2019
614/2019
Exported on .Arne 9.2019 9:33:34 PM BOT
6/4/2019
6/412019
Pape 20118
SONY _ GM_00332645
EFTA 0020537I
EFTA01309345
Who
Items
Heli pad and tunnel gates are installed and ready for wood skin.
17
Welder
Michael & Custom
Welding - Terrance Philip
Welding
engineering and jurassic gates are due to be brought out to LSJ on
Wed., the 12th and installed. the wood skins will start as a carpenter
becomes available, likely mid week next week.
18
Five Palms
Sylvester 8 Boniface
Large Windows
The two side windows are installed, just needing finish plaster. The
large opening door panels are being built.
19
Grotto
Peter Elle
20
New Road
Michael & Jeffers
Road Project
21
LSJ Generator Room
Michael & Contractors
Hurricane Shutters
Ismail scheduled to deliver and begin install by 5/31; will work around
weather. The installation will take around 10-14 work days.
22
GSJ Cottage
Michael & Contractors
Expert Builders
Completion Date ? (6-8 weeks)
23
GSJ Helipad
Peter Elie
Helipad
Forms and lighting installation complete by 5125. Concrete pour TBD.
JE advise *H" to be Bigger. JE to review 6/5
24
LSJ Tunnel
Michael & Bill Terry
Skin it
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
Recommend going with Allied.
25
Wreckshop
Michael & Bill Terry
40x60
JB reviewed and approved drawings 5/22. MG approval and sign off of
the plans will be sent to Buck Steel 5124.
26
HM Storage
Michael & Contractors
00x60 Bld. ?
Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied.
C
27
LSJ Fuel Room
Reefco
Vents
Install Vents in Fuel storage room. Dave reduced initial quote by 4500;
ordered 5O4; EDA on STT by June 15th and will then schedule install.
28
Engineering
Michael & Contractors
Doors
Install Engineering doors. John Bedminster has estimate fonhcoming.
29
GSJ Staff Cottage
Jeffrey Boschulte
Permits
Staff Cottage - 5127 J8 submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out; JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK win notify JB once tax clearance letters back; JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to EK, who will submit the completed application on behalf of the owner.
0
30
GSJ Barn
Jeffrey Boschulte
Permits
Permits: Bam - JB awaiting selection of supplier and specs.
31
GSJ Terrace
Jeffrey Boschulte
Permit
Build 75 foot round terrace.
32
GSJ Pool Extension
Jeffrey Boschulte
Permit
Extend current pool to 80 feet from 15 feet.
33
Waterfall (Tiki or Juggly
Park)
Peter Elie
Slab
34
Gym
Michael & Contractors
Doors
Bid coming from John Bedminster
35
Flagpole Pool
Michael & Contractors
Shade Structure
Waiting for three bids: John Bedminster, EB, Mr. Gumbs
36
Flagpole Pool
Michael & Contractors
Freezer
JE advised not to order a freezer.
Exported on June 9 2019 9 33 34 PM 801
Page 3 01 18
SDNY GM 00332646
_
_
EFTA_00205372
EFTA01309346
,
,
t Projected Naval
Tarrative
• Cofaalelloa
InitiaVon Dafe
Order Date
Still Date
c Hate
'
•
•
•
.
05/28/19
05/21/19
5/24/2019
5/28/19
5/31/19
6/21/19
8/1/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Expated on June 9. 2019 9:33:34 PM 801"
Page 4 0118
<
F-z
Lu
z
1
01
SONY GM00332647
_
_
EFTA_00205373
EFTA01309347
'er
r-
rn
I
No.
Area
Who
Items
Descnption
is
37
LSJ Tiki Hut
Michael & Contractors
Freezer
Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
awaiting pickup for transport to LSJ.
38
Dock GSJ
Amy Dempsey
Permits
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
••
39
Dock LSJ
Amy Dempsey
Permits
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
under review by CZM.
i.
ao
Christmas Cove
Moorings
Patrick
Moorings
Request moorings for Christmas Cove
41
Old Generators
Michael & Bill Terry
Old Generators
Sell old Generators: Bill Terry to coordinate sale of the old generators.
Rich to speak with BIN.
42
Flagpole Pool
Michael & Contractors
Shade Structure
Shade structure is replacing need for awning.
43
Five Palms
Franks Electric
Electrical work to be done at Five Palms
44
Five Palms
Peter Elie
Concrete
Need more direction from JE. He was not pleased with current layout.
45
48
GSJ RIO
GSJ New Dock
Michael & Contractors
Michael & Jules
2nd R/0 Intake
Dock Expansion
Bob Peterson coming 5/23
FL-
JE said stop work on 5/21
47
48
49
GSJ New Dock
LSJ/GSJ Cables
Permit
Michael & Jules
Michael & Paul "Global
Tech"
Amy Dempsey
Water Sport Ramp
Underwater Cable
Underwater Cable
JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday. June 2. AA Flight 1391
2:57PM. depart Tuesday. June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
LSJE: permit expected to be issued in the next 30-45 days.
uu
C
u_
50
Heavy Machinery
Trencher
Michael
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment
and an operator.
0
51
LSJ Library
Michael
Roofing & Trim
52
LSJ Tiki Hut
Michael
Kitchen
Order Conan countertop for Tiki Hut Kitchen
53
LSJ MB Bath
Shower Tiles
Awaiting quote from John Bedminster, this project Involves new shower
hardware, plumbing, and tile work
54
LSJ Main Compound
Sylvester & James
Gazebo
Build 2 Gazebos at the MC. Mockup design given to Sylvester by JE. 4ft
on each side of the centered 3ft wide door.
55
Tunnel Entrance
Sylvester & James
Tunnel Gate
Materials needed to skin the gate frame
se
LSJ Helipad
Sylvester & James
Heli Service Gate
Materials needed to skin the gate frame
57
LSJ Dock
Mike & Brian Bates
Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5/31 of completion date.
Exported on June 9. 2019 9 33 34 PM 6O1
Page 5 or 18
SDNY_GM_00332648
EFTA01309348
5/10/2019
928/2019
pi.:7
4 .0niu
'a
Ty
IEWSW
5128119
5/23/19
6/5/19
6/5/19
5/15/2019
5/17/2019
5/17/2019
5/17/2019
Extolled on June 9.2019 9:3134 PM BOT
Page 601 18
<
1 1
0
0
SONY GM00332649
_
_
EFTA_00205375
EFTA01309349
IS IS IZISISIRISISI2.1 IS IS IS
70
71
72
73
74
75
76
77
78
79
80
81
GSJ lld Terrace
LSJ/GSJ Tiki sheds
Barn ?
GSJ Terrace
Sam's Place
Holy Shlt Point
LSJ TlkiHut
Cabana 1
Flagpole Pool
GSJ
GSJ Guest BR
GSJ Pool
Tiki Terrace
LSJ Dock
Tunnel
Christmas Cove
Sam's Pleas
Main Compound
GSJ Entrance
Grotto
Main Compound
Emergency Room
LSJ Island
GSJ Island
Brian Bates
Brian Bates
Danny & Keshaun
Brian & Ron
Maurice & Boniface
Maurice
Sylvester
Maurice
Sylvester
7
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
Maurice or Sylvester
Jermaine & Liston
Jermaine & Liston
Jermaine & Liston
Wooden Furniture
Thatch
Barn
Chandelier
Bedroom
Structure
Coral Stone
Shower Tile
Kickplate
Tiki Bar
Carpet
Wooden Steps
Brown Paint
Polyurethane
Roof
Structure
Bedroom
Theater Roof
Staircase
Steps
Ceiling
Chest is complete. Lighting to be installed by 5125.
Order thatch to be installed after Hurricane Season. (70) roes ordered,
on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT.
Supplier to be awarded
Repair Ceiling. Lighting socket needed
Build Dock structure same as LSJ
Maurice began tile work today 5/31.
Shower floor is not draining properly in Cabana 1
Install Kickplate
Fix Cabinet & Drawers
Cut Carpet to size. Carpet to long. Need to be centered under both
beds
Demo and rebuild new steps. Steps to match existing stairs at the MC
Deck to be stained
Polyurethane Boardwalk
In progress. Repair holes on tunnel roof
Material to arrive 5/28; work to start 5128.
Paint after repairs are made
Top Coat
Paint steps in epoxy grey
Paint steps in white
Stain ceiling above the White Table
Nernst WIFI
Fax
Pending setup of Efax account
Emergency PA System Island wide system for intruders
Emergency PA System Island wide system for intruders
82
ChIllax
Jermaine & Liston
er TV
Order 82" TV for Chinas Room and proper wall mount —5/29/19 •
Pricesmart will have the 82* Samsung in stock
83
Chillax
Exported on Juno 9.2019 9.33 34 PM BOT
Jermaine & Liston
Order a Heavy Duty Wall Bracket to hold the 821 Samsung TV in the
82" TV Wall mount
Chillax
Page 7o' 18
CD
0
SONY GM 00332650
_
_
EFTA_00205376
EFTA01309350
Initiation Date
Order Date
Projected Arrival
Start Date
Date
Tentative
Completion
Completion Date Date
5/25/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
6/5/2019
5/17/2019
6/6/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/1712019
6/5/2019
5117/19
5/17/19
5/17/19
5/22/2019
5/23/19
5/23/19
5/24/19
5/16/19
5/23/19
6/9/19
6/7/19
6/9/2019
Exported on June a 2019 9:33:34 PM BOT
Page 8 or 18
<
0
SONY GM00332651
_
_
EFTA_00205377
EFTA01309351
No.
Area
Who
Items
Description
Completion date. 15-29-19 MI WM, Access Points and switches and
84
New WIN Swim
Jerrnaine & Liston
LSJ/GSJ WIFE
currently waiting on 5 addition switches to handle the distribution of
existing phone services] 15-29-191 GSJ Will is In progress this week]
Camera setup at Chnstmas Cove— Pending Mike to order Yeti Solar
Jermaine & Liston
Units and Panels as per email 5/24/19 (5r29/19 GSJ DOck Nest
86
GSJ
Cameras
Camera is active)
Rio & su riesdne !aciaserelliME
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
88
LSJ astern 1
Michael & JCH
Cistern Pump
placed the order for the pump 5/24. Production time is 6 weela - the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
87
GSJ WO
Michael & Gemini
Seawater Systems
RIO Container
EDA to Tropical FL 7/12. EDA on SIT 7/21
_J
On Island on GSJ
88
GSJ RIO parts
Michael & Gemini
Seawater Systems
RIO Parts
On Island
H
89
R/O Water
Michael & Smiley
Water Testing
5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
90
Cabanas 1-4
Danny & Keshawn
Dimmers
Install Dimmers
C
91
Flagpole Pool
Danny & Keshawn
Dimmers
Dimmers not working properly
92
MC New Planter
Danny & Keshawn
MC Planter & Palm
Tree Lighting
In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at
93
Tild Waterfall
Anna, Danny & Keshawn
Pond Fountain
the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane.
0
94
Flagpole Pool
Danny & Keshawn
Kitchen
Run wires and plugs properly. Make hole in cabinets if needed. Plugs
and wires should not be seen
95
GSJ Peters Point
Danny & Keshawn
Solar Lights/Other
Lighting facing Peters Point for Safety
96
Cabana 1
Danny & Keshawn
Rope Light
Test in place. JE advise that we order more. Brighter than what's
installed at the moment.
97
Master Bedroom
Danny & Keshawn
Wall Sconce
Wall sconce does not come on around the Master. Timer to be set
6:30pm -yam ?
98
GYM
Michael & Liston
Equipment & Audio
Wiring need to be done for GYM Equipment & Audio
99
Chilies
Danny & Keshawn
Phone Plug
Replace or fix phoneflntemet plug in Chinas
100
Sam's Place
Danny & Keshaun
Bedroom
Repair Ceiling. Lighting socket needed
Plumbing & Fteeto
101
GSJ Master BR
Michael & Charlie
Master Bath
No Hot water
Exported on June 9.2019 9.33:34 PM BOT
Page 901 18
SDNY_GM_00332652
EFTA_00205378
EFTA01309352
4810811011,12.983,
tatter
CothiilaUcni
• -
• •
5/17/19
5/23/19
5/22/19
6/4/19
6/11/19
5/23/19
5/17/2019
5/24/2019
7/21/2019
5/172019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/23/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
6/4/2019
6/5/2019
5/17/2019
Exported on June 9. 2019 9:33:34 PM DOT
Page 10 0119
<
z
SONY _ GM_00332653
EFTA_00205379
EFTA01309353
No.
Ann
Who
Items
Description
Replace air handler for the Library. Dave ordered 5/27; current lead
102
Library
Reefco
Air Handler
time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
103
IT Server Room
Reefco
NC Unit
Temp a/c installed. Board ordered. Waiting on schedule.
105
Cabana 1-4 Air
Conditioning Unit
Reeko
NC Unit
Shipping next week and hopes to have by May 31st. Goal is to install
week of June 3rd. PM already on routine schedule for Cabana 4.
