Skip to main content
Skip to content
Case File
efta-efta01744607DOJ Data Set 10Correspondence

EFTA Document EFTA01744607

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01744607
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Sent: Subject: From: To: Cc: Wednesday, July 8, 2015 3:43:53 PM New Maintenance and Worksho Buildin - Daphne Wallace Jeffrey Epstein <'eevacation ann rodriquez Jaredian meeting regarding bids - July 8, 2015 Rich Kahn Greetings Sir. For your review and comments are the notes and infonnation from the phone meting w lh John this morning regarding your reguc.i for his hid on the commiction of the New Maintenance and Workshop Building. Iliac are the components that must be included in the bid: Demolition of the existing building, including the existing 60X80 floor slab Excavation and compaction of soil for foundation Foundation, including footings, Bade beams and slabs Steel superstructure and exterior walls, doors and rooting Electrical and mechanical systems (site utilities) Shipping and transp.stution to LSI Erection and constriction costs Ifie questions that have been created due to your request, that need your advisement are the following: I. the drawings presently show the 74 by 80 foot building merged into the existing wreck shop. The wreck shop will have new sheathing to match the new building. There is also an infill where Jamdian is proposing to place the Landscaping Shop. Do you wish for the existing buildings to in fact mccive Dew sheathing to merge with the new building, or for the new building to stand alone? 2. In order to complete the final design, which would include the foundation design and building permit set, Jaredian is respectfully requesting your consideration and decision on one of the Steel fabrication building companies. 3. Jaredian is also respectfedly requesting you to sign the C7kf application for the new Minor permit for this new Maintenance and Workshop building. The process for obtaining that permit is 2 months. This process should be started as soon as possible. We will have the application for your review and signature on your return. In the meanwhile, Jaredian will schedule to meet with Anna and Danny to determine the elcchicalinechanical requirements. For the purposes of budget, an this stage, the best guess at building cost for this t)pc of stricture is approximately 5150 per square foot: 74 X 80 feet - 3,920 square feet at SI3Oloot - 5888,000. In order to establish a fixed cost or budget for this project, the drawings will need to be completed in their entirety, where bids can be solicited from contractors, mooned= utilizing the Constriction Management Guaranteed hraximtm Price (LIMP) outlined in landiaa's correspondence. Respectfully, Daphne EFTA_R1_00036943 EFTA01744607

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.