Case File
efta-efta01367359DOJ Data Set 10CorrespondenceEFTA Document EFTA01367359
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01367359
Pages
0
Persons
0
Integrity
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
3I May 2015
Integrated Oil
US Integrated Oils
Pf Mary
GrOWth
Drivers
Near-term production growth will be supported by several project start-ups.
The recent (and worth noting 'on schedule') starts of the Kizomba Satellites
Phase 2 and Block 15/06 West Hub Development projects in 2O15 are the
chief drivers of 300 mbpd of crude growth through 2017. The long-term
production outlook will be driven by the ramp from fields in the Kaombo Block
32. and contributions from currently unsanctioned projects (Cameia).
Primary Risks
Geopolitical risks withstanding, the key risks to production in our forecast
window include a delay to project start-ups particularly the ramp from the
Block 32 fields (projected on stream in 2017). and the delayed sanctioning of
several projects including the high profile Cameia project (anticipated tate 2015
FID with peak oil production by 2018 of 80 mbpd).
Project Delays: Through 2017, primary risk is in delays to the starts of two
key projects: Block 15 NE Hub and the Kaombo Block 32. Although largely
in process, there could be limited risk of delays associated with cost
reduction efforts in the current environment. Incremental production from
the Kaombo fields in Block 32 (2017 target project start) is expected to
reach a peak capacity of -230 mbpd by 2020. Deep water depths,
dispersion of fields, and high presence of salt imaging has the potential for
increased technical risks.
Sanction Delays: Including Cameia unsanctioned projects represent nearly
all the incremental crude production from 2017 to 2020. Cost reduction
will be a significant driver of accelerated FID activity; Cobalt is currently
estimated Cameia YE15 sanction on estimated development costs of
<$20/bbl and assumed $2Bn in estimated cost savings.
Figure 71: Key Growth Project!). 2014-2020
14144
114114000
ken
iles
On..0
..In1.AI
Oni•I
MI
ItS stamp,.
M
Pitetvi
00.4.1=1 / 4 4
44111041440
F»rOr4411M.Mrl
AM4
Pop 444
1044 14/114
VruMfl
PP
wJNd..YInM
ItS
NIS
1010
Ill
111
Rtiferi.a.
Me,
AM.
(..(term
oihrtbet ita.“
Ilt•W•CW.10
Or
IM.s
Ws
.44144
three.,
OnInNin
JO.
•
M1
401
not
MP
MI
U
V
Si
1141 V..414
1144 1401411 Pat
AN.
00444114
11....< at.
1444 P014
1774
In
ON
IA. Mt Or tvitgares
444004.4441
I,
11.
11.7 /
lit
nut
Sala
I,
19
ill
GI
ISM IfIVOnt
AM,.
tv9.4/ft
tn..'
1.44.( , 11))
Oh*. . @mac.* 1,....
I.
144
ISO
tb•lorOt..•1 ,,,,,,,
n7OY.Onw.nnr..
M
I/
VA/
Ht.
AI),
MS
CO
0
LOD
II
401 4 Pix/4 01
Art1ta
It
ttOM
VI
RA)
son
II
1104 V(.T/11t
.11111.
a.Ory.Y.1
t...t•eso
104
MN
1464/400.010.444
11
/64
AP
a
0. .
ions.
Nrtr•orn
...iv.
I chin ...m.4 , 1i ...ell
1He
.
nN
lth II
0
II
Sane
Detach, art.
4404 MICA0414
Deutsche Bank Securities Inc.
Page 41
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)
DB-SDNY-0058892
CONFIDENTIAL
SDNY_GM_00205076
EFTA01367359
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Flight #
AM4Phone
14114000Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.