From:
Larry Visoski
Subject: Fwd: Update
Sent
Monday, May 2, 2016 10:32:51 PM
To:
Je vacation <[email protected]>
From Pete
He will speak with Tech rep tomorrow for more clarification
Thx
Larry
Sent from my iPhone
Begin forwarded message:
From: Pete Rawson
Date: May 2, 2016 at 6:29:19 PM EDT
To: Larry Visoski
Subject: Re: Update
Hi Larry,
Nice to hear that the flight went well.
I'm still looking forward to several more flights to confirm.
Maybe we have cured the control system side of the issue.
I will talk to my local Gulfstrcam Rep tomorrow, if he doesn't have the answers, he will
follow-up with Savannah.
The only time that the readings would be zero is on takeoff when the bleed air is the
hottest.
Sorry, I do get out of the seat soon after take-off, but won't stand in the entranceway
during take-off to read the panel!
Maybe not even then, depending on conditions;
Air Temp, reduced power takeoff, altitude and others.
There is a procedure to clean the unit, but above what we could do-
Remove it, pressure wash inside and out, soak in specific solvent for 24 hours, rinse
numerous time, steam clean and bake in an oven till dry.
Reinstall. 20 man hours for RJR, plus time spent doing the cleaning.
The best way to clean it would be send it out to a shop where it could be submersed and
the unit pressure checked.
I would expect at least one week with a quick turnaround request to do that.
EFTA_R1_00027238
EFTA01739033
The best price available for exchange is about $8,500. They only have 1 unit
repaired/exchange.
Gulfstream price is about 11K for the same.
We have changed 4 that I can see in my records, all for cracks found during the pylon
inspection.
That is where we started with this- the crushed line found doing the pylon inspection-
I agree with JE that the voltage/pressures indicate a clogged, or less efficient precooler.
The left side, showing 3 PSI, indicates that it is more open to the fan air supply to the
precooler trying to cool the bleed air into the cabin supply.
More fan air required to get the 400 degrees in the manifold equates to the lower numbers-
The right, at 7, indicates that there is less fan air required to maintain the 400 temp, more
efficient.
The 40 hours for R/R were given to swap them, records show 20 hours for the R/R of
each one.
I would recommend replacing the left side precooler next visit.
Regards,
Pete
From: Larry Visoski
Sent: Monday, May 2, 2016 12:26 PM
To: Pete Rawson
Subject: Update
Pete, the flight was very very smooth Jeffrey was very very happy however the voltage
was 7 V right side 3 V left side as normal, Jeffrey asked if you could contact
Gulfstream tech support and ask him regarding the voltage? If we should ever see
zero indication, Jeffrey also asked if you could find if there is a procedure to clean
or functional test the integrity of the pre-coolers?
I told him it was 40 hours minimum per side to exchange, can we get a price for a new
precooler to have for him also many many thanks Larry
Sent from my iPhone
EFTA_R1_00027239
EFTA01739034
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02097596
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01731630
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02068749
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02101901
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02165734
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02078835
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.