106
GSJ
Reefco
NC Unit
PM already on routine schedule. Bedroom. Kitchen & Living Room
107
LSJ Laundry
Reefer,
NC Unit
Housekeeping NC is not working
108
LSJ Landscaping
Cnstobal & Fabian
Irrigation
Install irrigation for new palms
109
GSJ Stones
Danny & Renol
Stones
Stones from GSJ to LSJ to create and fix all Stone walls
Chemicals &
Order Pesticides & Fertilizer for all plants and palms: Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
110
LSJ / GSJ Landscaping
Dupson & Daphne
Landscaping
Equipment
Lawnmower Headquarters quote for Stihi and Silky equipment
approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
111
Island Wide
Landscapers
Orange Vines
Remove all Orange Vines from plants on Island. Main Compound &
Island wide. Orange vines will kill the plants
112
LSJ Main Compound
Danny & Philimon
Pillars
Build 10h. Pillars by the MC new planter
Wrackahop & Heavy Machinery Operators
Expone0 on June 9. 2019 9 33 34 MA BOT
Page 11 x118
0
SDNY_GM_00332654
EFTA01309354
fiistrattoana
fl
a CdoP
ret:on.
CDMAte09r3 Clate ‘"Cat
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
Exported on Jane 9.2019 9:33:34 PM DOT
Page 12 of 18
<
z
z
SONY GM_00332655
_
EFTA_0020538 I
EFTA01309355
oo
oo
Np
O
O
rtt
No.
Area
%/lino
Items
Descriptor%
113
HM Equipment
Tap & Dale
Quadsig
114
HM Equipment
Tap & Dale
Fuel Truck / Flatbed
115
HM Equipment
Tap & Dale
Electric Carts
116
HM Equipment
Tap & Dale
ProGator
117
HM Equipment
Tap & Dale
Roller
118
Old Heavy Machinery
Tap & Jules
Removal
119
GSJ Engineering Shed
Jules & Buck
Berm
120
JE Bike
Tap
Bike Handle
121
GSJ Hydroseeder
Tap
Hydroseeder
122
Polaris
Tap
Bike
123
GSJ
Jules
Trenching
124
LSJ TIld Hut
Jules or Peter
Tiki Parking
125
Wrecicshop
Rychie
Office
126
GSJ Water Front
Patrick & Randy
Sail Boat
127
Christmas Cove
Patnck & Randy
Boat debris
We are working On the Quadskl, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The Initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Nipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get Is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap Is missing - Tire Hub cap Is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
Immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal Is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week - If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval
Turn Fuel truck into Flatbed
The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be
sent for undercoating (Rust proofing process) 5/31.
John Deere does not manufacture electric progators.
Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
MG will schedule barge to pick up directly from Tropical Shipping STT.
awaiting Barge
Create Berm to block LSJ view across from the R./0 Containers
Replace Bike handle
Axle to be purchased asap
Valve needed for Polaris bike
Trenching Area & Description needed
Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5
Clean office immediately 6/5
Mete Barge & Weer Sports Mai
Remove damaged sail boat
Remove boat debris
Export?, ] ea
]0'
2 3 33 PI! P.C)T
Page 13 0118
_J
<:_-
C
U_
O
SDNY_GM_00332656
EFTA01309356
42/2019
5/17/2019
5/17/2019
5/10/2019
6/11/2019
5/17/2019
5/17/2019
6/6/2019
6/6/2019
6/6/2019
6/52019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
Exported on June 9.2019 9:33:34 PM BOT
Page 14 of 18
_I
<
H
z
L. u
0
EC_
z 0
0
SONY GM_00332657
_
EFTA 00205353
EFTA01309357
No.
nee
Who
Sterns
128
New Crew Boat
Patrick & Randy
Crew Boat
129
AYH / Big N
Boscoe & David
Fenders
130
- AYH/B10N
Boscoe & David
Cleats
131
AYHBIg N
Boscoe & Robert Lemire
Blankets
132
PR/ Blg N
RelStni. & David
PR Repairs
133
PR/ Big N
Boscoe & David
Nana
134
Nautica Boat - NC,
Tubes, StnJeture
Carlos. Patrick & Randy
NC
135
Sport's Boat
Patrick & Randy
136
GYM
Kevin, Garth, & Mike
GYM
137
JE Dwell
Carlos & Caribbean Auto
Mart
aC
138
LSJ Suburban
Carlos & Cliffs Auto
Repairs
Accident
DeBenetton
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
5/24. Production lead time is 10 weeks. EDA to production completion
8/2.
Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5 • I'm sorry, I don't have an answer as yet* He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. He will continue to call Bobby. Barge arrival home could be
between June 100-15th
Take Nana to Offshore to get the Engines Checked
Nautica delivered 5/16/19. Fiberglass modifications in progress on
starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be
shipped off. requested estimate for bow thruster replacement (cg $3400
before shipping(just need okay from JEE and Rich to proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
6/4 offshore scheduled maintenance replace both timing belts. sports
dropped off 830am.... 6/4 work completed at 130pm picked up by PC
6/4
Cleaning, Organizing & DEMO
Demo Flooring in the GYM
Vetildee
Dealership diagnosed a leaking hose in the air conditioning system.
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
Insurance Coverage & Repairs to be made. Carlos awaiting estimate
from Cliff's Auto Repair - by 5131. Carts will take the vehicle to
Guardian 5/30 for adjuster's Inspection.
Pools & Power Wisho
Exported on Juno 9.2019 9,33:34 PM 8OT
Page 15 of 18
C
U-
O
SDNY_GM_00332658
EFTA01309358
EFTA 002053R5
Irrtia:;ci Date
Cite- Date
Picjectei it'r:vat start not°
entritivc,
Corrp)et:c
Date
Coriple:rCr, Da.',e
Date
5/17/2019
5/17/2019
5/24/19
5/17/2019
.
4/23/2019
6/5/2019
5/17/2019
6/3/2019
5/17/2019
812/2019
6/10/2019
6/10/2019
05/18/19
06/20/19
6/4/19
6/4119
6/4/19
Expected on June 9, 2019 9:33:34 PM 807
Page 16 el 18
0
u_
0
EFTA01309359
ea&
loes
1,(wx4, civz-`z
ko,4
kom larecb.c.fe
scopr..T„
®50 solo., ticakts 61", 653 Yb...c)--
2) atAA-toits
pakk. LILL,
4,„„,,, .14,4;k kx.1 ()Lk&
(eats.
hewa,,, I kooks
)ors
rYlrriC
L
le...iii.,,;(katr.,__, io.hi loca111
axe paiy4 14.4,.,;it ,1116)....ract. elt.o.A.;.,s,
) ?).,...
1
-104,— e,v,
Rko...t,, di, -F
ait tax s6Je5...,
ror Gcm "To-oloveow
-51
-Settt,,;(e.NA4/,‘
-171414
(t) MP ( elAtftat'
16)(14
V -11[41.
eitoki %I/4GS,
v- &kpd- Yak -
bx& wi,u)oos - la142801...
L ens - da.
;Dol.( W.* 4;t4VALC, 4V 614?
rnort-'k2IIS
3 11,..4, qrl.oe.6 -
t. S3
VItAri PAry,
our
0;) No.ket.. dts;
- Lbw ,45T".
cey....,2 }D Pla
DuL itzul
ricor roc-6 2 ,
curet
4A)
54,1,se Coralto
I, 'FP
CaSJ
\ic.,.3 Dive. &64yruhrik
ip( sra./
-
AIVIEI~ to
Gs.5
Cdtp, 64+0 t'nwaye)
.AA4.10, 4k+r.
ivdta, 6 ,S.S
' Pt OfCIVIA".
4,10,A It ( RA
5110
,56-
t
C4\ ali
"
CONFIDENTIAL
SDNY_GM_00332660
EFTA_00205386
EFTA01309360
name
date
project
Rederit
I a A `,///z
( -?e,t
ks
tasks
_..
Tx
1
-kaa ,
(,3si
0
•4•Neas-..L.
O(Q,..r•scc,_
, sSySr
Lsn- •
!
-••••• 4 ,••••••
S. - •
--1•••
142.-
•
,
12,6e
n
•••••••
LJRW
,
CAA:,
If
ers
•-ra
• nue,C, f
CONFIDENTIAL
SDNY_GM_0033266,
EFTA_00203387
EFTA01309361
name
date
tasks
project
?re.seir'r
F,1
CONFIDENTIAL
SONY_GM_00332662
EFTA 01205388
EFTA01309362
SIM
Bailaii______
MIMI=
TRA
ENGINEERING • EQUIPMENT
kills
Sheridan
Caribbean Motod
__Ilkcien
Broken tractors
Sheridan
Caribbean Motoring
MARINE. BOATS
Broken boats
Randy/Patrick
Offshore Marine
MARINE
Nadia - rotten wood on floor and mkiship entrance
Carlos
Mil Painters
MARINE - HAVOC*
Utde C- needs nine engines
Rarely/Pabick
Offshore Marine
GS1 - SOLAR FARM
Dad Soar batteries
Mike Glidden
Pro Solar
No Quonset hut Starting lith January. Max AS weeks barring no
GS1• BACK OF THE HOUSE
DPNR issues
Expert Builders
2/15/2019
No RO Buikling/Generator bunker: Need an Architect for
—ff .
plumbIng/dectrical drawings for RO system design. This we
G51- BACK OF THE HOUSE
causes changes to layout inside budding drawn.
Kyle
GS1Staff Cottage and Bedroom Addition: Tile is being laid, siding
Ito start roof Instillation in progress window door Install
Kyle
1PK Development
2/U2019
LS1- GROTTO
Stairs and Grotto Sun Louvers: EB pricing received. Was Mid to
put them off and sun louver company wig do this? El an still do
this If green light Is given. It will be 2 weeks iron. start date.
Kyle
Builders
III • FIVE PALMS
Five Palms Windows and Doors Reviewing Pit bid on 7th
January. Eli has missing scope off verbal, so sent detailed scope
for odds".
Kyle
1PK Development/Expert Builders
151- FIVE PALMS
Five Palms dome
Kyle
Samson Builders
L51• FIVE PALMS
Ave Palms *Harks'
Mike Glidden
LSI- GYM
Gym doors to he nmilaced
,Kyle
EGS
(Si- RO
RO still not working property: Seawater Intake pump 151
Mike Gidden
Gent Seawater Systems
1.51-MECHANICAL BUILDING
;wintering doorsstlft not even dervered
—
Kele
Tayki 'Cotton II Ridley
(Si- ELECTRICAL
Rusted Lights
Mike Gidden
LSI • LANDSCAPING
No solar lets
Anna
Innove
i
dons CRS
151-MAINCOMPOUND
Cabana 3 Inoperablm The back up and pipes repaired. Awaking
arched dates olds, Mooring compeer (2 weeks horn arrival of
Rood% company(.
Kyle
JPK DevelopmentASIE
Cabana de redo?
Kyle
JPK Development?
Ogles bath
Kyle
1.51- MAIN COMPOUND
Cabana and albs Floor= MP has been contacted. PK and AHF
to dscuss pricing for Insurance.
Kyle
PK/AHF
LS1- MAIN COMPOUND
Chain Tray Ceiling
Kyle
LS1-TIC HOUSE
lid Idtchentille samples awaiting approval, kitchen demi:Mettle
Is next step, then cabinets. etc.
MR
ISLE
1/25/2019
Gil -71K1 HOUSE
Big Mk Brian to finish deck 2 days, roof starting (leaves 3.5
weeks for roof Install and finishes
Kyle
Brian Bates
1/31/2019
LS1- OFFICE PAVILION
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review.
Kyle
PK/Augustus Hemy/BWC
uu
0
w
SDNY_GM_00332663
EFTA01309363
MGR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
EIWC on site 7th January 11 am to review.
Kyle
AL/Augustus Henry/BWC
Cabana 4 rook Awaiting BWC Sub-ProPosal. Pokey on site 7th
January 9am to review. MS weeks each roof). BWC on site 7th
January 11 am to review.
Kyle
SPIC/Augustus Nenry/BWC
Dump truck
Shaklee
ENGINEERING • EQUIPMENT
Fuel truck
Sheridan
Flatbed
Sheridan
Trendier
Sheldon
GSI • GENERATORS
Generators not yet online
Mike Geddes
GO -SEPTIC
Septic not yet connected
Mils Glidden
San Jan eolailla
GM • RO
RO dawned end cannery 2019
Mike Glkiden
Gemini Seawater Systens
GO - RO
Pumps: interconnectinliddeg.Perear end end conduks,
power to the seawater pump station and the andawIng of the
container.
Mike Glidden
Gent Seawater Systems
W -TERMINAL FROM''
Pumps not working
Mae Glidden
LW - TECHNOLOGY
No Nibble WWI or Internet Outsourced
Jennies
VITA/2Guysigert)7
GM - TECHNOUDGT
No Reliable WWI or hitt Mt Outsourced
illinaille
IVIMAGUYS (Ear)?
Pebble beach not poured:To begin next week on rebar footing
and pour for FM. Then stone wall and roof schedule dependent
on wall. 8 weeks tentative finish.
K/440 DNYTNN
WE
3/8/2019
W• ROADS
Roads not started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January— lifters in discussion with
lawyers cot:edit.
