Skip to main content
Skip to content
Case File
efta-efta01738545DOJ Data Set 10Correspondence

EFTA Document EFTA01738545

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01738545
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Visoski Sent: Thursday. October 27, 2016 2:27:41 AM Subject: BBJ Associated Meeting To: Je vacation <[email protected]> IMG 0165.JPG IMG 0164.JPG IMG 0166.JPG IMG 0168.JPG IMG 0170.JPG Jeffrey, Met with 2 reps from Associated Air today at BBJ,. Gene Carter Mx sales and Glenda with interior design. They brought some samples along as well, in photos below,. Gene will provide firm quote in 2 weeks while they research Mod status of the BBJ in regards to radar, lower cabin altitude mod, and plating cost from Gold to Nickel. With new floor plan change, we'll need approx 6 more rapt chairs,. Gene informs BBJ has 16G seats. Our 727 had 9G seats, we could use the seats from 727, however, they could NOT be used for Takeoff and Landing. Gene estimate Seat frames at $50k each, depending on options: such as Seat rest, lumbar, electric, etc, and once covered, $125k Each. There is a savings using some of the 727 seat frames. If you use our 9G seats, the FAA regulations for density of seat foam is much less restrictive, compared to 16G build up foam regs, we have to clarify with Eric. LCA Lower Cabin Altitude (LCA) mod cannot be accomplished by Stambaugh in my opinion after speaking with Gene,. A lot of Log book research, liaison with Boeing and the STC holder which I believe he said was Lufthansa is required. Work scope: -Radar upgrade, -Wife KA band -Interior soft goods -floor plan change. -exterior paint. -counter tops -wood resurface Gene provided general price, since they refurbish 4 BBJ per year, and many Green completions. Wood, sand, stain and clear to darker color, $600k to $800k, —he informs $1.4M for re Laminate of wood. Gene didn't think our wood needs re-Laminate, he thought, sand, stain and clear would make like new,. Maybe some wood repair or replacement of Galley and entrance by fwd door. -changing Gold Plating to Nickel or chrome is $300 to $400k, Plating alone is approx $200k, the rest is labor intensive, with switch panels,. -Airline quality paint job is $175k / VIP Corporate Paint $350k, With High build paint, I don't see the benefit of a VIP paint, since BBJ would not be in Hanger. These are only Budgetary numbers, at this time. All is set for your 9:30am meeting with Eric at JFK, SheltAir FBO. Thx Larry EFTA_R1_00026100 EFTA01738545 Sent from my iPad EFTA_R1_00026101 EFTA01738546

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.