Kye
Eason Jeffers
Master shower
Oft
(Si. LANDSCAPING
Palm trees- need start data
EMPean
Meyer's Turf& landscape Nursery
Lel - *DMUS
Staffing
VIER
CouMertopc Nide:lien company to came down
Kyle
(Si- MAIN COMPOUND
Cabanas 1-4 Vanities III. kitchen company towns doss
Kyle
GS!- STAFF0317AG(
Furniture for Staff Cottage
JE/Tarles
Wardrcbes for ii Cabanas and Carpets for Oaks
JOKaryna
Stark Carpet
MICHELLE'S TRANSPORT
Big N repels
Roscoe
Marina Del Rey PR
Engineering building fixed
Kyle
Gil- MECHANICAL BUILDING
Enertmaing building new one but
Kyle
Med Steel
Carts
Sheridan
Palmetto Motorsports
(Si - lANDSCATING
Landscape equipment
Denson
Forster and apropos
Dotson
Site One LandsCajat
GO - COCKS
Docks constructks
Kyle
151 • DOCK
Dock • NE
Kyle
American Expert
LS' • RO
Cables to be run: Installation and termination of the fiber op&
:cable between the RO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
_J
p
11.1
CD
O
0
SDNY_GM_00332664
EFTA01309364
Conduit Bank LSJ - Seawater and fiber • started: WAPA Switches
to be purchased
Mike Glidden
1.51- MAIN COMPOUND
Stone Wall to be built Schedule and budget established -starting
10th January
Kyle
'Danny
3/29/2019
151- MAIN COMPOUND
MaM COMpound pool awnings to be put up_
Kyle
Sylvester
Abort° be run
Mice Glidden
MARINE
/at skh
Rendy/fratdck
Shaklee
MARINE
Boat fl iers
RandY/Patrkk
South Pori* Trailers
Water trailers
Mike Glidden
AR Attadmiants
151- MAIN COMPOUND
Shower dles to be redone
Kyle
PK Development
Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our sbb (with post haw-outs) -
erect post and
Kyk
Nursery steps to be Axed
KyM
INC
LSI • MAIN COMPOUND
Cabanas curtelns
Alberto Pinto
1/18/20/5
IS1 - MAIN COMPOUND
Kitchen banquette
Custom Canvas
151• MAIN COMPOUND
Cabanas Bed Netting
Oatom Canvas
<
CD
u_
0
SDNY GM 00332665
_
EFTA_0020539 I
EFTA01309365
@
"
64静
堑
!
,
扣d~山
CONF一DENTIAL
SONY GM 00332666
EElA00205392
EFTA01309366
en
Np
O
O
LC
!
11.
MEMO
MinagMaltia
EIMINEERING•IAUIPMENT
Broken kills
Sheridan
Cai00nn Motoring
Broken tractors
Shidden
Caribbean Motoring
MARINE-BOATS
Broken boats
Randy/Pa idc
Offshoot Marine
MARINE
Nougat • rotten wood on floor and nidihipenerance
Curbs
PI Painters
WANE • NAUTICA
Little C - needs new enignes
Raretrintrick
Onshore Marine
GS1 • SOLAR FARM
Deed Solar batteries
Mike WM
Pro Solar
GSI • BACK Of THE HOUSE
No Quonset hut Starting 14th January. Max 45 weeks boning no
DPNR Issues
Kyle
Expert Builders
2/13/2019
tifil • BACK Of THE HOUSE
No RO sollealfGenerator bunker: Need an Architect for
plumbing/Salad drawings for RO system design This will
causes changes to layout Inside Mang drawn-
Kyle
GS! - STAFF COTTAGE
651 Staff Cottage and Bedroom Addition: Tile is being laid, siding
to start, roof last:Nadal in progniss, window door install
Kyle
Inc Development
2/1/2013
LSI-GROTTO
Stairs and Grotto Sun Lateen: Ell pricing received. Was told to
put them off and sun louver company will do this? CB an still do
this if
light is (ven. It will be 2 weeks from sten date.
Kyle
Expert Builders
IS)- FIVE PALMS
green
Five Palms Windows and Doors: FtrOewing OK bid on 7th
January. CB has missing scope off verbal, so sent detailed scope
for pal%
Kyle
n Development/Exnert Buodors
LSI -FIVE PAWS
Ave Palms dome
Klee
Samson Builders
LSI- AVE PALMS
FivePalms *Ma
—
Mike Glidden
LSI •GYM
Gym doors to be mixed
Kyle
EGS
LSI- RO
RO still not norldiaarNierir Senna Intakeptimp LSI
Mike Glidden
Gamed Seawater Systems
Engineering doorsill not even dawned
Kyle
Taylor, Cotton & Ridley
LW ELECTRICAL
Rusted Usher
IMce Glidden
No solarAlits
Anna
Montan (0IMA)
Cabana 3 Inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company (1 weeks from arrival of
Goofing company1.
!Kyle
JPK Develamentfisfr
Cabana the redo?
Kyle
la Development?
LSI • MINI COMPOUND
Oenbath
Kyle
IS1- MAIN COMPOUND
Cabana and ChM floors: AHf has been contacted. RIK and MN
to discuss pridng for Insurance.
V °
JPIUMIF
IS1 • MAIN COMPOUND
Chile:Tray Ceiling
Kyle
LSI -TIM HOUSE
Old kitchenlb samples mid% approval, kitchen demo 'd, ilk
Is next step, Men cabinets, etc.
Kyle
WE
1/15/2019
GE4•TIKI NOISE
Big TIM Brian to finish deck 2 days, roof starting (Imes 33
weeks for roof Instal and finishes
Kyle
Brian Bates
IMAMS
ISJ• OFRCE PAV1UON
Office Pavillon roof material not ordered: Awaiting BWC Sub.
Proposal. Pokey on site 7th January 9am to review. (4.5 weeks
each roof). BWC on site 7th Januar/liens to review.
Kyle
JPKiAugUStut Henry/BWC
_J
z
LU
C U_
z
O
SDNY_GM_00332667
EFTA01309367
hiflit roof material not ordered: Awaiting MC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
BWC on site 7th January 11 am to review.
Kyle
PX/Atewstus Nsaiy/BWC
L.S1- MAIN COMPOUND
Cabana 4 roof. Awaking !MC Sub proposal. Pokey on site 7th
January 9am to review. DLS weeks each rail BWCon site 7th
January 11 am to review.
Eta
WIC/Augustus Fienty/BWC
Dump tract
Sheridan
Fuel buck
Sheridan
Flat bed
madden
Wet
Sheridan
GS1 • GENERATORS
Generate(' 'satin online
Mike Walden
GSI - SEPTIC
Sapde not yet connected
Mike Glidden
San Jan Botanic'
Gil - RO
Reg delivered end oflanuary 2019
Mike Glidden
Gemini Seawater Systems
GSJI• RO
Pumpsl Intercom/a% 0104 newer and control conduit',
power to the seawater pump Haden and the anchoring of the
container.
Mike Glidden
Gemini Seawater Systems
(Si -TERMINAL FACIUTY
Pumps not waiting
Mike Glidden
III -TECHNOLOGY
No Reliable YAFI or Internet Outrouroed
/ermine
reiViGtlys (WI)?
GSJ -TECHNOLOGY
No Reliable Varier Internet Outwitted
Jennie*
VIWIGull (Fad)7
Pebble bad) not poured: To begin next week on rebar footing
and pour for FIN. Then stone wall and roof schedule dependent
on wall II weeks tentative fintslt
ilfTWOLIPsoll
LSJE
— .....
LSI - ROADS
Roads not starts* Jeffers 2 Roads • offers to confirm sciwdule.
Tentative start date lath January. Jeffers in discussion with
lawyers on aedif
•
Kyle
Eason Jeffs
ISJ • MAIN COMPOUND
Master skews
Kyle
Palatines - need start date
'Dupson
Meyer's Turf & Landscape Nursery
LSI -ADMIN
Stating
NARA
Countertops EL kitChen company to come dam
Kyle
Cabanas 1.4Vanldet Ft kitchen company to come down
We
GS1 - STAFF COTTAGE
Furniture for Staff Cottage
iffil•Pfla
131- MAIN COMPOUND
Wardrobes for all Cabanas and Carpets for CMOs
NAOMI'
Stark Carpet
Bit N repairs
Bosco,
Maine Del Rey PR
1S1- MECHANICAL BUILDING
Enshwering building ibred
Engineering building new one bulk
Kyle
Miled Steel
Carts
Sheridan
Palmetto Motorsmns
I.Sl• LANDSCAPING
Landscape ecruipment
Oupson
1ST -LANDSCAPING
Ferdlizer and
q
n
Site One Iambs*
GS' - 0005
Docks annum:don
151-DOCK
Dock - IPE
Kyle
Medan Export
151-RD
Cables to be run: Installation and termination of the fiber optic
able between the RO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
uu
0
LL
SDNY_GM_00332668
EFTA01309368
LSI- ELECTRICAL
Conduit Bank IS1 - Seawater and Fiber - started: WAPA Switches
to be purchased
Mike Glidden
_
Stone WIN to be built Schedule and budget established-starting
10th Janus ey
Kyle
Danny
3/29/ 19
Lll - MAIN COMPOUND
Maln compound pool awnings to be put up
49
Sony
fiber to baton
Mike Glidden
MARINE
let skis
Randy/Pat:kit
Sheldon
MARINE
Boat trailers
fteerlY/Patridt
South Florida Tillers
Water trailers
Mike Glidden
AM Attachments
LS• MAIN COMPOUND
Shower Mesta be redone
Kyle
JPK Development
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (MS post leave-out:I/ -
erect post end
Kyle
LSI -1ANDSOSING
Norway steps to be Reed
Kyle
JPK Development
Cabenes curtains
Alberto Pinto
1/*/ 2019
ItIbthen banquette
Custom Canvas
Cabanas Bed Netting
01Stigni Cantle
H z
w
LL
SDNY_GM_00332669
EF1'A_00205395
EFTA01309369
44 Amex.
At 1\4-.4 AMEX
le
gs
Vat A'
L,23%,
0 56c. 1,0)Flav,
III Yha".12
"3/4 '2.
1,-;6y,xy, ,
Mow
bcdt
14a,tArt'co-4- lAsiniDoeis
vt-kys -4- "PokciA 1,otco
estlxwtas.
va
CiAb4alvte, 11O f.)
140ale_s
Air Covic);lieners -1-httinseAvel,
r
grL(1 ,4
CONFIDENTIAL
TUl
SONY_GM_00332670
EFTA 00205396
EFTA01309370
Jammu
imam
4
,A.Ap
sMMaggagagg
Iregans
gtojs
`Sheradon
Caribbean Motoring
Broken lulls
Broken tractors
Sherklon
Caribbean Motoring
MARINE -BOATS
Broken boats
Randy/Patrick
Offshore Marine
MARINE
Maude.- rotten wood on floor and midgdp entrance
Corks
BM Pettey:
tilde C- needs new engines
Randy/Patrick
Offshore Marble
4351- SOLAR FARM
Deed Solar Wearies
Mike Glidden
Pro Sobr
No Quonset hut Starting 14th January. Max AS weeks barring no
OHM Issues
Kyle
&Pert Builders
2/15/2019
Gil • BACK OF THE HOUSE
No RO Doildln8/GeMrator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. TMs will
causes changes to layout Inside Madrid:awn.
Kyle
151- STAFF COTTAGE
G51 StyeCottage and Bedroom Addition*. Tile is being laid, siding
to start roof Insmilation In progress, window door install
Kyle
1PK Development
2/1/20191
1.51-GROTTO
Stairs and Grotto Sun Louvers: ES pridng received. Was told to
put them off and sun louver company will do this? Efl can still do
this If green light is given. It will be 2 weeks from start date.
Kyle
&pert Builders
LS1- FIVE PALMS
Five Palms Windows and DOOM Reviewing PK bid on 7th
Annan% ES has missing scopeoff verbal, so sent detailed scope
for acidic
Kyle
JPK Development/DPert Bulkier;
LL- AVE PALMS
Fite Palms dome
Kyle
Samson Builders
LSI • RVE PALMS
Five Palms electrical
MIke Glidden
LSI-GYM
%radon:a to be
aleced
lryle •
EGS
Ls,-RO
RO still not working pronedy: Seawater intake pomp LSI
Mike Glidden
Gemini Seawater Systems
(51- MECIUNICAL BUIUNNG
Enghwering doors still not even delivered
Kyle
Taylor Cotton & Ridley
IS1 -ELECTRICAL
Rusted Lights
Mike Glidden
No solar lights
Anna
innovadons (CHINA)
111- MAIN COMPOUND
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company ( 2 wade from aMval of
flooring company).
Kyle
JPK Develmwroent/LSM
IS% • MAIN COMPOUND
Cabana tile redo?
Kyle
JPK Development?
I.5.1 MAIN COMPOUND
Chiba bath
Kyle
LSJ• MAIN COMPOUND
LS1- MAIN COMPOUND
Cabana end Chiba *OM MN has been contacted. We and ANT
to dbans pricing for Insurance.
Kyle
JPII/NIF
Chiles Trey Ceding
Kyle
1.51 - 1110 HOUSE
TIN kfldeen: Tile samples awaiting approval, kitchen demo d, tie
is next step, then athinets, etc.
Kyle
ISA
1/25/2019
G51 • TIKI HOUSE
Big Tad: Man to ankh deck 2 days, roof sorting (leaves 35
weeks for roof install and finishes
Kyle
Brian Bates
1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January gam to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review.
I Kyle
JPK/Augustus Henry/BWC
SONY_GM_00332671
0
0
EFTA01309371
MBR roof material not ordered: Awaiting BWC Sub-proposai.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
15$- MAIN COMPOUND
BWC on site 7th January 11 am to review.
iKyle
inamentus ii.m/awc
Cabana 4 roof: Malting BWC Sub-proposal. Pokey as site 7th
Januar/9am to review. (43 steels each roof). BWC on ske lth
January 11 am (preview.
Kyle
UPK/Augustus Henry/BWC
Dump truck
Sheldon
Fuel truck
Sheridan
Flatbed
Sheldon
Trencher
Sherkke
451-GENERATORS
Generators not yet online
Mike GRdMtt
G51- SEPIK
Septic not yet connected
lace Glidden
San Jan Botanica
651-RO
RO delivered end Warman/ 2019
Orne Glidden
Gemini Seawater Systems
651 - RO
Purlieu *Mercer/recline piping, power and control conduits,
power to the seawater pump station and the anchoring of the
container.
Mike Glidden
Genki Seawater Systems
(Si -TERMINAL FAcarry
hanot wrens
Mike Glidden
151-TECHNOLOGY
No Reliable WIFI or Internet Outwitted
lumens
viYA/26urs RAW
65l• TECHNOLOGY
NO Reliable WIR or Internet Outtourced
Herein.
VIYA/2GunNari)7
L51- PEBBLE BEACH
Tebbe bath not Peat To bese next weak on rebar fooling
and pow for RN Then Rom wall end roof schedule dependent
on wall. 8 weeks tentative1RWL
Iffie/OuPSoll
WE
3/11/7019
'SI - ROADS
--
Roads not started: Jeffers 2 Roads - Jolters w coneys schedule.
Tentative startdate ?AO Benham Milers in discussion wle
lawyers riellettlt.
Kyle
Eason laNeN
Master shower
Kyle
nab, toes- need aft date
L.51 • ADMIN
Staffing
I.S1 - FLAGPOLE POOL
./4
Castettafa R.Iltdsen company to come dorm
Kyle
Cabanas 1-4 Vane's: FL kitchen company to come dawn
.S 4
Furniture for Staff Cottage
JE/Kuyna
I.S1 - MAIN COMPOUND
Wardrobes focal Cabanas and Carpets for Chile
1E/Karyna
Stark Carpet
MICHEUE5 TRANSPORT
Ole N repirs
BC•10:00
Manna Del Rey PR
Le -MECHANICAL BUILDING
Engineering buildingfixed
Kyle
GS1 - MECHANICAL BUILDING
Engineering building new cee bunt
Kyle
Allied Steel
Cans
Sheldon
Palmetto Motorsports
(Si - LANDSCAPING
Lands e*albeTnat
Duman
Finlike and spraying
Duman
Site One landscape
651-DOCKS
Docks constructran
Kyle
1S1-DOCK
Dock -1PE
Arnerkan Export
LSI - RO
Cables to be run: Installation and termination of the fiber optic
cable between the RO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
SDNY_GM_00332672
EFTA01309372
ISJ • ELECTRICAL
Conduit Bank MI - Seawater and Fiber • started: WAPA Switches
to be purchased
Mks Glidden
1.51 • MAIN COMPOUND
Stone Wall to be built: Schedule and budget established - stetting
10th January
Kyle
Danny
3/29/2019
1.51 - MAIN COMPOUND
Main
be
Kyle
*Nester
compound pool awnings to
put up
Rber to be run
Mike Glidden
MARINE
Jet slds
Rade/Petrldr
Sheri:Ion
MARINE
goat trailers
Randy/PaDick
South Ronde Trailer{
Water trailers
Mike GlIdclan
MR AtIschwants
(Si- MAIN COMPOUND
Shower Ulu to be redone
Kyle
Ja Development
IS- LANDSCAPING
Pergola waterfsel tube poured and shelter bunt: Need to
establish layout of post. then our slab Keith post Nave-outs) -
erect postiand
Kyle
151 - IANDSCAPING
Nunety_steps to be Reed
Kyle
NIt Development
Cabanas curtains
Alberto Pinto
1/19/2019
(Si- MAIN COMPOUND
Kitchen banquette
Custom Carnes
151- MAIN COMPOUND
Cabanas Bed Netting
Custom Canvas
C
u_
SDNY_GM_00332673
EFTA01309373
L
TMkI N
IMAM
i
wagemate
START DATE
If
ENGINEERING • EQUIPMENT
Broken lulls
SherIda,
Caribbean Motoring
Broken anon
Sheldon
Caribbean Motoring
MARINE - BOATS
Broken beats
ftandy/Patride
Offshore Marine
MARINE
Neutka - rotten wood on floor and midship entrance
Carlos
BVI Painters
MARINE- NAUT/CA
Utile C - needs new engines
Randy/Patrick
Offshore Maybe
CV- SOLAR FARM
Dead Solar batteries
Mike Glidden
Pro Solar
GTd - BMX OF THE NOUSE
No Quonset hut Starting 14th January, Max 4.5 weeks barring no
DPNR bsues
Kyle
-
Expert Builders
2/15/2019
No RO BuildIng/Generator bunker: Need an Anhltect for
plumbing/electricaldrawings for RO system design. This will
causes changes to layout Inside building drawn.
Kyle
G51 Staff Cottage and Bedroom Addidon: Me Is being laid, siding
to start roof installation
_htrrogress, window door instal
Kyle
Development
2/3/1019
L51 -GROTTO
Stabs and Grotto Sun Louvers: EB pricing received. Was told to
put them offend sun lower company will do this? Ell an OM do
this If green light is given. It will be 2 weeks from start date-
IJpK
Kyle
Wert Builders
IS1- FIVE PALMS
Five Palms Windows and Doom Reviewing PK bid on 7th
January. Eft has missing scope off verbal, so sentinelled scope
for prking.
Kyle
JPK Davebpment/Expert Bulk:hes
LS1- FIVE PALMS
Five Palms dome
Kyle
Samson Widen
LSI - AVE PALMS
Rae Paints electrkal
Mike Glidden
W- GYM
Ginn doors tote rsPbsed
Kyle
EGS
IS/ - RO
- - ROstill not world:It p
-ripe Seawater intake PumPla
Mike Glidden
Gemini Seawater Systems
lil- MECHAIIICAL BUILDING
Engineering doors al not even delivered
Kyle
Taylor, Cotton & Ridley
IS) • FIECTRICAL
Rusted Ilkda
Mike Glidden
I.51- LANDSCAPING
No solar lights
Ama
Innovations (CHINA)
I.S1 • MAIN COMPOUND
Chem 3 inoperable: Tile back up and pipes repaired. Awaiting
entail dates of the Roaring company (2 weeks from arrival of
flooring company).
Kyle
n Development/WE
Cabana tie redo?
Kyle
JPK Development?
LSI • MAIN COMPOUND
Cigna bath
Kyle
(Si • MAIN COMPOUND
Oben* and Odllax NOM AMP has beet contacted. JPK and ANC
t deans trials for Insurance.
INANE
I.S1- MAIN COMPOUND
_RN
Chill/taw Ceiling
Kyle
LSI -TIKI HOUSE
ru *sham TIle FlimPles waking approval, kitchen derno'd, le
knee/ step, then cabinets, etc.
ITS
LSJE
1/25/1019
GSJ -TIM HOUSE
Big Mk Brian to ankh deck 2 days, roof starting (leaves 3.5
weeks format Instal and finishes
Kyle
Brien Bates
1/31/2029
Office PaAllon roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January Pam to review. (45 weeks
each roof). MSC on site 7th January 11 am to review.
Kyle
PK/Augustus Henry/BWC
SDNY_GM_00332674
_J
Fn.
1,11
C
U_
0
EFTA01309374
LL • MAIN COMPOUND
MBR roof material not ordered: Awaiting BWC Sub-proposal.
:Pokey on site 7th January 9am to review. (4.5 weeks each tool?
I BWC on site 7th January 11 am to review.
Kyle
WE/AuguStus Nenry/SWC
Cabana 4 roof: Awaldng BWC Sub-proposal. Potty on site 7th
lantory gam to review. (4.5 weeks each roof). BWC on site 7th
Mir/ 11 am to review.
If
fiK/AujuStuS leasSIYNC
Dump truck
Sheldon
Fuel Mick
SMrldort
Flat bed
Sheldon
Ttencher
Haddon
Gil -GENERATORS
Generators not yet wine
Mice Glidden
GU •SEPTC
Septic not yet connected
Mis Glidden
San Mn Botanic"
GS,- RO
ROdeRvenid end of/ant/my 2019
Mike GiSden
Gerrard Seawater Systems
GM - RO
Pumps: Interconnecting Pining. power and control conduits.
power to the seawater pump station and the anchoring of the
container.
take Glidden
Gemini Seawater Systems
III -TERM*/ MOUT/
Punps not working
Mike Glidden
LSI -TEOINOLOGY
No Reliable WIFI or Internet Outtourced
Winkle
VITATIOW1 (Lad)?
MI • TECHNOLOGY
INo Reliable WIN or Internet 0utsouroed
lennalne
VP/Af2Guys (Earl)?
(Si - PEBBLE BEACH
'Pebble beach not poured: To begin next week on rebar footing
and pour for FDs. Then stone wall and roof schedule dependent
on wet 8 weeks tentative finish.
Kyle/Dupeon
1511
3/8/2019
LSI-ROADS
Roads not stared: Jeffers 2 Roads-Jeffers to confirm schedule.
Tentative startdate 14thJanuary. Jeffers In discusPon with
lawyers on credit
Kyle
Eason Jeffers
Master shower
Nye
Palm trees- need start date
Dupeon
Meyer' Turf& Landscape Nursery
LSI - ADMIN
Stafing
SAM
Countertopt FL kitchen company to cane down
KW
IS1- MAIN COMPOUND
Cabanas 1-4Vanillas: A. kitchen ecapany to come down
Kyle
Furniture for Staff Cottage
1F/Keryw
Wardrobes for all Cabanas and CarPets f or Chas
SE/Karpr
Stark Carpet
MICHELLE'S TRANSPORT
Big N repairs
BONA
Marina Del Rey PR
Engineering building fixed
Kyle
Enginearing building new one brAt
Rye
MUM Steel
Carts
Sheridan
Palmetto Mcgcomorts
LSI-LANDSCAPING
Landscape equipment
Duper
LSI • LANDSCAPING
renter and spraying
Dimon
Site One Landscape
G51- COOLS
Docks construction
KW
ISI - DOCX
WA - IDE
Kyle
Amerkan smart
LSI-RD
Cables to be nal: installation and termination of the fiber optic
cable between the RO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
H
0
0
SDNY_GM_00332675
EFTA_0020540 1
EFTA01309375
LSI -ELECTRICAL
Conduit Bank ISJ - Seawater and Frier- started: WAPA Switches
to be purchased
Mike Glidden
151 - MAIN COMPOUND
Stone Wall to be built Schedule and budget established -stating
1Oth January
Kyle
Danny
3/29/2019
(S1- MAIN COMPOUND
Main compound pool awnings to be put up_
Kyle
Sylvester
Aber to be nun
Mike Glidden
MARINE
Jet slds
Randy/Patrick
Sheridan
MARINE
Boat trailers
Randy/Patrick
South Florida Trailers
Water trailers
Mike Glidden
All Attachments
(Si - MAIN COMPOUND
Shower tiles to be redone
Kyle
ink Development
Lel- tANDSCAPING
Pergale waterfall to be poured and shelter be: Need to
establish layout of post, then our dab (with post leavemuts) -
erect post and
Kyle
151-LANDSCAPING
Nurser/steps to be feed
Kyle
Jilt Owebpment
I.S1 - MAIN COMPOUND
Cabanas curtains
Alberto Pinto
1/18/2019
LSJ • MAIN COMPOUND
Kitchen banquette
Custom Canvas
Cabanas Bed Netting
Custom Canvas
0
0
SONY_GM_00332676
N
O
Np
O
O
< I
r._
111
EFTA01309376
Broken kills
Sheridan
Caribbean Motorirg
Broken Imams
Sherbat
Caribbean Motoring
MARINE- BOATS
Broken boats
flanckfiratrkk
Offshore Marine
MARINE
Nation- rotten wood on floor and mkishlp entrance
Carlos
IV, Painters
MARINE- NAUT1CA
URN C • needs new engines
Randy/Patrkk
Offshore Marine
al - SOLAR FARM
Dead Solar batteries
Mike Gadder,
Pro Solar
651- BACK OF THE HOUSE
No Quonset hut Starting 14th January. Max 4.5 weeks barring no
DPNR Wild
Kyle
fart Builders
7./15/2019
GS! - BACK OF THE HOUSE
No RO BulidingfGenerator bunker. Need an Architect for
pfurafing/electrical drawings for RO system design. This will
causes dunes to layout inside bulding drawn.
KIN
GS! - STAFF COTTAGE
GS' Staff Cottage and Bedroom Addition: 'Me Is being laid, siding
to start, roof InstallatiOn in progress, window door Instal
Kyle
MC Development
2/1/2019
LSJ -GROTTO
Slairs and Grotto Sun lowers: Ell p116mg received. Was told to
put them off and sun lower company will do NO Ea call Idli do
this If green right is given. It will be 2 weeb from start date.
Kyle
Expert Builders
LSI- FIVE PALMS
Five Palms Windows and Doom Reviewing INC bid on 7th
January. E8 has missing scope off verbal, so sent detailed scope
for pricing._
Kyle
JPK Development/Espert Wilder'
IS1- FIVE PALMS
Five Palms dome
Kyle
Samson Builders
LSI- FIVE PALMS
Five Palms electrical
Mike Glidden
LSI • GYM
Gym doors to be replaced
V.
iEGS
ROAN not weildng properIrSerweter Intake pump LSI - -
Mike Odd',
Gemini Seawater Systems
LSI • MECHANICAL BUILDING
EnOneedng doors sde not even delivered
Ryle
Taylor, Cotton & Ridley
LSI • ELECTRICAL
Rusted lights
MON Glidden
LS1- LANDSCAPING
No solar %Ms
Arms
Innovates (CHINA)
131 - MAIN COMPOUND
Cabana 3 incomble: Tie back up and pipes repaired. Awaiting
arrivaldial of the loon* company (2 weeks from arrival of
Roofing company).
Kyle
WK Development/l32
IS1 • MAIN COMPOUND
Cabana de redo?
Kyle
IPK Development?
Chaim bed,
Kyle
Cabana and oaax Doors:MD has been contacted. JPK and NW
to discuss pridng for Insurance.
Kyle
PK/AHF
alba Tray Gang
Kyle
LSJ - TIN HOUSE
Ted tithe t Tile samples awaking aPPriairlik IdtthIll demo% KW
is next step, then cabinets, etc.
Kyle
IS
1/25/1013
GII - Tun HOUSE
Big 'nick Brian to Rath deck 2 days, roof starting (leaves 3.5
weeks for roof install and finishes
Kyje
Brian Bates
1/31/2019
151. OFFICE PAVILION
Office Pavilion roof material not ordered: Awaiting Pwcsub•
'Proposal. Pokey on site 7th January 9am to review. (0.5 weeks
each roof). BWC on site 7th January 11 am to review.
Kyle
JPK/Augustus llenry/BWC
H
C
I.,_
0
SONY_GM_00332677
en
O
Np
O
O
etI
r_
LU
EFTA01309377
a
in
in
0
rtt
MBA roof material rot ordered: Awaiting BWC Sub-ProPosaL
Pokey on site 7th January 9am to review. (4.5 wastages), roof).
LS1 • MAIN COMPOUND
BWC on site 7th January 11 am to review.
Rile
JPIC/
users Henry/BWC
LSI • MAIN COMPOUND
'Cabana 4 roof: Awaiting BWC Sub-proposel. Pokey an she 7th
January gam to review. MS weeks each roof). BWC on site 7th
January 11am to review,
KIM
PK/Augustus Nervy/BWC
Dump truck
Sheridan
Fuel truck
Sheridan
Rat bed
Meriden
Trencher
Sharidon
GSA -GENERATORS
Generators not yet online
Mike Gldden
GSA -SEPTIC
Sep* not yet connected
Mike Glidden
San Jan Botanic*
GSJ• RO
RO delivered end ofJanuary 2019
Mike Glidden
Gent Seawater Systems
G51-RO
Pumps: Interconnecting piping, power and control Conduit%
power to the seawater pump station and the anchoring of the
container.
Mike Glidden
Gemini Seawater %/stems
Pumps not working
Mike Glidden
LS1 • TECHNOLOGY
No Reliable WIR or Internet Outsourced
Jermalne
VITA/2Guys Harp
GL -TECHNOLOGY
No Reliable YOH or Internet Outwitted
Jermalne
VITAfiGuYS (ENO?
LSI • PEBBLE BEACH
Pebble beach not poured: lb begin next week on rebel /canoe
and pour for FOs. Then stone wall and roof schedule dependent
on wall. 8 weeks tentative finish.
Kyle/Dupson
WE
3/8/2019
IS-ROADS
•
-
Roads not started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January. Jeffers In discussion with
lawyers on credit.
Eason Jeffers
Kyle
Master shower
Kyle
Palm trees-
date
Dupson
Meyer's Ref& landscape Nursery
need start
131 - ADMIN
Staffing
1E/HM
C011ntertcbc FL iltchen totally tO come down
Kyle
i
LSI • MAIN COMPOUND
Cabanas 14 Vanden FIL kitchen company to come down
Kyle
Furniture for Staff Cottage
FE/KalWill
LSI • MAIN COMPOUND
Wardrobes for ell Cabanas and Carpets for Chiba
clE/FarYll/
Stark greet
MICHELLE'S TRANSPORT
N N repairs
Roscoe
Manna Del Rey PR
Engineering building fixed
Kyle
Engineering building new one built
Kyle
ABS Steel
Cart
Sherldon
Palmetto Motorsports
landscape madame*
Dupson
LS1- LANDSCAPING
Fetter and spraying
Dodson
Site One Landscape
GS1 • DOCKS
Daces construction
Eyle
LSI - DOCK
Dock -APE
Kyle
American Export
ISI- RO
Cables to be run: Installation and termination of the fiber optic
cable between the RO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
_J
H
LU
C U_
0
SDNY_GM_00332678
EFTA01309378
Conduit Bank LSI - Seawater and Fiber - started: WAPA Switches
to be purchased
Mike Gadden
LSI • MAIN COMPOUND
Stone Wall to be butt Schedule and budget established-sterling
10th know
Kyle
Danny
3/29/2019
L51- MAIN COMPOUND
Main compound pool awnings tote put up
Kyle
Sylvester
Elbert° be run
Mae Likklen
MARINE
let skls
Randy/Paned
Sheridan
MARINE
Boat trams
Randy/Patna
South Nandi Trales
Water trailers
Mpn Skiden
AN Attachments
151- MAIN COMPOUND
Siemer des to be redone
Kyle
DK Devotee/Mtn
LSI • LANDSCAPING
Pergola waterfall to be poured and sheker but : Need to
establish blade( post, then our slab (with post leave-odd -
erect post and
Kyle
151-LANDSCAPING
Nursery steps to be fixed
Kyle
JPIC Development
Cabana curtains
AlrentiMnto
1/18/2019
IS1- MAIN COMPOUND
Ntdien banquette
Custom Canvas
LSI• MAIN COMPOUND
Cabanas Bed Neale
adornCanvas
SDNY_GM_00332679
EFTA_0O205405
EFTA01309379
Rough Notes/Punch List from January 6, 2019 meeting on LSJ
JE, DKI, BG, KG, Kyle Reavis, Mike Glidden and Dupson Donnissaint attending
1.
Confirm turbo charger for lull was on plane — confirmed. Brice sent picture.
2.
order new lull
3.
order new dump truck
4.
order new fuel truck
S.
order new flat bed
6.
order new tractor
7.
order new hydro seeder
8.
order new man lift
9.
order new push lawn mower
10.
order new roller
11.
order new trencher
12.
order new larger fertilizer sprayer
13.
order hydraulic hose machine
14.
order tire changer for commercial vehicles
15.
order new jet ski
16.
Confirm condition of most recently purchased tractor and what needs to be done to it
to make it fully operable.
17.
Nautica and Sportis are both to be ready by January 30, 2019
18.
Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica
and Sport's are back up and running — est. to start by Feb 1.
19.
new barge that is wider to accommodate two concrete trucks
CONFIDENTIAL
SDNY_GM_00332680
EFTA 00205406
EFTA01309380
20.
barge and "Bubblerisp?)
21.
Omega Electric— Darren to handle demand letter after getting backup from Mike
Glidden.
22.
Pro Solar — follow up with Erika
23.
Generator Bunker — Architect and Engineer
24.
Mike's Cottage —addition and main — by February 15, 2019
25.
Gym — Replace Equipment
26.
Fiber to be installed for RO by Feb 20, 2019
27.
RO for GS' —work to be done; and by whom
28.
Step Up Transformer for Cable
29.
Step down transformer for Cable
30.
Need to engineer a switch for when Cable from LSJ to GSJ fails
31.
Engineering doors (28)— confirm arrival dates
32.
Chillax Bath A/C— Reefco — when will it be finished
33.
Roof Materials — No new EFIS — check with Rich Kahn
34.
Septic Tanks — hole dug — dates from Adam Cook
35.
WIFI — Review ABI. bids by Friday — Brice to send bids to Darren and Darren to review.
36.
(Dock?) pebble beach — Friday
37.
Confirm awnings shipped and will be picked up on January 9 or January 10, 2019
38.
Wooden Nursery Steps —JE to review
39.
Service Doors and Service Gates — Bamboo Coverings
40.
Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or
January 10, 2019
CONFIDENTIAL
SDNY_GM_00332681
EFTA_00205407
EFTA01309381
41.
Planter by Pool wall
42.
Christmas Cove Dock
43.
Tiki Hut Kitchen—JE to choose color
44.
Nursery Steps —JE to review
45.
Waterfall layout —JE to review
46.
Grotto — JE to review
47.
Five Palms Electrical —Answer by January 9, 2019
48.
Cabana 3 — Artistic Tile to be ordered by January 7, 2019
49.
Maids and crew— Decision regarding Stephanie to serve as point person for supervision
50.
Debris and materials on top of RO to be cleaned up immediately
51.
Cost You Less — Karen to sort out by January 10, 2019
52.
L51—Jeffers doing Roads — DKI to speak to RK
53.
Dock Lights — Mike Glidden to follow up with the person hired for this work
54.
Staff Bathrooms
55.
Under Cabana 2 — storage and piping
56.
Island Oxygen bottles
57.
First Aid Kits for all locations on both Islands
58.
Pool Heater
59.
Cistern Drains for Main Compound
60.
Hurricane Prep Materials organized and accounted for
61.
Solar System for Flagpole on GSJ
62.
Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc.
CONFIDENTIAL
SDNY_GM_00332682
EFTA 00205408
EFTA01309382
63.
Staff Cottage Dryer — Purchase one appropriate for propane use
64.
Pool Rooms electrical panels replacement
65.
Power to beach for Captains below staff cottage.
66.
New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift
67.
Blue Beach office — electric transformer
68.
Staff Cottage water heater issues — dugout underneath Staff Cottage.
69.
Refurbish water distribution manifold
70.
Furniture package — Karen to complete by January 11, 2019
71.
Pebble Beach house — 2 additional crew members requested
72.
Security — including power & internet to docks so motion detecting Ring devices can be
Installed
73.
Karen to review household supplies and cleaning equipment and materials needed
74.
Water flowing up hillside on GSJ {location not clear from notes]
75.
New kitchen fridge for Mike's cottage
76.
Countertops and Vanities everywhere on GSJ and LSJ
77.
Pinto's people — June 17
CONFIDENTIAL
SDNY_GM_00332683
EFTA 00205409
EFTA01309383
Little Saint James
CONFIDENTIAL
SDNY_GM_00332684
EFTA_002054 10
EFTA01309384
LOCATION
MARINE - BOATS
MARINE
MARINE NAUTICA
LSJ GROTTO
L.S1 - FIVE PALMS
LSI • FIVE PALMS
LS) - GYM
LSJ RO
IS) -ELECTRICAL
LSJ • MAIN COMPOUND
GSJ - ma HOUSE
TASK SCOPE
Broken lulls
Broken tractors
Broken boats
Nautica rotten wood on floor and midship entrance
Uttle C needs new engines
Dead Solar batteries
No Quonset hut• Starting 14th January. Max 4.5 weeks barring no
DPNR Issues
Kyle
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. This MI
causes changes to layout inside budding drawn.
Kyle
MANAGER
Sheridon
Sheridon
Randy/Patrick
Carlos
Randy/Patrkk
Mike Glidden
GS/ Staff Cottage and Bedroom Addition: Tile is being laid, siding
to start, roof installation in proven, window door install
Kyle
Stairs and Grotto Sun Louvers: EB pricing received. Was told to
put them off and sun louver company will do this? ES can still do
this if green light is given. It will be 2 weeks from start date.
Kyle
Five Palms Windows and Doors: Reviewing JPK bid on 7th
January. ES has missing scope off verbal, so sent detailed scope
for pricing.
Rye Palms dome
Five Palms electrical
Gym doors to be replaced
RO still not working property: Seawater intake pump MI
Engineering doors still not even delivered
Rusted Lights
No solar lights
Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the Booring company
weeks from arrival of
flooring company)...
Kyle
Cabana tile redo?
Kyle
Chillax bath
Kyle
Cabana and Chillax Floors: AHF has been contacted. JPK and AHF
to discuss pricing for insurance.
Kyle
Chillax Tray Ceiling
Kyle
MI kitchen: Tile samples awaiting approval, kitchen demosd, tile
is next step, then cabinets, etc.
Kyle
Big Tad: Brian to finish deck 2 days, roof starting (leaves 3.5
weeks for roof install and finishes
Kyle
Office Pavilion roof material not ordered: Awaiting BWC Sub-
PcoPosal. Pokey on site 7th January 9am to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review.
Kyle
Kyle
Mike Glidden
Kyle
Mike Glidden
Kyle
Mike Glidden
Anna
CONTRACTOR/4Si STAFF
START DATE
COMPLETION DATE
Caribbean Motoring
Caribbean Motoring
Offshore Marine
BVI Painters
Offshore Marine
Pro Solar
Expert Builders
IPK Development
Expert Builders
JPK Development/Expert Builders
Samson Builders
EGS
Gemini Seawater Systems
Taylor, Cotton & Ridley
innovations (CHINA/
1F-K Development/LYE
IPS Development?
IPK/AHF
ISLE
Brian Bates
kyle
IPK/Augustus Henry/BWC
2/15/2019
2/1/2019
1/25/2019
1/31/2019
cC
C
Li_
O
SDNY GM 00332685
_
_
EFTA_002054II
EFTA01309385
ti
71:
in
Np
O
O
r_et
(Si - MAIN COMPOUND
MBA roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
MC on site 7th January 11 am to review.
Kyle
JPK/Atlustus Henry/BWC
Cabana 4 root Awaiting BWC Sub-proposal Pokey on site 7th
January 9am to review. (4.5 weeks each roof). BWC on site 7th
1.51- MAIN COMPOUND
'January 11 am to review.
Kyle
JPK/Augustus Henry/BWC
Dump truck
Sheridan
Fuel buck
Sheddon
Flatbed
Sheldon
Tender
Meriden
651-GENERATORS
Gerwmators not Let online
Mike Glidden
CH -SEPTIC
Septic net yet connected
MB* Gliddrm
%elan Botanic&
G51 - RO
RO delivered end of January 2019
Mike Glidden
Gemini Seawater Systems
651- RO
Pumps: Interconnecting piping, power end control conduits,
power to the seawater pump station and the anchoring of the
container.
Mike Glidden
GeMni Seawater Systems
Pumps not working
fa Glidden
I51- TECHNOU3GT
NORMS* WM or Internet Outsourced
Remain.
VITA/2Guys (Earl)?
GO -TECHNOLOGY
No Rabble WIR or Internet Outsarced
*Male
VW-4UP (Carl)?
Pebble beach not poured: To begin neat week on rebar footing
end pour for FDs. Then stare wall and roof schedule dependent
on wall g weeks tentative Pith.
Mile/DePson
ISIS
3/8/7019
151-ROADS
Rost net started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January. Jeffers In discussion with
lawyers on credit.
KS*
Easonleffers
—
—
IS'- MAIN COMPOUND
Muter shower
Kyle
Palm trees- need start date
Masco
MeTeeS Turf & Landscape Nursery
LL • ADMIX
Staffing
JE/HM
Countertops: a kitchen company to come down
Kyle
Cabanas 14 Vanities: a kitchen company to come down
Kyle
651 - STAFF COTTAGE
Furniture for Staff Cottage
JUICerwie
Wardrobes for all Cabanas and Carpetsfor chiles
1E/Kanma
Stark Carpet
MICHELLE'S TRANSPORT
gig N repairs
Pascoe
Mate Del Rey PR
LS1 - MECHANICAL BUILDING
Engineering budding fted
Kyle
G51- MECHANICAL BUILDING
EngbeerIng bulltling new one bulk
Kyle
Ailed Steel
Carts
Sheldon
Palmetto MotorSPons
Landscape oc&ment
on
Fertilizer and spraying
.f
...—
Damson
Stream Landscape
611- DOCKS
Docks consOlietiOn
ti
Kyle
L51- DOCK
Dock - IPE
Amerken Erport
--k
le
Cables to be run: Installation and termination of the fiber optic
W• RO
cable between the PO plant and the seawater pump station.
Mike Glidden
Gemini Seawater Systems
SONY_GM_00332686
EFTA01309386
en
§I
1.53 • ELKIRICAL
Condon BM* LSI • Seawater and Fiber - started: WAPA Switches
to be purdwei
,
Mike Glidden
'SI - MAIN COMPOUND
Slone Wall to be butt Schedule and budgeter/abashed • starting
10th January
Kyle
Danny
3/29/2019
Maln compound pool earnings to be put up
Kyle
Sylvester
Fiber to be run
Mike Glidden
I
MARINE
let ads
RIM
d
Y/Pen
Sheldon
MARINE
Boat trailers
*
Randy/Parkk
South Florida Stagers
Water trailers
Make Glidden
AM Attachments
Shower tiles to be redone
4*
PK Development
LSI-LANDSCAPING
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leavewetD •
erect post and
Kyle
151-LANDSCAPING
Nursery steps to be feed
Kyle
WE Development
Cabanas curtains
Alberto Panto
1/12(1059
ISI • MAIN COMPOUND
Kitdien banquet.
Custer, Carnes
Cabanas Bed Neter,
Custom Canvas
uu
u
C
0
SDNY_GM_00332687
EFTA01309387
CONFIDENTIAL
SDNY_GM_00332888
EF1,00205414
EFTA01309388
New LSJ-GSJ Mandatory Punchlist 5-17-19
a
smartsheet
**** MANDATORY
LSJ/GSJ Punchlist
%theeing, Stipmenti & Vlttg Vendors
Exported
equipment
nt Iiiii 2rotihcatInFLngis. sail
MoldlbefAnediation
on STT Ahedge:
Clear,
ikew
1
LSJ/GSJ
Daphne 8 Anna
Seth Ettinger - Restore 8 (2-3) arrive 61I2 remediatircen'beeginseEM.e(5) areas on GSJ
e
Mike's
More LLC
Room, 2. Living Room, 3. Office. 4. Twin Bedroom, 5. Master Bedroom.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym.
2
LSJ MC Krtchen
Karyna & JE
Banquette
Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas.
3
Master Bedroom
Karyna
JE Pillow
Should know more after our trip on June 3rd.
4
Emergency Room
Anna 8 JE
EKG Machine
Order EKG Machine. JE to advise.
5
Theater Room
Anna 8 JE
Blackout Curtains
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the door openings. Awaiting quote
from TJ "Home Theater Markel" for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
4 Panels of 11ft Sin Long (135in), All 12 Panels are 4ft Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/30).
C
u_
6
7
Housekeeping
Housekeeping
Anna
Anna
Washers
Dryers
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
0
12
8
Gym
Anna
Flooded
Gym flooded on 5/30. all equipment moved to R/O Storage on 5/30.
Floor removal began 5/31/2019.
10
9
Sam's Place
Anna
Furniture
Order Living room furniture 8 Kitchen Table
.4
10
LSJ/GSJ
Anna 8 Daphne
Solar Lights
Solar lights from China - departed from China 5/21 - 45 days to MIA -
EDA FL 7/3.
11
LSJ/GSJ
Anna & Daphne
Sun Umbrellas
Order 15 Cream Colored Sun Umbrellas. JE will choose.
.t'
12
Theater Room
Anna 8 Daphne
Drapes/Curtains
Wrinkle out the Drapes/ Curtains in the Theater
Order lighting for the Saltpond water fountain. Arriving to the Palm
13
LSJ Salt Pond
Anna
Fountain Light
Beach house on 5/30. Arriving on plane 6/3
14
LSJ Helloed
Anna
Medical Kit
Purchase Medical items for Helipad Office
15
Chillax Room
Anna
Chillax
Deep Clean Chillax room. Smells funny
on Juno 6. 2019 6127'52 AM BOT
Page 1 of 18
SDNY GM 00332689
_
EFTA_00205415
EFTA01309389
No.
Ares
Who
, Items
Descim:
18
17
18
19
20
21
22
23
24
25
Welder
Five Palms
Grotto
New Road
LSJ Generator Room
GSJ Cottage
GSJ Helloed
LSJ Tunnel
Wreckshop
HM Storage
28
LSJ Fuel Room
27
Engineering
28
GSJ sum Cottage
INItl
I1S 11218181
GSJ Barn
GSJ Terrace
GSJ Pool Extension
Waterfall (711d or Juggly
Park)
Gym
Flagpole Pool
Flagpole Pool
Michael & Custom
Welding - Terrance
Philip
Sylvester & Boniface
Peter Elie
Michael & Jeffers
Michael & Contractors
Michael & Contractors
Peter Elie
Michael & Bill Terry
Michael & Bill Terry
Michael & Contractors
Reefco
Michael & Contractors
Jeffrey Boschulte
Jeffrey Boschulte
Jeffrey Boschulte
Jeffrey Boschulte
Peter Elie
Michael & Contractors
Michael & Contractors
Michael & Contractors
Welding
Large Windows
Road Project
Hurricane Shutters
Expert Builders
Temente Philip. Custom welding has stated that he will be movig the
gate sections out to LSJ 5/29 on Little C but cannot proceed with the
installation due to the rain. Mike told him to proceed with moving the
material to the island for now.
Large Windows on each side to be installed
Ismail scheduled to deliver and begin install by 5/31; will work around
weather. The installation will take around 10-14 work days.
Completion Date ? (6-8 weeks)
Forms and lighting installation complete by 5/25. Concrete pour TBD.
Helloed
JE advise "H to be Bigger. JE to review 6/5
Skin it
40x60 Bld.
00x00 Bpd.
Vents
Doors
Permits
Permits
Permit
Permit
Slab
Doors
Shade Structure
Freezer
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
Recommend going with Allied.
JB reviewed and approved drawings 5/22. MG approval and sign off of
the plans will be sent to Buck Steel 5/24.
Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied.
Install Vents in Fuel storage room. Dave reduced initial quote by 4500.
ordered 5124; EDA on STT by June 15th and will then schedule install
Install Engineering doors. John Bedminster has estimate forthcoming.
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out: JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK will notify JB once tax clearance letters back: JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to Ex. who will submit the completed application on behalf of the owner.
Permits: Barn - JB awaiting selection of supplier and specs.
Build 75 foot round terrace.
Extend current pool to 80 feet from 15 feet.
Bid coming from John Bedminster
Waiting for three bids. John Bedminster. EB. Mr. Gumbs
JE advised not to order a freezer.
Expired on June 6,2019 60752 AM BOT
Page 3 or 16
FL
uu
C
u_
0
SONY GM 00332690
_
_
EFTA_00205416
EFTA01309390
37
38
38
40
41
42
43
44
45
46
47
No.
Who
Items
Description
36
LSJ TR' Hut
Dock GSJ
Dock LSJ
Christmas Cove
Moorings
Old Generators
Flagpole Pool
Five Palms
Five Palms
GSJ R/O
GSJ New Dock
GSJ New Dock
LSJ/GSJ Cables
48
Permit
49
Heavy Machinery
Trencher
50
LSJ Library
51
LSJ Fadlty Entrance
52
LSJ MB Bath
53
LSJ Main Compound
54
Tunnel Entrance
55
LSJ Helipad
56
LSJ Dock
Exporters on Juno 6. 2019 6 07 52 ALl BOT
Michael & Contractors
Amy Dempsey
Amy Dempsey
Patrick
Michael & Bill Terry
Michael & Contractors
Franks Electric
Peter Elie
Michael & Contractors
Michael & Jules
Michael & Jules
Michael & Paul
"Global Tech"
Amy Dempsey
Michael
Michael
Sylvester & James
Sylvester & James
Sylvester & James
Sylvester & James
Sylvester & James
Mike & Brian Bates
Freezer
Permits
Permits
Moorings
Old Generators
Shade Structure
Concrete
2nd R/O Intake
Dock Expansion
Water Sport Ramp
Underwater Cable
Underwater Cable
Roofing & Trim
Service Gates
Shower Tiles
Mockup Planter
Tunnel Gate
Hell Service Gate
Water Sport Dock Box
Order Freezer for Tikl hut kitchen: on STT 5/28 • cleared. off-loaded,
awaiting pickup for transport to LSJ.
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
North). 2. Christmas Cove Service Doc*. 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
under review by CZM.
Request moorings for Christmas Cove
Sell old Generators: Bill Terry to coordinate sale of the old generators.
Rich to speak with Bill.
Shade structure is replacing need for awning.
Electrical work to be done at Five Palms
Need more direction from JE. He was not pleased with current layout.
Bob Peterson coming 5/23
JE said stop work on 5/21
JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday, June 2. AA Flight 1391
2:57PM. depart Tuesday. June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities. discuss the recent/previous improvements.
plans for both sides and thoughts on the protect approach. etc.
ACOE has reviewed the permits: their comments were addressed by
LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment
and an operator.
Carpenters will skin gates after welder hangs frames. Material on site.
Awaiting quote from John Bedminster. this project involves new shower
hardware, plumbing, and tile work
Mockup built (Measurments still in question) In•progress. On hold until
JE advise.
See ft49
See #49
Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5131 of completion date.
Page 5 0118
CD
u_
0
SDNY GM 00332691
_
_
EFTA_00205417
EFTA01309391
No
Area
Who
Items
Description
to Ig ISI5ISISIRISISI2 IS IS IS 19
Chrietrnas Cove
GSJ Tiki Terrace
GSJ Tiki Terrace
LSJ/GSJ Ilk' sheds
Barn ?
GSJ Terrace
Sam's Place
GSJ New Dock
LSJ Tildflut
Cabana 1
Flagpole Pool
GSJ
GSJ Guest BR
Main Compound
71
Tiki Terrace
72
LSJ Dock
73
Tunnel
74
Christmas Cove
75
Sam's Place
76
77
78
79
80
Emergency Room
LSJ Island
GSJ Island
Chilies
New WIFI System
I x;..xt,,n on June 6. 2019 6 0? 52 AM BOT
Brian Bates
Brian Bates
Brian Bates
Brian Bates
Danny & Keshaun
Brian & Ron
Maurice & Boniface
Maurice or Sylvester
Maurice or Sylvester
Maurice or Sylvester
Maurice or Sylvester
Maurice or Sylvester
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
Jermaine & Liston
Jermaine & Liston
Jermaine & Liston
Jermaine & Liston
Jermaine & Liston
Container shed
Small Dock box
Wooden Furniture
Thatch
Barn
Chandelier
Bedroom
Dock Shed
Coral Stone
Shower Tile
Kickplate
Tiki Bar
Carpet
Ceiling
Brown Paint
Polyurethane
Roof
Structure
Bedroom
Fax
Emergency PA System
Emergency PA System
8T TV
LSJ/GSJ WIFI
Structure complete. TJ to paint (Paint began 5/24)
Small dock boxes for Towels and other items (Measurments ?) Is this
new or is this the dock box Brian already built.
Chest is complete. Lighting to be installed by 5125.
Order thatch to be installed after Hurricane Season. (70) rolls ordered,
on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT.
Supplier to be awarded
Repair Ceiling. Lighting socket needed
Build New Dock Shed. JE to Advise (4 Posts in place at sight) See #70
Maurice began tile work today 5/31.
Shower floor is not draining properly
Install Kickplate
Fix Cabinet & Drawers
Cut Carpet to size. Carpet to long. Need to be centered under both
beds
Stain ceiling above the White Table
Deck to be stained
Polyurethane Boardwalk
In progress. Repair holes on tunnel roof
Material to arrive 5/28 work to start 5/28.
Paint after repairs are made
Phomnismet & WA
Pending setup of Efax account
Island wide system for intruders
Island wide system for intruders
Order 82 TV for Chides Room and proper wall mount —5/29/19 -
Pricesmart will have the 82* Samsung in stock
Completion date. [5-29-19 All Will, Access Points and switches and
currently waiting on 5 addition switches to handle the distribution of
existing phone services.) [5-29-19) GSJ Wifi is in progress this week]
Page 7 of 16
C
0
SDNY GM 00332692
_
_
EFTA_002054 1 8
EFTA01309392
No.
Area
Items
81
GSJ
Jermaine & Liston
Cameras
82
LSJ Cistern 1
Michael & JCH
Cistern Pump
83
GSJ RIO
Michael & Gemini
Seawater Systems
R/O Container
84
GSJ RIO parts
Michael & Gemini
Seawater Systems
R/O Parts
85
R/O Water
Michael & Smiley
Water Testing
86
Cabanas 1-4
Danny & Keshawn
Dimmers
87
Flagpole Pool
Danny & Keshawn
Dimmers
88
MC New Planter
Danny & Keshawn
MC Planter & Palm Tree
Lighting
89
Tiki Waterfall
Anna, Danny &
Keshawn
Pond Fountain
90
Flagpole Pool
Danny & Keshawn
Kitchen
91
GSJ Peters Point
Danny & Keshawn
Solar Lights/Other
92
Cabana 1
Danny & Keshawn
Rope Light
Master Bedroom
Danny & Keshawn
Wall Sconce
94
GYM
Michael 8 Liston
Equipment & Audio
95
Chillax
Danny & Keshawn
Phone Plug
96
GSJ Master BR
Michael & Charlie
Master Bath
97
Library
Reefco
Air Handler
DescnMon
Camera setup at Christmas Ceram Pending Mike to order Yeti Solar
Units and Panels as per email 5/24/19 (5/29/19 GSJ Dock Nest
Camera is active)
WO&Enolneedni
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
placed the order for the pump 5/24. Production time is 6 weeks • the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7f21
On Island on GSJ
On Island
5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
Install Dimmers
Dimmers not working properly
In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at
the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house. or on the plane.
Run wires and plugs property. Make hole in cabinets if needed. Plugs
and wires should not be seen
Lighting facing Peters Point for Safety
Test in place. JE advise that we order more. Brighter than what's
installed at the moment.
Wall sconce does not come on around the Master. Timer to be set
6:30pm -5am ?
Wiring need to be done for GYM Equipment & Audio
Replace or fix phone/Internet plug in Chillax
PkwribIng & Reefoo
No Hot water
Replace air handler for the Library. Dave ordered 5/27: current lead
time 7-8 weeks plus transit time (4.5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
Exported on June 6. 2019 807'52 AM BOT
Page 90118
<
CD
u_
0
SDNY GM 00332693
_
_
EFTA_00205419
EFTA01309393
0
N
In
Np
O
O
r_94
12'.
124
125
Area
Who
Items
Description
98
99
IT Server Room
Cabana 1-4 Air
Conditioning Units
100
GSJ
101
LSJ Laundry
102
GSJ Solar Lights
103
LSJ Landscaping
104
GSJ Stones
126
108
- GSJ
V 108
107
108
LSJ / GSJ Landscaping
109
GSJ Beach
Island Wide
110
Reek*
Reefco
Reefco
Reefco
Gael & Nicholas
Cnstobal & Fabian
Danny & Renol
Dupson & Deice
Dupson
Dupson
Dupson & Daphne
Landscapers
Landscapers
NC Unit
A/C Unit
NC Unit
NC Unit
Temp arc installed. Board ordered. Waiting on schedule.
Shipping next week and hopes to have by May 31st. Goal is to install
week of June 3rd. PM already on routine schedule for Cabana 4.
PM already on routine schedule. Bedroom. Kitchen & Living Room
Housekeeping NC is not working
WISIIIIIMaasairromon a stonswiais
Install Solar light on GSJ so JE can see those lights from Master
Solar lights
Bedroom on LSJ.
Irrigation
Install irrigation for new palms
Stones
Stones from GSJ to LSJ to create and fix all Stone walls
Plant oleanders on the left side of the MC staircase (behind the parking
on the Beach). (50) 3 gallon White Oleanders purchased 5/22 from ABC
Nursery. Cliff updated container EDA on STT 5/29: should be off-loaded
and available for LSJ to pick up on 5/31. pending weather.
(12) Ficus trees (6-T OA) and (200) 3 gallon White Fountain grass
Ficus & White Fountain purchased 5/22 from ABC Nursery. Cliff updated container EDA on STT
Grass
5/29: should be off-loaded and available for LSJ to pick up on 5/31.
pending weather.
Jute Erosion Control
JE sourced on Online Fabric Store: purchased 5000 yards for all LSJ
Cloth
and GSJ erosion control projects. EDA to Tropical FL 6/7.
Order Pesticides & Fertilizer for all plants and palms Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
Chemicals &
Lawnmower Headquarters quote for Stihl and Silky equipment
Landscaping Equipment approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
Move teak furniture off of GSJ waterfront to Flagpole at Holy Shit Point
Remove all Orange Vines from plants on Island. Main Compound &
Island wide. Orange vines will kill the plants
White Oleanders
Teak Furniture
Orange Vines
Wreckshop & Heavy Machinery Operatiar*
Exported en June 6. 2019 6'.0752 AM B07
Pepe 11 of 16
C
u_
0
SDNY_GM_00332694
EFTA01309394
is:
111
HM Equipment
Tap & Dale
Ouadski
115
112
HM Equipment
Tap & Dale
Fuel Truck / Flatbed
1 14.,
113
HM Equipment
Tap & Dale
Mules
137
114
HM Equipment
Tap & Dale
Electric Carts
116
HM Equipment
Tap & Dale
ProGator
139
118
HM Equipment
Tap & Dale
Roller
I4 `
117
Old Heavy Machinery
Tap & Jules
Removal
41
118
GSJ Engineering Shed
Jules & Buck
Bens
119
GSJ
Jules
Trenching
120
LSJ Tild Hut
Jules or Peter
Tiki Parking
121
Wreelcshop
Rychie
Office
122
123
Nautica Boat - NC,
Tubes. Structure
Sport's Boat
Carlos, Patrick &
Randy
Patrick & Randy
NC
NC
Exported on June 6.2019 697'.52 AM BOT
We are working On the Ouadski, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan. Blowers Throttle Blipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week - If the dutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval
Turn Fuel truck into Flatbed
Kawasaki does not manufacture electric vehicles yet.
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
sent for undercoating (Rust proofing process) 5/31.
John Deere does not manufacture electric progators, only electric
gators.
Arrived on STT 5/22. Cleared, off-loaded. awaiting transport to LSJ.
MG will schedule barge to pick up directly from Tropical Shipping STT.
Create Berm to block LSJ view across from the R/O Containers
Trenching Area & Description needed
Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5
Clean office immediately 6/5
Rai Its
Sporb
Nautica delivered to Offshore Marine Subbase 05/18/19. Offshore
Marine has scheduled Jesus the tube guy for 5/31 to remove tube and
ship out. Fiberglass repairs will start right after.
Pape 13 of 1B
H
uu
C
SDNY GM 00332695
_
EF1'A_0020542 I
EFTA01309395
N
in
Np
O
O
r_<
124
GSJ Water Front
Patrick & Randy
Sail Boat
125
Christmas Cove
Patrick & Randy
Boat debris
126
New Crew Boat
Patrick & Randy
Crew Boat
127
AYH / Big N
Boscoe & David
Fenders
128
AYH / Big N
Boscoe & David
Cleats
129
AYH/Big N
Boscoe & Robed
Blankets
Lemire
130
PR /Big N
Boscoe & David
PR Repairs
131
PR / Big N
Boscoe & David
Nana
132
GYM
Kevin, Garth, & Mike
GYM
133
JE Denali
Carlos & Caribbean
Auto Mart
NC
134
LSJ Suburban
Carla & Cliff's Auto
Repairs
Accident
Exported on June 6. 2019 6.07'52 AM BOT
Remove damaged sail boat
Remove boat debris
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
5/24. Production lead time is 10 weeks. EDA to production completion
8/2.
Install Cleats al AYH Barge slip
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
the flange blankets were too shod and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5' I'm sorry. I don't have an answer as yet' He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. He will continue to call Bobby. Barge arrival home could be
$tween June 10th-15th
Take Nana to Offshore to get the Engines Checked
Cleaning. Organizing & DEMO
Demo Flooring in the GYM
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
Insurance Coverage & Repairs to be made. Carlos awaiting estimate
from Cliffs Auto Repair - by 5/31. Carlos will take the vehicle to
Guardian 5/30 for adjuster's inspection.
- &Power
Pe 16 al ill
C
0
SDNY_GM_00332696
EFTA01309396
CONFIDENTIAL
SDNY_GM0033269,
EFTA_00205423
EFTA01309397
ri:KOZ.00- VJL43
869ZECOO-W9-ANGS
0
0 z
C
z
-
3 '
Mk_
SAL_
Sheridan
Caribbean Motoring
SWILIaliteLn
_Ragan
Broken lulls
Broken tractors
Sheridan
Caribbean Motoring
MARINE-BOAR
Broken boats
Re
/Patrick
'Offshore Marine
MARINE
Navdca - rotten wood on Boor and midship entrance
Carlos
EMI Painters
MARINE • NAUTICA
Little C • needs new retries
Randy/Patrick
Offshore Marine
GSJ • SOLAR FARM
Dead Solar batteries
Mike Glidden
Pro Solar
GS.I • BACK OF THE HOUSE
No Quonset hut Starting 14th January. Max 4,5 weeks barring no
DPNR Sun
Kyle
Expert Builders
VLS/2029
GS) • BACK OF THE NOUSE
No RO Building/Generator bunker: Need an Architect for
plumbing/electrical drawings for RD system design. This SU
causes changes to layout Inside building dram.
Kyle
G51- STAFF COTTAGE
GSJSIeff Cottage and Bedroom Addition: Tee Is being laid, siding
to start, roof Installation In progress, window door install
Kyle
JPK Development
2/1/2019
IS/ - GROTTO
Stairs and Grotto Sun Louvers: ER pricing received. Was told to
put them off and sun louver company will do this? CB can still do
thls if green light is given. It wil! be 2 weeks from start date.
Kyle
Wert Builders
(Si - FIVE PALMS
Five Palms Windows and Doors: Reviewing JPK bid on lth
January. EIS has missing scope off verbal, so sent detailed stone
for eking.
IKyle
1PX Cemplopment/Emert builders
LSI • FIVE PALMS
Five Palms dome
Kyle
Samson Builders
Lil- FIVE PALMS
Five Palms electrical
Mike Glidden
LSI - GYM
Gym doors to be replaced
Kyle
WS
LS) - RD
BO still not working property: Seawater Intake purnIS
Mike Glidden
Genial Seawater Systems
LSI • MECHANICAL BUILDING
Engineering doors still not even delves
Kyie
Taylor, Cotton Li Ridley_
Rusted Lights
Mike Geddes
ISI - lANOSCAPING
No solar Reis
Anna
Innovations (CHINA)
W• MAIN COMPOUND
Cabana 3 inoperable: The badt op and pipes repaired. Awaking
anivaldates of the flooring company (2 weeks how arrival of
).
Kyle
In Development/WE
Cabana the redo?
Kyle
OK Development?
(Si- MAIN COMPOUND
iChillax bath
Kyle
Cabana and Chian floors: ANI has been contacted. 'PK and AI*
to discuss pricing for Marmot.
9 1
!ISMS
IS) • MAIN COMPOUND
Ogles Tray Ceiling
Elle
LSI -TIM HOUSE
Mt Idtchem Tile samples awaidng approval. kitten demo% tile
is next step, then cabinets, etc
Kim
WE
1/25/2019
-----";
2/31/2019
Gli • TIM NOUSE
Big rad: Brian to relish deck 2 days, rod star*, Cleaves 35
weeks for roof install and finishes
Kyle
Marl Bates
Office Pavillon roof material not ordered: Awaiting MC Sob-
proposal Pokey on site 7th January 9am to review. (CS weeks
each roof). BWC on site 7th January 21 am to review.
'Kyle
JPK/Augustus Henry/MC
EFTA01309398
CONFIDENTIAL
SONY_GM_00332699
EFTA_00205425
EFTA01309399
(-)
0
z m
m z
r
00LZIE00- 01O- AN0S
Conduit Bank IS) • Seawater and Fiber - started: WAPA Switches
to be purchased
Mete Glidden
Stone Wall to be bolt Schedule and budget established • starting
10th January
Kyle
Danny
3/29/2019
Main compound pool awnings to be put up
Kyle
Sylvester
Ebert° bent
Mile Golden
MARINE
let skis
Randy/Patrick
gladden
MARINE
Boat trailers
Randy/Patrick
South Florida Trailers
Water balers
Make Glidden
AN Attachments
LSI • MAIN COMPOUND
Shower Mes to be redone
Kyle
/PK Development
151-LANDSCAPING
Pergola waterfall to be poured and shelter built: Need to
establish layout of post, then our slab (with post leave-outs)-
erect POSY and
Kyle
131• LANDSOWING
Nursery steps to be fixed
Kyle
PK Development
151- MAIN COMPOUND
Cabanas curtains
Alberto lento
1/18/201!
Kitchen banquette
Custom Canvas
151- MAIN COMPOUND
Cabanas Bed Netting
Custom Canvas
EFTA01309400
CONFIDENTIAL
SDNY_GM_00332701
EFTA_00205427
EFTA01309401
LSJ and GSJ Schedule
smartsheet
IW/;fill11.7C-1
vit
0
Taak Name
Finish
Assigned To
Comments
2
GSJ Projeds:
North T.
4
See Wait • Grading
Jtres
5
Dig Out Small Gen Butter
Kyle
cLl
6
Underground DectrC
7
Won ktesh1 Framework for Pad
. Mho
led
e
Concrete Pour
9
Saw Cuts and Seaang
Ind
led
Center Point Set 8115,18 by JEE
IV
Sign ON (Work Up b Standards)
Kyle
11
12
RO Scam GS)
13
Onste Dairen
1.54
&sang delivery
14
Installation and testing
IS/
15
Seawater intake
Gemini
need to dig hole
16
17
GS/ Big Tild
01125/19
Brian to finish roof / test S of decking Monday
LLI
18
19
05.1 Bunker Building RO / Gen
Contractors to Bd (ED /JPW:) DPNR • Need Melted
20
Site Prep
21
Construction
LSJ
TOO (Select Contractor)
Jules to dig out tinker area (Kyle and EIG to layout)
12 nook Construction Schedule (CMU Intl)
L
22
Tinting of Equiptmont
Mite
23
Sign Offs
24
Kyle
0
25
Refurtish/ExterW 0 Hut Rigth
02115/19
DPNR Issues • proceeding
28
Repair and Extend 0 Hut
EB
ED to start 15:h Moir Masai trol0 he hip back on 15th
27
Roller Doors
EB
28
Sign Offs
Kyle
29
30
GSJ Start Cottage Finish
0201/18
DPNR • Staling Back Thursdoy Interior
31
GSJ Septic Tank
Adam Cock
Baton
32
Construction
JPK
33
Furetwe Package
Karen
Karen to order
34
Sign Offs
Kyle
35
38
GSJ Mar House Sepik Tank Finish
stopped after DPNR eel trio to proceed Jan 2nd
37
Installation of New System
Adam Cook
Beata
Page 1 Crti5
SDNY_GM_00332702
00
N
411
in
Np
O
O
et
I
EFTA01309402
Np
O
O
ct
is.
PrOied Name
=nc
1/iltir •
38
39
40
41
Ocencitron Of Old Sysylen
Sile Week/Sign Offs
GSJ IT Work
Adam Cock
Kylo
Contractor
42
ALV
11/30/18 earl • SG
43
44
LSJ Projects:
45
46
Main Cenwund Wail Finish
03/2819
Darny to cane out friday, Kyle larked to him last Friday lo ember
49
Master Rod Finish
tad
All materials on LSJ /SST - Receiving 2 mar bids this week
49
50
Master 8Mhroom Finish
51
Extend terrace Design TBConlin-ad
JEE lo deed°
52
New Shower Hardware
Plumber tbd
53
Repair Shower / Light Tie Work
54
New Shower Floors
55
56
Library Roof Flash
and
All Materials on LSJ I SST - Receiving 2 mac ads this week
57
58
Flag Pool Cabana Interior Finish
:td
Temp Counters to start, ordering from FL
59
Ktchen Remodel
GO
61
62
Main Compound Cabanas
Gran:erten
ltd
E8
Final Counters Punagst cleanup! flaws to be redone C8-3
From FL now?
0
63
Maio in
LSJ
In Progress 2/4
64
65
Chile Room
ter
65
AC Unt
rrika I reek°
In Progress
67
68
TIM Kitten
01/25,(19
Demo clone - lie next glen catinels installed, counter lops, Slashes
69
Electrical / Plumbing
tad
Centralia Mike
Mike
70
Larger Store Apron Front
ltd
Contractor
Use new Carrie
71
77
Dock Sheller
13
New Decking
td
LSJ
IPE order amount confrmed -design needs confirmation and to be pactased
74
Storage Lockers
ltd
B.1
Sample material cn Dock - Waiting Approval
75
Page 2 of 5
SDNY_GM_00332703
EFTA01309403
76
Smal deck Shalom
77
Planters
tbd
LSJ
SW want planters?
78
79
Pops Garden
80
Order New Shade House
tat
88
JEE to review midge
81
82
Generator 2 Retail Elnish
take
sent VR bSnco 1147 due back 11-30. install then lesbrg (2 Wan)
83
84
Engineering Bulging
85
Demo / Construm row Bulang
ltd
Design tbd
Brice reached obi to John Wads with comments, no response yet (10(10)
86
87
Pebble Beech
88
Fisheannsna Hut
onsf19
Dupson / Kyle
Redg Foolng ar4 Start Pour
89
Foundation
Gipson / Kyle
Push after NY0 to dig our again. lay rebar. pots FDs
90
91
Flie Palms
Reviewing Bids now / Gass order reviewed and resubmit requested
92
New Roof
ltd
Design TBD
new 904 Dome (Salami is pricing vigh Anna) • drawing giren by LSJ
93
Light Ste Work
ltd
Design TBD
Garden design needed la wall and slab
94
New Volndows
ltd
Design TBD
Rectived 04 had issues. Rev6e and resubmit
95
New Doors
tbd
Design TM)
Need to Sea new dams for openng size for oontraclas
96
New electric/ Feeder tine
Ion
Desip TBD
Mice to do wak grcugh wig contractor (electrical)
97
98
SEW Bathroans Gas Stales,
99
Doers and Haidivare replace
tbd
100
Window Replacement
ltd
101
Plumbing issues
lbd
102
Gamete
tbd
103
104
IT Issues
105
Now Cell Tower Bid
rod
Bnce
106
107
Perrrittkg
108
Cables
LSJ•GSJ
109
Deck
LSaGSJ
110
&Wars) Permits
7.1
112
Emergency Room
13
Design Matena List
ltd
Owner to confirm
•ter
Design Approval
Page 3 of 5
SDNY_GM_00332704
EFTA01309404
Project Namo
115
116
111
118
Equipment Ceded
Installabon
Hanger Saint
119
Rod Roper
TBD
awaiting permits
120
New Doors
TBD
awaiting permed
12;
122
Roods
123
Jeffers Prkkg Revisions
Jan 1401 tentative start dale given by Jeffers
124
125
Seaga Gates Finish
126
Build New Gates
Bamboo for Gates
127
Ostia/atm
LSJ Carpenters? Or Ell for small nook
128
129
Boat List
130
Spu0s Tube Replacement Fine,
tbd
Captains
131
Ink C Reit
rod
Captains
132
Big N Nudes Firish
ttd
Captains
133
134
Equipment
135
TL1295D
Ind
IS)
EDA lo TX
136
272 D2 Skid Steer
ltd
IS)
TX 10/31 EDA to FL pending
137
John Deer Tractor
led
LS)
Brice selected model and pricing
138
139
140
Mike G. Elootrioal List
141
Palm Tree Wiling
lake
Ongoing
142
Courtyard Lighting
take
Ongoing
143
Pod cabana kitchen electric
bike
Ongoing
144
Calle" AC
hIM
Ongong
145
Dock Lighting aid tine
hike
Ongoing
146
Camera for Staff dotage
Mee
Pending
141
°Mem drains for Main Compound
Mite
Pendng
148
ductank goon GenBld to Tunnel
hike
Ongalig
149
Movie Room Speakers
take
Ongoing
150
ReplacePool Heater
Milo
Ongoing
151
Repair both Fuel Pumps
Mite
Ongoing
152
Raper Diesel Feeding Owned
Mktg
Pending
153
Install Water altribution Pumps LS!
take
Pending
Page 4 of 5
-J
O
C
SDNY GM 00332705
_
_
EFTA_0020543 I
EFTA01309405
Project Name
Er
45SigneC
15e.
Returtish way elistribdion menaced
Irike
0W 919
155
Instal New Sewage IA LSJ
Mike
Ongoing
156
Ds Walerheater Staff Cottage
Mike
POndin
157
LSI Tiki Kitchen Rernalel ElectricfRumbing
lake
Organ;
156
Blue Beach Transformer Replacement
Mere
Mike to Outsource
159
Electrical and Data lo 5 Palms
Mike
Charles tact& to Price
160
Dectrical Conduit Work at Toner
Nike
Organ]
161
Solar System and Electric Pebble Beath
Mke
Roof Dane -Ongoing
162
Power to Beach for Captains
Mile
Pending
163
Fear Replacement Seawater Intake
Mike
Pairing
164
Refurbish Fee System &Weld
hake
PericIng
165
Fuel Truck Replacement
Mite
Pending • Orioles To be colocled
166
Replacement of Elec Panels Pool Rooms
MAE
Penang
167
Electric out to new wale/81 area
Mire
pending
169
Replace Al Emma" Light Tnm to White
Mice
panda;
169
Replace MI Exterior Swathes
Mike
Ongoing
170
Staff Collage Dryer Cnange to Propane
hike
Perang
171
instal Lights low Library Statues
Mike
Pending
172
New Awnings Both Pool Areas
Mke
Pending
173
Install New Sewage Troop-will Punt
Mho
Ongong
174
Wire New Generators GSJ
Mike
Pending
175
Install Electric GSJ TM
Mike
Ongoing
176
Replace Batteries GS) Solar
!Aka
Percher,
160
161
67
Rosen
H
uu
C
SONY GM 00332706
_
_
EFTA_0O205432
EFTA01309406
Jim Dalton & Co., Inc.
Ardcn, NC 28704
dba Jim Dalton VI
LSJ
Schedule of Values
DATE
116119
•
PROJECT
LSJ
DESCRIPTION
CITY
RATE
TOTAL
Residence: Deposit
I
25,000.00
25,000.00
Demolition and Dry-in includes remove existing copper and thy in
1
23,600.00
23,600.00
Copper bend copper and install, all locked and soldered.
I
19,500.00
19,500.00
Roofing Installation
I
45,400.00
45,400.00
Library: Deposit
I
25,000.00
25,000.00
Demolition and Dry-in: includes remove existing copper and dry-in
I
21,800.00
21,800.00
Copper: bend and install, all locked and soldered
1
22,500.00
22,500.00
Roofing
1
34,000.00
34,000.00
1_1/44
1
(t? \ 1/4O-Cli • ‘— —
IrVIDISti
e:
!
k
it
I
irif
-
TOTAL
S216,800.00
Phone It
Fax 4
E-mail
CONFIDENTIAL
SDNY_GM_00332707
EFTA_00205433
EFTA01309407
7 Week Look Ahead Schedule
17
Jelh." I gesi.
I}
1,..1~
kei
14
1.114.4,1,4441 11 L14.1 441 G6! n4Y.f
IS
Caf... boy LSJ.
14
cnintS1
I7
DaSS.4.4n NN, L5I
la
Nøss Elialcal
IS'
Pv:1 ol.entuars
10
MiC Caf.. la toe",
SI
ega
to 1114407
721
Cale• ant 0444. Rom
Exporled on Januar/ 6, 2019 8.01:12 AM PST
smartsheet
tan; b arn..)...~.4n
P.
dx•
.1~100 le.n.1.19,,..~
On. b
ba
mf , R.~0
~h
33
raa, W tv.".I
8, 4
"
Sab'S
"bel 1. 4 114. 441,1444
µ.> bp 45.44. Nar,.
gMR issa
OW1.1 i 4Mb bern ialwookeeier~
br
7b4.
Oc~t~i
I ~a
Yrt
V. reid wAnnaea
Pl...17) NO. ~Ib
14, W "am!~
0.~
~
4~x, 02.”
T b to...u.P .
4 01~
~smi ~g
REM 44~ 04 11344.41 0449.fly a neLl Sbn Bøn« d
I
001 j..
~soya..
teictiaa2.« ,. ol.wetl ib w10444 ~loe
Mn nat
fi.ob.7øø/".09.29.4,•~1~..)04~
>sn b ba at (4
ad.
bø II .nlIcnbf
pr.2,3
W.121,113 b/ Ven,* ra .kbbirr•
wa .1,0
!Stana 'bevis/nakne. tnt.,
inna a...b14...
Jan b Ca~ 7.240. I lm ~1~
J.. 1411 J ~N
d114444149.444, se barn 01 1rea
44:'n4.W4TM1
caunl 44.nus !MC
b lell ~ab,
snd
an14,44 i4447 2 4444,1414 4on n4,144»
bnb0 ~al
• A'.1.
Møna ~y<
cia
I!~
FL m0.0~
co'.4 O s'
11.1~ ..~y
14
444 ia tan
444 arif 4.4 Mt li Stoa prcne 14. nunn
WantabnlWtl.apO•eN
Page 1 of 1
z
11.1
z
0
0
SDNY GM 00332708
_
_
EFTA_00205434
EFTA01309408
c Cc-0
I.)?)
CAL
CONFIDENTIAL
Ak
SDN,GM_00332709
EFTA_00205435
EFTA01309409